Summary
Overview
Work History
Education
Skills
Timeline
Generic

JOHN W SALIGAN

Portland,OR

Summary

Meticulous Assembler proficient in blueprint reading and interpretation. Team player dedicated to meeting tight production deadlines. Dependable self-starter experienced in manufacturing production, assembly, quality assurance and machine operation.

Overview

8
8
years of professional experience

Work History

System Integration Technician

ESS INC.
01.2023 - 08.2023
  • Planned pipe system layout, installation and repair according to specifications.
  • Completed durable assemblies and subassemblies with hand and power tools
  • Followed detailed assembly instructions, processes and procedures
  • Measured, threaded, and cut materials to correct angles.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.

Assembly Technician

ARNPRIOR AEROSPACE
10.2018 - 12.2022
  • Executed entire assembly process by accurately interpreting set-up sheets, work orders, drawings or blueprints
  • Inspected all work for quality and compliance with design standards
  • Assembled and aligned parts and fixtures using hand and power tools.

Assembly Technician

CELESTICA
03.2021 - 09.2021
  • Kept work areas organized, tidy and clean for maximum productivity
  • Assembled production parts with high degree of accuracy and precision using hand and power tools.
  • Assembled communication equipment such as wiring, switching equipment and power apparatus.
  • Executed regular tests and inspection procedures to assemble products according to specifications.

Machine Operator

GENERAL GLASS CO
06.2015 - 09.2018
  • Repaired faults, reassembled products and completed additional tests
  • Checked color, shape, texture and grade of products and materials against established templates, charts and samples
  • Completed manual and visual inspections of glass pieces and final products.
  • Operated multiple machines simultaneously to meet production requirements.

Education

Reynolds High School
Troutdale, OR
06.2012

Skills

  • Hazardous Chemical Handling
  • Blueprint Reading
  • Machinery Operation
  • Hand and Power Tool Operation
  • Pipe Measuring, Cutting and Installing
  • Assembly and Production

Timeline

System Integration Technician

ESS INC.
01.2023 - 08.2023

Assembly Technician

CELESTICA
03.2021 - 09.2021

Assembly Technician

ARNPRIOR AEROSPACE
10.2018 - 12.2022

Machine Operator

GENERAL GLASS CO
06.2015 - 09.2018

Reynolds High School
JOHN W SALIGAN