12 years of high-performing professional with substantial experience developing and implementing safety and health programs. Creates safety protocols, conducts hazard assessments and provides education. Strong knowledge of OSHA regulations and committed to promoting industrial hygiene and environmental health.
12 years as QEHS Manager in the implementation of renewable energy projects in the states of Rio Grande do Norte, Ceará, Paraíba, Pernambuco, Piauí and Bahia. Helping with the implementation of 3.84 GW of renewable energy projects.
12 years of experience in management and certification in international standards ISO 9001 (Quality), ISO 14001 (Environment), OHSAS 18001/ISO 45001 (Occupational Health and Safety) and in the Brazilian standard PBQP-H Level “A” (Quality in Civil Construction);
02 years in OHS management in the Operation and Maintenance of wind and photovoltaic plants. In addition to supporting the OHS management of hydroelectric generation plants.
Responsible for Occupational Health and Safety (SSO) management in the Operation and Maintenance (O&M) of NEOENERGIA's wind, solar and hydroelectric assets. Therefore, as responsible for the management of the SSO team of these assets. Also responsible for OH&S management of projects being implemented.
Responsible for QHSE management (Quality, Environmental, Occupational Health and Occupational Safety), within NEOENERGIA, coordinating the internal processes in the area of implementation of new renewable projects (wind and solar) as well as related network structures (transmission lines and substations).
MANAGED ASSETS:
Chafariz Wind Complex (471.2 MW) | Paraíba - Brazil
Oitis Wind Complex (566.5 MW) | Piauí / Bahia - Brazil
Luzia 2 and 3 Photovoltaic Plants (156.3 MW) | Paraíba - Brazil
Calangos Wind Complex (234 MW) | Rio Grande do Norte - Brazil
Rio do Fogo Wind Complex - Arizona (77.3 MW) | Rio Grande do Norte - Brazil
Caetites Wind Complex (90 MW) | Bahia Brazil
Mel II Wind Complex (20 MW) | Rio Grande do Norte - Brazil
Itapebi Hydroelectric Plant (462 MW) | Bahia Brazil
Corumbá III Hydroelectric Power Plant (96.45 MW) | Goiás - Brazil
Dardanelos Hydroelectric Plant (261 MW) | Mato Grosso - Brazil
Baixo Iguaçu Hydroelectric Plant (350 MW) | Parana Brazil
• Manage the company's Integrated Management System, integrating the Quality, Environmental and Occupational Health and Safety Management Systems;
• Implementation and certification of the Integrated Management System (ISO 9001, PBQP-H Level “A”, ISO 14001 and OHSAS 18001/ISO 45001);
• Control and management of applicable legislation;
• Development of standards, instructions and procedures;
• Preparation and assembly of the dossier of supporting documents and evidence of quality control, environmental management and occupational health and safety;
• Schedule, carry out and monitor Audits of Management Systems and works;
• Carry out various environmental licensing processes;
• Preparation of Environmental Plans, Programs and Reports for clients and environmental agencies;
• Monitoring of legal documentation;
• Preparation and management of Work Safety Programs and Plans;
• Management representative for matters relating to Workplace Safety, Environment and Quality.
• Monitoring of objectives, targets and indicators;
• Monitoring of technological controls;
• Monitoring environmental conditions;
• QSMS Team Management (Coordinators, engineers, doctors, analysts, technicians);
• Customer service;
• Preparation of proposals for the scope of Occupational safety, environment and quality;
• Guidance, qualification and training;
• Management of the company's Mineral Resources Sector. Carrying out prospecting, licensing and usage management processes;
• Internal Coordinator of the Business Management Program.
Participating in the Projects: Cumaru Wind Complex – 169.8 MW (ENEL); Chafariz Sul Wind Complex – 311.85 MW (NEOENERGIA); Folha Larga Sul Wind Complex – 151.2 MW (Casa dos Ventos); Ventos de Serra do Mel Wind Complex – 290.6 MW (Voltalia); Serra do Mel Wind Complex – 252 MW (ECHOENERGIA); Fortim Wind Complex – 123 MW (FURNAS); Serra da Babilônia / Itarema Wind Complex – 397 MW (Rio Energy); Serra das Vacas Wind Complex – 50.6 MW (PEC Engenharia); Cutia, São Bento and São Miguel Wind Complexes – 312.9 MW (COPEL); Pedra Cheirosa / Campo dos Ventos / North Block / South Block / Macacos Wind Complexes – 387.5 MW (CPFL); Santo Cristo, São João, Carnaúba and Reduto Wind Farms – 108 MW (Voltalia); Calangos 2, 4 and 5 Wind Farms / Mel II – 110 MW (Iberdrola); Casa Nova Wind Farm – 180 MW (CHESF); Miassaba III Wind Power Plant – 68 MW (Brasventos).
• Implementation and management of the Occupational Health and Safety Management System in the construction works of Wind Complexes.
• Coordination of Safety teams.
• Control and management of applicable legislation.
• Guidance, qualification and training.
• Management of Programs and Plans.
• Monitoring of legal documentation.
• Monitoring of objectives, targets and indicators.
• Control and management of documents and records.
• Company representative with customers.
Participating in the Projects: Ceará II Wind Complex – 211.2 MW (IMPSA); Dunas de Paracuru Wind Farm – 42 MW (Ventos Brasil); Icaraí I and II Wind Farms – 65.1 MW (Queiroz Galvão Energia); Rei dos Ventos I and III Wind Farms – 58.45 MW (BRASVENTOS); Trairi Wind Complex – 115.4 MW (Engie).
• Coordination of Safety teams.
• Control and management of applicable legislation.
• Guidance, qualification and training.
• Management of Programs and Plans.
• Monitoring of legal documentation.
• Company representative with the customer.
• Environmental management of the work.
• Implementation and management of the VPO Ambev System in the construction company.
Participating in the Project: AmBev Itapissuma Factory (AmBev).