i run the dozer making sure the dragline had flat pad to walk on ripped wall did clean up and clean coal and also steppedup as oiler operator when one was gone i run the dragline and moved cable and clean in the back
I left for what i thought where better opportunities
i was temp so i was only able to ground around dragline
I left for a full time job with ntec
i run the dozer around the dragline also oiled and run the dragline i also was on special projects when the dragline is down
I was layedoff
i run the dozer on the ios pile feeding the mill
i left there to move back to Wyoming
i work conveyor belts
company went bankrupt
can run dragline i have run from a 1570 to 2570 BE and a 8200 marion, i can also oil and ground , i also can run dozers from d9 to d11 , i can also run blade form 16 to 24h , loaders from 950 to 994 , track hoe from 390 to hitachi 3600