Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic
Jomaryon Simpson

Jomaryon Simpson

Mesa,USA

Summary

Fiber Optic Cable Installer with expertise in fiber placement machinery and telecommunications construction. Proficient in troubleshooting and coordinating equipment in high-density areas. Recognized for fostering team motivation and maintaining equipment standards. Strong communication and leadership skills enhance operational efficiency in telecommunications projects.

Overview

7
7
years of professional experience
1
1
Certification

Work History

Data Center Technician

Anistar Technologies
06.2025 - Current
  • Managed installation and configuration of servers and network equipment to ensure optimal performance.
  • Conducted routine maintenance on data center infrastructure, enhancing reliability and uptime.
  • Implemented troubleshooting procedures for hardware and software issues, minimizing downtime.
  • Optimized data center operations by developing efficient workflows and best practices for team members.
  • Coordinated with cross-functional teams to support project deployments within the data center environment.
  • Dressed and labeled cables for easy identification and traceability.
  • Conducted inventory control and reported stock or receiving discrepancies identified when comparing inventory records with physical items or received products and packing slip.
  • Maintained accurate inventory records for all data center equipment, facilitating efficient resource allocation and procurement decisions.
  • Installed and maintained fiber optic cables, ensuring optimal signal quality and system performance.
  • Read blueprints and schematics to correctly place equipment.

Fiber Placement Foreman

Tilson Technology Management
09.2023 - 06.2025
  • Demonstrated leadership by modeling positive attitudes and behaviors
  • Motivated teams to cultivate a productive and positive work environment.
  • Utilized operational knowledge of various fiber placement machines, including Condux Fiber Jetter's and Hydraulic Assist wheels.
  • Applied expertise in telecommunications construction, focusing on micro-trenching hand hole placement, and cable placement tools.
  • Identified and troubleshot issues effectively using advanced equipment skills and knowledge.
  • Streamlined communication between crews and management, enhancing collaboration and project understanding.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.

Painter

Penington Painting Company
11.2022 - 08.2023


  • Prepared surfaces for painting by filling cracks and holes, sanding, priming or removing old paint as necessary.
  • Produced high quality painting work using a variety of tools, including brushes, rollers, and grinders.
  • Collaborated effectively with other tradesmen in order to complete projects within tight deadlines
  • Prepared surfaces and surrounding areas for painting using sandpaper, tape, and other materials.
  • Safely operated lifts, scaffolding, and ladders to complete large-scale jobs efficiently.
  • Managed inventory of supplies and ensured proper maintenance of painting equipment for optimal performance on each job site.

Shear Operator

Commercial Metals Company
08.2021 - 11.2022


  • Ensure equipment inspection reports are filled out each shift. Daily housekeeping of the area you’re working in and equipment you’re monitoring
  • Operated shear machinery to cut metal products to specified lengths and dimensions.
  • Monitored production processes to ensure adherence to quality standards and specifications.
  • Conducted routine maintenance on equipment to minimize downtime and enhance performance.
  • Contributed to a positive workplace culture through open communication, mutual respect, and active engagement in team meetings or discussions.
  • Reduced material waste by carefully measuring and marking materials for precise cuts according to job specifications.
  • Supported cross-functional teams when needed, lending expertise as a Shear Operator while also learning from others'' specialized knowledge.

Fiber Placement Laborer/Lead

Corridor Network Construction
05.2018 - 05.2021


  • Installed and tested fiber optic cable
  • Operated heavy machinery to support various construction projects and ensure efficient workflow.
  • Conducted routine inspections of tools and equipment, ensuring proper maintenance and functionality.
  • Trained new workers on operational procedures, fostering a culture of teamwork and cooperation.
  • Streamlined processes by suggesting improvements based on hands-on experience on job site operations.
  • Demonstrated flexibility with shifting responsibilities based on project needs, contributing to overall productivity levels.
  • Delivered consistent results under challenging weather conditions or other external factors affecting productivity.
  • Bolstered team morale with a positive attitude and willingness to help others when needed.
  • Used variety of hand and power tools to complete tasks.
  • Dug trenches, backfilled holes and compacted earth to prepare for new construction.
  • Operated forklifts and boom lifts to complete various tasks.

Education

High School Diploma -

Prairie High School
Cedar Rapids, IA

Skills

  • Microsoft Office Suite
  • Power tools and hand tools
  • Communication skills
  • Critical thinking
  • Quality control
  • Safety protocols
  • Structured cabling
  • Emergency management
  • OSHA compliance
  • Quick learner
  • Leadership abilities
  • Customer service excellence
  • Time management
  • Schematic reading
  • Telecommunications regulations
  • Attention to detail
  • Troubleshooting expertise
  • Equipment repair
  • Team collaboration

Certification

  • Driver's License, Present
  • Aerial Lift Certification, 2022-12-01
  • OSHA 10, 2023-09-01

Timeline

Data Center Technician

Anistar Technologies
06.2025 - Current

Fiber Placement Foreman

Tilson Technology Management
09.2023 - 06.2025

Painter

Penington Painting Company
11.2022 - 08.2023

Shear Operator

Commercial Metals Company
08.2021 - 11.2022

Fiber Placement Laborer/Lead

Corridor Network Construction
05.2018 - 05.2021

High School Diploma -

Prairie High School