
-Installing rigid
-terminating high voltage
•Megging insulation test
•2.1 2.2 inspection
•clean walks
•torque and marks inspections on high voltage switchgear, transformers and panel boards,
•Read blue prints
•Pre-Functional Testing and level 2/3 inspection
•load bank testing and stress verification
•comprehensive grounding and bonding audits
•Documentation and issues log management