Ready to put my strong work ethic and 15+ years of experience to work in a new role. All aspects of maintaining and repairing community units and common areas. I possess a unwavering general philosophy, always put tenants first. That one simple phrase has never let me down with regards to tenants' relations and moralsIf tenants are well taken care of if tenants are well taken care of, management is also happy.
Overview
36
36
years of professional experience
Work History
Maintenance Technician II
Solari Enterprises Inc.
Los Angeles, California
12.2025 - Current
Ran work orders according to importance and date received.
Coordinated move out inspections with tenants, initiated ordering of materials for unit turns, and scheduled necessary vendors for efficient turnover.
Inspected Solari Enterprises facilities for mechanical, electrical, and safety issues
Repaired HVAC, plumbing, lighting, and door systems across Solari properties
Performed preventive maintenance on equipment, fixtures, and building systems
Trained newer technicians on safe tools, procedures, and facility standards.
Operated hand and power tools to complete repairs.
Responded promptly to emergency breakdowns at any time during shift hours.
Cleared clogged drains and replaced valves, faucets, and fixtures.
Maintained detailed records of maintenance activities to support operational transparency and facilitate future planning.
Inspected grounds and buildings to identify and mitigate hazardous conditions, ensuring safety and compliance with property standards.
Diagnosed mechanical problems using visual inspections and test instruments.
Requested and ordered necessary parts, supplies, or equipment from catalogs and suppliers to support maintenance tasks.
Maintenance Technician II
Avalon bay properties
Monrovia, California
07.2025 - 08.2025
Performed preventive maintenance on HVAC, motors, and material handling systems.
Trained newer technicians on safe tools, procedures, and facility standards.
Operated hand and power tools to complete repairs.
Responded promptly to emergency breakdowns at any time during shift hours.
Removed blockages from clogged drains to ensure proper drainage in plumbing systems. and replaced valves, faucets, and fixtures.
Maintained accurate records of all maintenance activities performed.
Repaired or replaced faulty wiring, switches, relays, and other electrical components.
Inspected grounds and buildings to identify, minimize and correct hazardous property conditions or liability concerns.
Diagnosed mechanical problems using visual inspections and test instruments.
Read and interpreted equipment and work orders to properly perform required maintenance services.
Responded to personnel queries and troubleshooting requests to provide repair services to improve operations.
Troubleshot complex electrical and mechanical issues with minimal downtime.
Disassembled appliances to diagnose problems and facilitate repairs.
Changed HVAC filters and cleaned condensation drains to perform preventive maintenance on HVAC systems.
Trained junior technicians on best practices for machine operation and repair.
Ensured proper functioning of facility's HVAC system by performing regular maintenance checks.
Procured necessary parts from suppliers to facilitate timely repairs and maintenance., supplies or equipment from catalogs or suppliers.
Adjusted devices or control instruments using hand tools, levels or straightedges.
Maintenance Technician II
Essex Property Trust Inc
Los Angeles, California
11.2024 - 05.2025
Responded promptly to emergency breakdowns at any time during shift hours.
Troubleshot complex electrical and mechanical issues with minimal downtime.
Responded promptly to emergency breakdowns, minimizing downtime and ensuring operational continuity.
Cleared clogged drains and replaced valves, faucets, and fixtures.
Changed HVAC filters and cleaned condensation drains to perform preventive maintenance on HVAC systems.
Executed work orders systematically in order of importance and date received.
Executed work orders systematically by prioritizing urgent requests, enhancing workflow efficiency.
Operated hand and power tools to complete repairs.
Inspected grounds and buildings to identify, minimize and correct hazardous property conditions or liability concerns.
Maintained accurate records of all maintenance activities performed.
Trained junior technicians on best practices for machine operation and repair.
Disassembled appliances to diagnose problems and facilitate repairs.
Completed basic carpentry tasks and installed shelves, hooks, and closet rods to meet customer needs.
Trained junior technicians on best practices for machine operation and repair, fostering skill development and team competency.
Ordered parts, supplies or equipment from catalogs or suppliers.
Maintenance Technician II
Whs managment
Santa Monica, California
12.2023 - 09.2024
Repaired plumbing, electrical, and appliance issues in occupied and vacant units.
Performed preventive maintenance on HVAC, filters, lighting, and building systems.
Responded promptly to emergency breakdowns at any time during shift hours.
Cleared clogged drains and replaced valves, faucets, and fixtures.
Repaired or replaced faulty wiring, switches, relays, and other electrical components.
