Seasoned SR Inspector focused on quality work with the ability to help other while being open to input driving forward-thinking leadership. 20+year track record of demonstrated results.
SR(25) US27 Kokomo Road to SR540
This project consist of some storm install,Lighting LED head replacement, Sidewalk repair and Guard rail replacement. Milling and resurfacing along with shoulder widening. Job duties include but not limited to verification of compliance per technical drawings. Monitored the performance of process controls systems in accordance with government regulations. Trained personnel in proper methods for inspecting upcoming work as needed. Inspected, tested and measured materials for conformance to specifications and regulatory requirements. Prepared reports outlining findings from inspections and tests performed. Developed, implemented, and maintained inspection plans, protocols, and documentation. Filled out and submitted logs and paperwork on-time. Inspected for accuracy in quantity, specification conformity. Completed day-to-day duties accurately and efficiently. Maintained updated knowledge through continuing education and advanced training. Maintained open communication with team members, resulting in successful project outcomes.
542 Dundee Rd. to Buckeye
Worked on this Award winning phase 1 and phase 2. On Project Phase 1, This project consisted of Complete (Utility/ Electrical , Fiber etc.) and Storm reconstruction. Road widening while maintaining Safety for the public and little impact to the public. Worked on all phases of project.
Supervisor: Ashley Vickers
Dundee Rd. Buckeye to Laurel rd. Dundee
This Project consist of Widening from two lanes to four lanes. Complete utility reconstruction, Signals,Ponds, Asphalt,Storm, JPA Sanitary, Fiber, and Power. Two Box culverts wil maintaining restrictions on EPA.
Supervisor: Ashley Vickers
ST.Pete Pier & Approach
This Project Was under FDOT and City Specifications.Project consumed 40+ Acre's.
Project consisted of complete demo of the old pier over the water and reconstructed. This Project consisted of New storm,Sanitary drainage installed and or repaired. removing Sea Walls. New Utilities ,Lighting ,Gas,Fiber was installed. Ponds for Drainage. Piles driven for the Pier. Mass concrete pours on all levels of Pier. Work outside the park for the City entrance and water front. Maintain safety for Public.
Contact was Mike Ryle COSP 727893-7400
Lead Sr. Inspector Roles
SR 600 to Cummings : Contact Jay Wolf (FDOT D1)- 863.272.5070
CR54 Sierra Segment Wesley Chapel Pasco County : Kevin Sumner -727.834.3604
Polk County Scour Counter Measure at Various Locations : Jay Wolf 863.272.5070
I-4 (SR400) MP13.8001.218
District wide contracts:
SR100 Shared use Path Contact : Webert Lovincin- 386.832.7153
Sr. Inspector/ Inspector role
I-4 SR 559 Contact : Lavenia Toole -863.519.4310
Bryan dairy Road Reconstruction ST Pete: Don Miller -813.927.0714
East -West Road (33 to Pace Road) George McClintock: 863.519.4326
Lakeland in-town By-Pass Phase 1/2 George McClintock :863.519.4326
Certification include as follows:
Earthworks Level 1 and 2
Asphalt Level 1 and 2
FDOT Concrete
ACI Concrete level 1 and 2
MOT - Advanced
IMSA -Traffic Signal Inspector
Drilled Shaft
Nuke Gauge
Final Estimates 1 and 2
Fema Cert 1,2,3