Summary
Overview
Work History
Skills
Certification
Timeline
Generic

Jonas Li

San Bruno,CA

Summary

Responsible Stationary Engineer with excellent troubleshooting skills coupled with more than 10+ years of experience. Highly effective meeting safety requirements and work operational safety compliance. Known for efficiency and above-standard work ethic. Years of experience with cGMP environment(Labs), AHU, VFD, Motors, Boiler, Fume Hood Exhaust, Heating, Electrical, Fire and Safety Systems, UPS, BAS System, and Electrical.

Overview

14
14
years of professional experience
1
1
Certification

Work History

Stationary Engineer

CWS
04.2023 - Current
  • Worked with large HVAC systems such as boilers, and chillers.
  • Core & Shell Operation to ensure client satisfaction.
  • Improved system efficiency by conducting regular maintenance and repairs on stationary equipment.
  • Reduced downtime with proactive troubleshooting and identification of potential issues in stationary systems.
  • Enhanced safety compliance by implementing and adhering to industry-standard protocols and regulations.
  • Optimized energy consumption through monitoring, and adjustment of HVAC systems.
  • Inspected systems, equipment and components to determine maintenance needs.
  • Conducted preventive, corrective and predictive maintenance actions.
  • Identified problems and recommended new processes to improve performance and reduce costs.
  • Maintained compliance with health, safety and environment practices.
  • Efficiently operated all equipment and machinery according to manufacturer instructions.
  • Reported to Chief Engineer on building status, problems and solutions.
  • Oversaw start-up, operations and shutdown procedures.
  • Work and communicate with clients, and supervise multiple contractors
  • Oversaw offsite Facility and Manages day to day operation

Stationary Engineer

Veolia / Dolby Laboratories
03.2022 - Current
  • Oversaw offsite Facility and Manages day to day operation.
  • Scheduled contractors for bids, present to Super Chief and Building Managers for best solutions of projects.
  • Worked with City Inspectors, Fire Marshal, and contractors alike.
  • Inspected systems, equipment and components to determine maintenance needs.
  • Conducted preventive, corrective and predictive maintenance actions.
  • Identified problems and recommended new processes to improve performance and reduce costs.
  • Worked with large HVAC systems such as boilers, chillers and furnaces.
  • Maintained compliance with health, safety and environment practices.
  • Efficiently operated all equipment and machinery according to manufacturer instructions.
  • Reported to Chief Engineer on building status, problems and solutions.
  • Oversaw start-up, operations and shutdown procedures.
  • Work and communicate with clients, and supervise multiple contractors

Stationary Engineer

Genentech
03.2016 - 03.2022
  • Support over 9 buildings including cGMP Laboratory buildings.
  • Responsible for AHU (Lab and Offices), VFD, Motors, Boiler, Fume Hood Exhaust, Heating, Electrical, Fire and Safety Systems, UPS, BAS System.
  • Troubleshoot and replaced defective equipment, monitoring gauges, updating maintenance records, solving technical issues,
  • Work and communicate with clients, and supervise multiple contractors
  • Oversees project of New AHU, boilers, installation and start up
  • Supported Major project with UPS, ATS, Generator, replacement project.
  • Identified problems and recommended new processes to improve performance and reduce costs.
  • Inspected systems, equipment and components to determine maintenance needs.
  • Efficiently operated all equipment and machinery according to manufacturer instructions.
  • Conducted preventive, corrective and predictive maintenance actions.
  • Isolated and prepared equipment for corrective and scheduled maintenance procedures.
  • Kept facility inspection-ready at all times through proactive housekeeping and close monitoring of daily operations.
  • Entered quality test results, scanned paperwork into SAP and monitored SAP for completion of inspections.
  • Supported laboratory staff with advanced troubleshooting, resolving complex problems and helping with special projects.

Building Engineer

ABM
01.2013 - 03.2016

Regional Agency Headquarter (MTC.)

  • Responsible for Automatic Transfer Switch (LS,LR,OPT,UPS&ELEV), Fire Pump, UPS, FCC, Heating Boilers, Chillers, Cooling Towers, Data Center, AHUs, Package Units and Generator monitoring. Develop building daily round sheet, and preventive maintenance program for all equipment.
  • Continuous participation of commissioning process.
  • Surveyed and tracked mechanical, plumbing and electrical equipment to enhance service quality and comply with preventive maintenance plans.
  • Maintained computerized or manual equipment logs to detail preventive work.

South San Francisco International Airport

  • Responsible for multiple production coolers, freezers, autoclave sterilization system, high pressure steam boilers, outbound coolers, package units, ice makers, ovens, fryers, griddles, ranges, char-broiler, warmers, high volume flight-type dish machines, and HVAC.
  • Duties include equipment troubleshooting, entrust by chief to work as only technician during weekends at 24/7 airport facility.
  • Communicate with supervisor, manger, human resources, GM, Fire Department, and Contractors to provide quality service and coordination with them under major events.
  • Responded quickly to emergencies and summoned additional assistance to mitigate potentially hazardous situations

Mobil Service Technician

Adam&Qobti Refrigeration
01.2012 - 02.2013
  • Evaluated systems according to predetermined checklist and noted issues.
  • Efficiently troubleshot and repaired walk-in cooler, ice-maker, refrigerator, char-broiler, oven, fryer and HVAC equipment to cut company costs and maximize productivity.
  • Explained diagnostic findings to customers and outlined repair or service options.
  • Inspected equipment to diagnose operational issues.
  • Diagnosed and troubleshot problems, repairing and restoring machines to peak performance.
  • Trained customer employees and managers on machine use and maintenance.

Service Technician

Pro-tech 
03.2010 - 01.2012
  • Serviced refrigerator, walk-in cooler, ice maker, ovens, mixers, lighting fixtures, water heaters, water boosters, warmer & heaters, griddles, broilers, pumps, exhaust kitchen hoods, and fryers. equipment for expedient repair and minimal downtime.
  • Evaluated systems according to predetermined checklist and noted issues.
  • Trained customer employees and managers on machine use and maintenance.
  • Reviewed technical documentation to complete equipment maintenance and repair.
  • Applied knowledge of standard equipment and manufacturer repair guidelines.
  • Demonstrated increased knowledge of company products and equipment.

Skills

  • GMP Standards Compliance
  • CGMP Environment
  • Planning and Coordination
  • Certified and licensed engineer
  • BAS
  • Preventive Maintenance
  • HVAC systems
  • Troubleshooting skills
  • Brazing and soldering
  • Performing repairs
  • Installing new components
  • Inspecting equipment
  • Commissioning processes
  • Analytical and Critical Thinking
  • Maintenance and Repair
  • Interpersonal Communication
  • Diagnostic abilities

Certification

  • EPA Universal Certified Technician (ID 10127)
  • Degrees in HVAC (ACCSC)

Timeline

Stationary Engineer

CWS
04.2023 - Current

Stationary Engineer

Veolia / Dolby Laboratories
03.2022 - Current

Stationary Engineer

Genentech
03.2016 - 03.2022

Building Engineer

ABM
01.2013 - 03.2016

Mobil Service Technician

Adam&Qobti Refrigeration
01.2012 - 02.2013

Service Technician

Pro-tech 
03.2010 - 01.2012
Jonas Li