Performed preventive maintenance tasks, including lubrication and cleaning of machines and equipment.
Diagnosed mechanical problems using visual inspections and test instruments.
Read and interpreted equipment and work orders to properly perform required maintenance services.
Completed apartment maintenance requests for Westwood residents and common areas.
Inspected grounds, hallways, and amenities for safety hazards and repairs.
Responded to resident concerns with professional and courteous service.
Documented work orders, parts usage, and repair notes for property records.
Operated hand and power tools to complete repairs.
Cleaned work areas to maintain a safe environment free from debris or hazardous materials.
Assisted in the installation of new machinery and equipment.
Completed basic carpentry tasks and installed shelves, hooks, and closet rods to meet customer needs.
Disassembled appliances to diagnose problems and facilitate repairs.
Changed HVAC filters and cleaned condensation drains to perform preventive maintenance on HVAC systems.
Trained junior technicians on best practices for machine operation and repair.
Ordered parts, supplies or equipment from catalogs or suppliers.
Procured necessary parts and supplies from various catalogs and suppliers to ensure timely repairs.
Maintenance Technician
Conam management corporation Westwood apartments
Coalinga, CA
11.2022 - 02.2023
Implemented preventive maintenance practices and upheld equipment guidelines to avoid failures.
Diagnosed problems with mechanical and electrical systems and equipment using advanced troubleshooting abilities.
Conducted performance and safety inspections on equipment and machinery to uphold operational efficiency.
Managed work orders to complete tasks promptly and maintain service standards.
Ordered materials and maintained inventory in maintenance shop for operational readiness.
Disassembled appliances to diagnose problems and facilitate repairs.
Operated hand and power tools to complete repairs.
Diagnosed and corrected mechanical problems using blueprints, repair manuals or parts catalogs.
Read and interpreted equipment and work orders to properly perform required maintenance services.
Recorded type and cost of maintenance or repair work.
Planned and laid out repair work using diagrams, drawings or schematic diagrams.
Enhanced property aesthetics through landscaping and grounds maintenance.
Plumbing Technician
Reliable Rooter & Plumbing, Inc
Costa Mesa, CA
12.2011 - 05.2017
Was able to effectively respond to customer requests via phone and email, as well as answer questions
and inquiries.Correctly installed pipes by determining the dimensions, sizes, and shapes that were
required to replace faulty pipes.Completed preventive maintenance on water heaters, toilets, urinals.
and plumbing fixtures.Deciphered blueprints to determine material locations, quantities, and
sizes.Provided emergency services to install and repair toilets, water heaters, appliances, and showers to
maintain 100% customer satisfaction ratings.Followed all state plumbing codes throughout the duration
of each project.Reviewed blueprints and project specifications to determine proper plumbing
solutions.Used crimping tool and victolic connections to fit valves, couplings, and assemblies to tanks
and pumps.Local, state, and federal agencies provided me with documents, clearances, certificates, and
approvals.Resolved plumbing issues and enhanced customer satisfaction through effective service.Communicated
with customers to offer repair recommendations, estimate project costs, and set project completion
dates
Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace
faulty pipes
Completed preventive maintenance on water heaters, toilets, urinals, and plumbing fixtures
Provided emergency services to install and repair toilets, water heaters, appliances, and showers tomaintain 100% customer satisfaction ratings
Provided emergency services to install and repair toilets, water heaters, appliances, and showers to
maintain 100% customer satisfaction ratings
Reviewed blueprints and project specifications to determine proper plumbing solutions
Deciphered blueprints to determine material locations, quantities, and sizes
Obtained necessary documents and clearances from local, state, and federal agencies to ensure compliance.
Resolved plumbing issues effectively, improved operations, and provided excellent customer service
Communicated with customers to offer repair recommendations, estimate project costs, and set project
completion dates
Assessed the quality and condition of sewers and piping systems
Created openings in structures for plumbing installation in structures to accommodate pipes and pipe fittings with a wide variety of tools and
equipment
Tested pipe systems by filling them with water and air to find leaks
Communicated with customers on a regular basis to provide repair recommendations and estimate
project costs and completion dates.
Plumber
Los Angeles, CA
03.2009 - 02.2011
Thoroughly inspected pipes and piping systems to assess quality and condition
Fixtures, water mains, natural gas, fire systems, and backflow preventers were all maintained and
repaired by me
Managed tools, equipment, and inventory on service truck to ensure operational efficiency.
