Bilingual Boilermaker, team-oriented individual and highly skilled. Hardworking and passionate job seeker. Ready to help achieve company goals.
Overview
6
6
years of professional experience
Work History
Boilermaker
Performance Contractors
02.2024 - Current
Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
Maintained compliance with all safety procedures from both client and employer.
Tightened or replaced bolts and gaskets to repair leaks.
Used hand signals to notify crane operator to lift components to specific positions.
Promoted a culture of continuous improvement within the team, consistently seeking ways to enhance processes and performance standards.
Upheld company reputation for excellence by consistently delivering high-quality workmanship that met or exceeded client expectations.
Boilermaker
Universal Plant Services
01.2024 - 02.2024
Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
Maintained compliance with all safety procedures from both client and employer.
Tightened or replaced bolts and gaskets to repair leaks.
Inspected equipment and structures to determine scope of work (SOW).
Used hand signals to notify crane operator to lift components to specific positions.
Ensured compliance with industry regulations through diligent adherence to codes and guidelines in all tasks performed.
Boilermaker
Ultimate Industrial Group
09.2023 - 01.2024
Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.
Maintained compliance with all safety procedures from both client and employer.
Tightened or replaced bolts and gaskets to repair leaks.
Upheld company reputation for excellence by consistently delivering high-quality workmanship that met or exceeded client expectations.
Operated forklifts, bobcats and track hoes.
Insulator/Metalman
Bilfinger Westcon Industries
08.2023 - 09.2023
Assessed project scope, material requirements and blueprints to gain valid understanding of project details
Applied and handled insulating products such as foam, fiberglass and cloth with mud
Maintained equipment according to manufacturer specifications and safety protocols
Prepared surfaces for insulation with help of adhesives, cement and other compounds
Qualified to handle hazardous materials such as lead, arsenic and beryllium
Protected team members and building users from harm by adhering to strict asbestos remediation procedures when locating, removing and sealing off old insulation
Fabricated and assembled sheet metal products and equipment such as ducts, control boxes, drainpipes and furnace casings
Applied and prepared cement, epoxy and other durable adhesives as part of insulation installation
Constructed modular insulation materials for various uses and applications.
Solids Control Technician
Portable Mud Systems
04.2023 - 07.2023
Lifted, installed and removed equipment in extreme weather conditions and temperatures
Monitored controls and interpreted instrument readings to locate faults or obstacles
Operated pumps to circulate water, oil or other fluids through wells to remove sand or materials obstructing free flow of oil
Provided timely operating reports on service rig and project progression.
Oilfield Floorhand
H&P Drilling
01.2023 - 04.2023
Monitored shaker and mud tank operations
Moved or relocated materials and equipment required for drilling tool assembly to and throughout work site
Provided assistance in assembly and disassembly of drilling rig and equipment
Executed daily operations quickly and accurately, achieving productivity targets
Adhered to operational safety and regulatory requirements by maintaining clean and hazard-free work space
Led preventive maintenance activity on drilling rigs and equipment to limit downtime
Prepared drilling sites with correct equipment and materials for productive operations
Selected appropriate pumps, valves and associated equipment for productive drilling operations
Performed minor repairs on drilling equipment and tools to limit operational disruptions
Maintained clean, organized, hazard-free work areas for optimized site safety
Operated down-hole tools safely and responsibly, limiting risk
Verified job safety analysis (JSA) and correctness of obtained permits prior to starting new jobs
Carried out general manual labor activities to aid site productivity
Set up and broke down production equipment based on job specifications
Moved materials and products to established locations using forklifts.
Oilfield Floorhand
Precision Drilling Company
05.2022 - 01.2023
Monitored shaker and mud tank operations
Moved or relocated materials and equipment required for drilling tool assembly to and throughout work site
Provided assistance in assembly and disassembly of drilling rig and equipment
Executed daily operations quickly and accurately, achieving productivity targets
Adhered to operational safety and regulatory requirements by maintaining clean and hazard-free work space
Led preventive maintenance activity on drilling rigs and equipment to limit downtime
Prepared drilling sites with correct equipment and materials for productive operations
Selected appropriate pumps, valves and associated equipment for productive drilling operations
Performed minor repairs on drilling equipment and tools to limit operational disruptions
Maintained clean, organized, hazard-free work areas for optimized site safety
Operated down-hole tools safely and responsibly, limiting risk
Verified job safety analysis (JSA) and correctness of obtained permits prior to starting new jobs
Carried out general manual labor activities to aid site productivity
Set up and broke down production equipment based on job specifications
Moved materials and products to established locations using forklifts.
Insulator/sheet metal
Brandsafway
01.2019 - 07.2020
Assessed project scope, material requirements and blueprints to gain valid understanding of project details
Applied and handled insulating products such as foam, fiberglass and cloth with mud
Maintained equipment according to manufacturer specifications and safety protocols
Prepared surfaces for insulation with help of adhesives, cement and other compounds
Qualified to handle hazardous materials such as lead, arsenic and beryllium
Protected team members and building users from harm by adhering to strict asbestos remediation procedures when locating, removing and sealing off old insulation
Fabricated and assembled sheet metal products and equipment such as ducts, control boxes, drainpipes and furnace casings
Applied and prepared cement, epoxy and other durable adhesives as part of insulation installation
Constructed modular insulation materials for various uses and applications.
Oilfield Floorhand
Precision Drilling Company
03.2018 - 04.2019
Monitored shaker and mud tank operations
Moved or relocated materials and equipment required for drilling tool assembly to and throughout work site
Provided assistance in assembly and disassembly of drilling rig and equipment
Executed daily operations quickly and accurately, achieving productivity targets
Adhered to operational safety and regulatory requirements by maintaining clean and hazard-free work space
Led preventive maintenance activity on drilling rigs and equipment to limit downtime
Prepared drilling sites with correct equipment and materials for productive operations
Selected appropriate pumps, valves and associated equipment for productive drilling operations
Performed minor repairs on drilling equipment and tools to limit operational disruptions
Maintained clean, organized, hazard-free work areas for optimized site safety
Operated down-hole tools safely and responsibly, limiting risk
Verified job safety analysis (JSA) and correctness of obtained permits prior to starting new jobs
Carried out general manual labor activities to aid site productivity
Set up and broke down production equipment based on job specifications
Moved materials and products to established locations using forklifts.
Boilermaker Mechanic
Universal Plant Services, Inc
03.2018 - 04.2019
Identified issues and addressed each immediately with job foreman
Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies
Cleaned and maintained boilers and associated equipment to increase efficiency and performance level
Used hand signals to notify crane operator to lift components to specific positions
Tightened or replaced bolts and gaskets to repair leaks
Assembled and analyzed boilers for defects
Used power hammers or weld pressure vessel tubes to achieve leakproof joints
Maintained compliance with all safety procedures from both client and employer
Operated forklifts, bobcats and track hoes
Removed boiler casings, grades, handrails, manhole, and hole covers to facilitate access to boilers or other vessels for repair
Dismantled equipment or devices to gain access and remove defective parts or components.