I have 14 years of Oil and Gas Pipeline experience with Poly and Steel Pipelines, I’ve been completing oil and gas pipelines in a safe and timely manner. My duties would include submitting all required forms (JSA, Work Permits, Ordered Parts List, Completion Reports for well connects and abandonment's, Daily reports, Photo reports, I conducted safety meetings, I witnessed clearing, stringing, lowering in, bell holes, tie-ins, padding backfilling, grading, concrete pads, bolt up of risers, Installing Meter-Houses with Meter-Tubes, Air-Testing and Hydro Testing, environmental, cleanup, restoration and Seeding.
I oversaw Planning, directing, scheduling and evaluating quality and efficiency of contractors
Watch crews for safety and job quality.
Cost estimating on projects it requested.
Completed Oneok Pre-project form for all assigned projects
Completed required daily reports, hot/cold work permits, excavation and continued space entry permits, bell hole
inspection reports, foreign line crossing reports.
Allowed hot work to begin only after conditions are safe and all safety rules are complied with
Attended contractor daily tailgate safety meetings and helped point out the days safety topics
Monitored LEL, 02, CO and H2S readings when working in hazardous area.
Confirmed pipeline route and after one-calls recommend any needed changes due to unknown foreign lines
Advised changes are needed in route to make project more feasible.
Inspected ditch and backfill, inspect welds and fusions.
Verified with contractor that one-calls have been made and monitor and enforce expiration Date.
Verified Poly Fuse Qualifications and destructively test fusions daily.
Participated in lock-out tag-out
Scheduled meetings with Producers, contractors
with Landowners, ROW Agents, Forrest Service, Regulatory
I Determined where I should install meter runs, launchers/receivers and valve settings and confirm the location
with producer.
Modified design of typical fabricated assemblies to make site specific and send changes in design to fab shop
Ordered pipe and materials, track material used and coordinate return of left over materials
Witnessed pressure test and maintain all test records.
Assisted operations with line blow-downs and purges
Inspected ROW clean-up, Fences, gates, rock cleanup, line markers, signs, test leads, ROW seeding.
authorized hours for Hydrovac crews. Verified and authorized Footage for Boring crews.
I have completed 9 steel pipeline 10’’ to 18’’ Pipelines projects for FIS, Established and maintained up-to-date records of project steps of completion, schedules, and expenditure. Insured compliance of contracts per all applicable laws, specifications, and standards.
Preventing accidental damage to buried facilities and exposed pipe by visually monitoring excavation, backfilling and grading activities, maintaining crossline map, confirming that one calls have been completed and are up-to-date, witnessed of work completed according to scope of work and reporting daily progress (Daily Reports and Photo Reports)
Inspected Poly and Steel lines utilities for safety and compliance. Checked quality of construction and worksite policies. Examined documents such as permits, applications and records for each location. Maintained current understanding of Scope Of Work laws and regulations.
Contracted by Energy Transfer to oversee the clean-up and restoration of spread 7, 8 and 9 on the DAPL.
Ensuring the physical safety of any person on or around the right of way (ROW) and their compliance
with Energy Transfer, OSHA, and common-sense standards for workplace safety.
Ensuring that cleanup and restoration was completed according to the scope of work and reporting
daily progress (Daily Reports and Photo Reports) to the lead inspector for his Daily Report to the
project manager.
Established and maintained up-to-date records of project activities, schedules, and expenditure.
Insures compliance of contracts per all applicable laws, specifications, and standards.
Preventing accidental damage to buried facilities and exposed pipe by visually monitoring
Review and thoroughly understand construction documents. Permits, safety forms and restriction.
Completed and submit all required reports to Headquarters, conducted safety meetings. Constructed steel and poly pipelines, assembled lack units, bolt up on risers and tie ins to other pipelines.
Hydro tested pipeline kept records of pressure from digital and chart recording of psi.
Set up and maintained pigging procedures, record of all gauges and chart analyses.
Examined and observed on projects for completion status. Put in check valves, block valve, and gauges.
Ordered equipment, tools, and materials for project, Job preparation.
Operated Heavy Equipment, excavator, side boom, front end loader.
Dug ditch and bell holes, lowering in pipe. Completed tie in.
Shaded pipe, backfilled, maintained equipment, restoration clean up.
Constructed concrete forms, laid out rebar, poured concrete, built are risers on concrete pads.
Searched for leaks on pipeline and for damaged equipment, flushed, Hydro -Test.
Assembled steel and poly pipelines. Connected lack units to main line.
Tom Mccoy-Career-Chief-Company-SWI-701-502-1365
Stephen Emerson-Career-Chief-Company-CIS-831-620-2812
Joe Hess-Career-Chief-Company-FIS-715-520-7563
Brandon Harpole-Career-Consultant-Company-Exxon Mobile-701-210-1811