Assisted with repairs to steam, drainage and sewer lines
Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace
faulty pipes
I'm removing and replacing customer bathroom suits and tiling
Pay close attention to detail when tiling kitchens and bathrooms
Installed valves, hangers, supports, and flanges inside piping systems
I'm removing and replacing customer bathroom suites and tiling
I am responsible for developing and maintaining positive relationships with all tenants and customers
Clamps, brackets, and hangers were used to secure pipes to structures
Performed various plumbing services and repairs to address customer needs.
Made piping by measuring, threading, and cutting materials at the proper angles
Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace
faulty pipes
Insulated adaptations for disabled individuals to enhance safety and accessibility.
Repaired plumbing systems, components, and equipment.
Preventative maintenance on water heaters, toilets, urinals, and plumbing fixtures was completed by
me
Hidden water line leaks were discovered
Secured rising mains and boiler piping to structural supports in new construction and remodeling
projects
Assessed the quality and condition of sewers and piping systems
Secured rising mains and boiler piping to structural supports in new construction and remodeling
projects
Worked on projects independently while also assisting other teams with process coordination and
collaboration
Adaptations for disabled people are insulated
Communicated with customers to offer repair recommendations, estimate project costs, and set project
completion dates.
Plumber, Pete Fer & Son Plumbing and Supply Co
Los Angeles, CA
10.2008 - 12.2010
Thoroughly inspected pipes and piping systems to assess quality and condition
Fixtures, water mains, natural gas, fire systems, and backflow preventers were all maintained and
repaired by me
Keep track of the truck's tools, equipment, and inventory
Obtained precise results by performing precise hydrotesting
Cut openings in structures to accommodate pipes and pipe fittings
Made piping by measuring, threading, and cutting materials at the proper angles
Followed all state plumbing codes throughout the duration of each project
I am responsible for developing and maintaining positive relationships with all tenants and customers
Tested pipe systems by filling them with water and air to see if they were leaking
Requisitioned tools and equipment to help me choose the type and size of pipes I'd need for various
projects
Used drain cleaning equipment to clean sewer lines
Plumbing services and repairs in general
Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace
faulty pipes
Complied with all state plumbing codes throughout duration of each project
I'm in charge of ordering and pricing materials for contract projects
Used ground microphones and listening discs to find hidden water line leaks
Reviewed blueprints and project specifications to determine proper plumbing solutions
Am in charge of inspecting contract work and liaising with customers
Communicated with customers on a regular basis to provide repair recommendations and estimate
project costs and completion dates.
Lead Maintenance Technician
Bob Pringle multiple properties owner
Inglewood, CA
05.1990 - 03.2006
Maintained air conditioning systems by replacing air intake filters and repairing malfunctioning
systems
Maintained air conditioning systems by replacing air intake filters and repairing malfunctioning
systems
Used gas welding equipment to weld metal parts according to the layout, welding diagram, or work
order
Hoists, drills, precision measuring instruments, and electronic testing devices were among the hand and
power tools I used
Kept the plumbing system running by repairing leaks, clearing drain clogs, and [Action]
Used gas welding equipment to weld metal parts according to the layout, welding diagram, or work
order
Completed advanced training in [Equipment] handling and cleaning, as well as safety and heavy
equipment procedures
Used mowers, snow blowers, chainsaws, electric clippers, sod cutters, and pruning saws in a safe
manner
Consistently took on additional responsibilities and worked long hours to meet project deadlines
Kept grounds clean and maintained landscaping by removing debris, watering, fertilizing, mowing and
[Action]
Designed and executed the layout and installation of electrical wiring and fixtures based on job terms
and city regulations
Kept the grounds clean and maintained the landscaping by removing debris, watering, fertilizing,
mowing, and [Action]
Dug trenches, backfilled holes, and compacted the earth to prepare for new construction
Removed damaged tile, brick, and mortar from surfaces
Prepared and administered preventative maintenance work orders to ensure equipment reliability
Applied caulk, sealants, and other agents to the surfaces that had been installed
Filled chipped, cracked, and broken bricks and tiles with adhesives and grouting materials to correct
surface imperfections
Filled chipped, cracked, and broken bricks and tiles with adhesives and grouting materials to correct
surface imperfections
Erected ladders, scaffolding, and hoists to transport supplies to roofs
Cleared debris from construction sites and prepared them for use
Used mowers, snow blowers, chainsaws, electric clippers, sod cutters, and pruning saws in a safe
manner
Used power saws, sanders, grinders, cranes, drill presses, forklifts, and basic hand tools, among others
things
Kept the grounds clean and maintained the landscaping by removing debris, watering, fertilizing,
mowing, and [Action]
Hydrostatic water testing was done by me
Used a waterproofing compound to coat the walls
Made a porridge of catch basins, poured concrete, and sawed off asphalt
Used arc welding, tig welding, and plasma cutting equipment to repair metal structures, components,
and manufacturing machinery
Tile, carpet, and [Type] flooring were laid and repaired by me.
