Overseen construction of process tubing. And hydraulic tubing on Furnace and 300 ton press
Supervised crews in construction of lube oil panels for paper machine. And hydraulic tubing for new Reel The job was a sucess and finished ahead of schedule.
Supervised crews in running process tubing for new repulper and Screens. We field routed small bore inst air lines to control valves. And ran new stainless hotwater piping. We finished early with no injuries.
Directed field crews in process tubing for new repulper. Instrument air piping for control valves. We ran new rack tubing for lube oil on paper machine rebuild. The job was finished on time with not incidents.
Supervised field crew's in flushing process piping. We flushed all lube oil piping. And steam blows for paper machine.
Supervised field crews in training gypsum belts. Trained ash hopper pipe conveyors. We flushed and pressure tested all process piping for gypsum reclaiming.