Resourceful Independent Contractor known for high productivity and efficient task completion. Specialized in project management, client relations, and problem-solving. Excel in communication, adaptability, and time management to meet client needs and deliver quality results on schedule.
Overview
31
31
years of professional experience
1
1
Certification
Work History
Independent Contractor
Self- JN Custom Tile
Upland, CA
03.2011 - Current
Created custom designs with mosaic tile pieces when requested by customers.
Installed various types of ceramic, porcelain and stone tiles on floors, walls and countertops.
Polished surface after grouting to ensure that it was even and consistent in appearance.
Assisted customers in selecting appropriate colors, textures and sizes of tile materials.
Maintained relationships with existing customers while seeking new ones.
Provided technical assistance to clients in using products or services.
Built successful partnerships with other businesses in related industries.
Reviewed customer requests, resolved questions and defined specifications before completing orders.
Delivered high level of customer service and support by answering questions and returning phone calls quickly.
Managed quality control and maintained high level of customer satisfaction.
Identified needs of customers promptly and efficiently.
Tile Installer
Corbin Custom Tile and Grnite
Corona, CA
11.1997 - 11.2009
Inspected work areas to identify any potential problems with substrate conditions or layout issues.
Attended training courses related to the latest trends in tile installation techniques.
Provided technical advice regarding installation techniques as needed.
Collaborated with contractors, subcontractors, architects, designers throughout the entire process from start to finish.
Inspected finished installations for quality assurance purposes.
Repaired damaged tiles when necessary by replacing them with new ones.
Adhered to safety protocols while working on-site at customer locations.
Cut and shaped tile into specified shapes using wet saws or tile cutters.
Cleaned up job sites after completion of projects including disposal of debris.
Grouted joints between tiles to fill gaps and create a waterproof seal.
Assisted customers in selecting appropriate materials for their tiling project needs.
Maintained accurate records of all jobs completed including photos where applicable.
Measured, cut, and installed ceramic, porcelain, stone, and marble tile in residential and commercial settings.
Kept tools organized and maintained them regularly according to manufacturer's instructions.
Positioned tiles on walls and floors using spacers to ensure evenness.
Followed industry standards for proper installation methods.
Prepared surfaces for tiling by removing existing flooring material or other obstructions.
Ordered flooring supplies and tiling equipment according to project requirements.
Cleaned and leveled surface areas and removed excess grout.
Delivery Driver/Insulation Installer
Saddleback Insulation
Orange, CA
02.1994 - 11.1997
Attended monthly safety meetings held by the company's safety department.
Communicated effectively with customers regarding their orders and estimated time of arrival.
Performed pre-trip inspections to verify vehicle's roadworthiness.
Received feedback from customers on performance and reported back to supervisors accordingly.
Provided exceptional customer service by being courteous and professional at all times.
Collaborated with dispatch team members to coordinate pickups and deliveries on time.
Reported any mechanical issues or safety concerns to management promptly.
Loaded, secured, and unloaded goods using appropriate loading techniques.
Repaired damaged insulation material with patching compound or new pieces of material.
Sanded down surfaces before applying foam-based insulations.
Installed insulation and vapour barriers in residential homes, commercial buildings and industrial facilities.
Followed blueprints or diagrams to ensure accurate placement of insulation material.
Applied sealants around windows, doors, vents and other openings to provide an airtight seal.
Maintained a clean work area by vacuuming up debris after installation is complete.
Ensured proper ventilation of wall cavities during installation process.
Wrote reports detailing the quantity of materials used per job site.
Used protective gear such as goggles, gloves and masks when handling hazardous materials.
Adhered to all safety regulations while working on ladders, scaffolding or roofs.