Mixed materials for catch basins, poured concrete, and cut asphalt
Delivered excellent customer service
Tile, carpet, and [Type] flooring were laid and repaired by me.
Education
Woodrow Wilson High School
Long Beach, CA
Skills
Code compliance
Understanding schematics
Mechanical repair
Troubleshooting skills
Power and hand tool use
Electrical component replacement
Repair planning
Parts ordering
Diagnostics troubleshooting
Cutting torches
Facilities repair
Wiring installation
Equipment dismantling
Metal welding
Piping systems maintenance
Preventive maintenance
Cost documentation
System installation
Maintenance scheduling
Mechanical knowledge
Equipment repair
Physical strength and stamina
Critical thinking
Accomplishments
Customer service experience
Blueprints
Complete Paint
Light Frame Repair
Design and fabrication
Construction means and methods
First Aid/CPR
Schematics reading
Commercial leasing structures
Landscaping
Multi Drill
Welding
Construction machinery operation
Residential construction
Lifting up to 100 lbs
Mechanics
Proficiency with mechanical and electric tools
Clean D.O.T
Spot Paint
Dependable independent worker
Plumbing
Electrical
OSHA compliance
Exceptional problem solver
Strong work ethic
Customer service
Strong communication skills
Good at following instructions
CDL license
Residential plumbing
Knowledgeable of applicable local codes
Maintenance Work
Pipe laying
Good mechanical aptitude
Power and Pneumatic Tools
Power tools
Commercial plumbing
Excellent driving record
Tiling
High School - 1985
Woodrow Wilson High School - Long Beach, CA
Professional Summary
Skills
Education
Plumbing Foreman/owner - November, 2017 to March, 2019
J.C
Remodels - NORWALK, CA
Was in charge of planning and delegating work for multiple construction crews.Estimated the time, material, and labor costs in project plans.Cleared debris from construction sites and prepared them for use.Figured out the best construction requirements and layouts.Implemented changes requested by designers, owners, or inspectors to conform to specifications or updated demands.Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace faulty pipes.Followed federal and company regulations to ensure that all job sites maintained a high level of safety.Evaluated each employee's strengths and assigned daily tasks based on their knowledge and skill sets.Was able to maintain positive relationships with all of my clients.Made sure that site work was done safely and in accordance with the budget, schedule, and applicable building codes.Calculated the amount of materials and labor needed to complete jobs on time and within budget
Estimated the time, material, and labor costs in project plans
Cleared debris from construction sites and prepared them for use
Figured out the best construction requirements and layouts
Implemented changes requested by designers, owners, or inspectors to conform to specifications or updated demands
Correctly installed pipes by determining the dimensions, sizes, and shapes that were required to replace faulty pipes
Followed federal and company regulations to ensure that all job sites maintained a high level of safety
Evaluated each employee's strengths and assigned daily tasks based on their knowledge and skill sets
Was able to maintain positive relationships with all of my clients
Made sure that site work was done safely and in accordance with the budget, schedule, and applicable building codes
Calculated the amount of materials and labor needed to complete jobs on time and within budget
Was in charge of overseeing the installation, maintenance, and repair of plumbing systems and related equipment
Used power saws, sanders, grinders, cranes, drill presses, forklifts, and basic hand tools, among other things
Designed and executed the layout and installation of electrical wiring and fixtures based on job terms and city regulations
Applied caulk, sealants, and other agents to the surfaces that had been installed
Was in charge of keeping track of orders, activities, schedules, and employee performance
Hoists, drills, precision measuring instruments, and electronic testing devices were among the hand and power tools I used
Provided precise measurements and estimates for all projects
Wiring, plumbing, equipment, and machinery were all repaired by me
Consistently took on additional responsibilities and worked long hours to meet project deadlines
I'm in charge of a wide range of tasks, including pipe fitting, painting, carpentry, electrical repair, installation, and building maintenance
Placed an order for the supplies and materials needed for new work as well as the remodeling of existing systems
Followed all state plumbing codes throughout the duration of each project
Was in charge of overseeing material usage and contractor hours to ensure that projects stayed within budget.