Detail-oriented Technical Service Personnel specializing in troubleshooting and safety compliance. Demonstrated success in resolving complex technical issues, ensuring optimal equipment functionality and strict adherence to safety regulations. Proven ability to complete tasks efficiently across diverse environments, with strong skills in manual labor and equipment operation. Committed to maintaining a clean workspace and contributing positively to team dynamics.
Summary of Technical Service Personnel:
De-completions, completions, crown plugs operations, XT cap operations, interventions, SFL / HFL / EFL installations / recoveries, well jumper installations, XT / THD installations, XT / THD recoveries, SITs, dock testing.
The list of jobs includes:
2023 Jobs:
BPAT LWI DC 122 Intervention
OXY Horn Mountain West flush
BPTH LWI 822#17
BPTH LWI 822-11 Intervention
BPNK LWI F2 Intervention
BPAT LWI DC 801_IV
BP LWI DC 123 Intervention
BPAT LWI DC 801_IV
BPTH 775-3 LWI
Beacon Shenandoah 20k EVDT Offload
BPTH LWI 822-14_II
Chevron BF SFL Flush and Test 2023
BPAT LWI DC 124 Intervention - OSC1
CWOR Maintenance Work
Beacon Winterfell #2 - TH Buck-Up
LLOG Who Dat G2 SSTT SIT / LLOG Who Dat G2 TH Buckup
BPTH DC124 Stinger Removal @ Baker Hughes
Vessel Offload @ Port of Houston Watco Terminal
2024 Jobs:
BPTH SPi5 Tubing Head Install
LLOG Buckskin IV THD Loadout
BPAT LWI DC 314 Stinger Install @Baker
BPAT DC 215 Well Tie-In
BP Nakika Test Stump Interface @ Baker
Oxy HMW 126 #10 Dock Test (Galveston)
Beacon Caliborne Recomplete
LLOG STPC Seal Tests on Buckskin KC 785 PLETs
Oxy Warrior Jumper Support (Recovering LOT/LOLA)
Oxy Warrior Jumper Support Warrior Commissioning
Oxy Warrior SLOT Support
Beacon Winterfell #3 SSTT/THRT SIT
Beacon Winterfell #3 XT Install
BPAT LWI DC 112
BPTH MC822-22 LWI
LLOG XT and THD Offload at Watco
BPTH LWI 822-22 Intervention
BPAT LWI DC-322
BPAT LWI DC214 Intervention
2025 Jobs:
BPAT LWI DC-311
BPAT DC-123ST Decomplete
LLOG Salamanca Leon 3 XT Install
Beacon Winterfell 3 Intervention
Oxy HMW MC81-4 Completion
Oxy Conger 8 - WO SSTT / THRT SIT
Beacon SSOD EHXT + crates Offload
Oxy F22 and MC81#4 XT Loadout at Gulf Copper
Oxy GC 683-727-561 Interventions
Oxy Lucius KC 875 #4 THRT SIT
BPAT DC104 BOPSJ SIT
As an SSG Workshop Technician V, I preformed MOBs (Mobilization), SRT (Site Receiving Testing), IFI (Initial Factory Inspection), FFI (Final Factory Inspection), worked with engineering as required on MOBs and SRTs, assembled new production orders, and gantry crane movements.
As an R&D Lab Technician, I assembled and tested new equipment designed by engineering to meet API 17D and API 6A criteria. We tested with PR2 qualification, hydrostatic testing, gas testing, hyperbaric testing, bend frame testing using strain gauges, and prototype testing. Raw data was collected and prepared for engineering.
As a Workshop Technician Lead in Highbay, I lead a group of technicians in the assembly, FAT testing, and EFAT testing of customers' equipment for new builds. I assigned and monitored daily assignments, and communicated with engineering and management on activities, including issues.
Inspected and cleaned equipment before assembly, maintaining high-quality benchmarks.
Executed assembly of parts following precise procedures and drawings.
Performed hydrostatic and gas tests after assembly to ensure operational integrity.