Overview
Work History
Skills
Timeline
Generic

JOHN WADDELL

Phoenix,USA

Overview

17
17
years of professional experience

Work History

Foreman

Pueblo Mechanical And Controls
04.2023 - 04.2025
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Reviewed project details to specify correct materials and equipment for job sites.

Licensed Plumber

Brothers Plumbing
02.2023 - 04.2023
  • Prepared clients for work, creating estimates based on parts costs and labor requirements
  • Filled pipes and plumbing fixtures with water or air and observed pressure gauges to detect and locate leaks
  • Inspected completed work to verify compliance with engineering specifications and local building codes
  • Installed septic tanks and drain fields to eliminate waste with natural filtering process
  • Maintained current knowledge of state regulations impacting plumbing work
  • Handled residential, commercial and institutional plumbing needs for appointment-based and emergency calls
  • Met safety standards, completing plumbing work in compliance with city, state and federal plumbing codes
  • Hanged steel supports from ceiling joists to hold pipes in place
  • Utilized carpentry skills to keep installations neat and thoroughly cleaned work sites to leave customers with attractive spaces
  • Repaired dishwashers and kitchen equipment incorporating gas or water consumption
  • Dug and back-filled trenches as part of new system installations and repairs at customer locations
  • Operated various hand and power tools to install pipe assemblies, fittings and valves
  • Located and marked position of pipe installations, connections and passage holes using measuring instruments
  • Kept detailed records of work progress and customer interactions
  • Directed helpers engaged in pipe cutting, pre-assembly or installation of plumbing systems or components
  • Fixed showers, toilets and related plumbing fixtures
  • Studied building plans and work drawings to determine sequence of installations

Pipe Layer

Western Underground
06.2019 - 02.2023
  • Moved heavy sections of pipe and loads of fill material using backhoes and front-end loaders
  • Completed skilled installations of lasers, grade rods and transit levels
  • Repaired, replaced and installed sanitary and stormwater sewer structures and piping
  • Covered completed pipes with gravel, earth, or concrete based on specific job requirements
  • Achieved proper fit by correctly aligning and positioning pipes for welding and sealing
  • Added auxiliary lines and devices by tapping and drilling holes into pipes
  • Prepared for new piping installations by cutting pipes to needed lengths
  • Avoided damaging existing pipes, power lines and other underground utilities by carefully checking locations
  • Laid out pipe routes to match written instructions and blueprints
  • Connected piping pieces and components, sealed joints and verified seals
  • Collaborated positively with peers and other staff members to maintain friendly, supportive and cooperative work atmosphere
  • Helped office personnel with errands, paperwork and data entry

Project Manager

Pump Pros
02.2017 - 06.2019
  • Liaised with team to define project scope, timelines, resources and requirements
  • Coordinated project teams, outsourcing work where required
  • Interacted with clients throughout projects to present updates, incorporate feedback and redirect concerns
  • Prepared overall project plan and controlled delivery of individual elements
  • Led project planning and development, quality control and final review to control milestones and deliverables
  • Led strategic decision-making in situations with limited information and tight time constraints
  • Produced and submitted comprehensive project schedules and updates to management
  • Tracked execution of key milestones, communicating potential issues and roadblocks
  • Identified areas for improvement by analyzing processes and evaluating modifications
  • Reviewed and approved or denied outside contractor agreements, expenses and invoicing
  • Measured performance with appropriate project management tools and techniques
  • Built clear and transparent communication channels to align internal stakeholders
  • Kept team members on track with regular in-person or remote meetings
  • Located, evaluated and contracted vendors to meet supply needs

Plumbing Foreman

Universal Plumbing
01.2008 - 02.2017
  • Led workers to follow supervisor instructions and meet deadlines
  • Inspected work in progress to conform to specifications
  • Liaised with other trades and sub-contractors to direct oversight and coordination
  • Expedited tools, equipment and materials to keep workers in work area
  • Reviewed blueprints with management to understand scope, budget and required timelines
  • Managed job site and crew to perform tasks and follow OSHA-compliant regulations
  • Oversaw placement and storage of materials, tools and supplies to support construction plan
  • Leveraged blueprints and specifications to prepare materials, layout systems and make sketches
  • Assembled, installed and repaired plumbing to meet project specifications and trade and building codes
  • Conducted safety observations to eliminate construction and job site hazards
  • Determined solutions to problems after evaluating client requirements
  • Attained productivity quotas, planning and prioritizing activities
  • Onboarded and trained workers on equipment operation and tool use
  • Moved items and manipulated objects using equipment and hand tools
  • Helped workers complete tasks with hands-on assistance at job locations
  • Generated reports from gathered information, worker feedback and surveys
  • Managed site safety through improved training and inspection strategies
  • Read specifications and blueprints for construction activity planning
  • Assigned workers tasks and schedules for specific jobs based on individual strengths
  • Identified, measured and marked site locations using measuring and marking equipment
  • Maintained code compliance with strict conformance to quality standards
  • Checked and verified tool and machinery functionality before shift end
  • Analyzed problems and recommended solutions, boosting productivity and output
  • Cultivated teamwork, resolving worker conflicts and disputes
  • Updated records with personnel and production data

Skills

  • Journeyman plumber
  • Azroc cr 37 exam contractor exam passed
  • Osha 40 certified
  • Trench safety certified
  • Fall protection certified

Timeline

Foreman

Pueblo Mechanical And Controls
04.2023 - 04.2025

Licensed Plumber

Brothers Plumbing
02.2023 - 04.2023

Pipe Layer

Western Underground
06.2019 - 02.2023

Project Manager

Pump Pros
02.2017 - 06.2019

Plumbing Foreman

Universal Plumbing
01.2008 - 02.2017
JOHN WADDELL