Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jonathan Miller

Chandler,TX

Summary

Adept at leveraging expertise in Leica geosystems and AutoCAD/Carlson Survey, significantly enhanced project accuracy and efficiency at Andress Surveying. Leadership in adopting advanced surveying technologies and collaborative skills ensured timely, high-quality deliverables, resulting in a notable increase in client satisfaction and repeat business.

Overview

17
17
years of professional experience

Work History

Sr. Survey Technician

Andress Surveying
03.2017 - Current
  • Solved challenging boundary disputes using expert knowledge of property laws combined with precise field measurements.
  • Optimized data management systems for efficient storage and retrieval of critical survey information.
  • Refined cost estimates by conducting thorough pre-survey boundary evaluations to identify potential obstacles or issues impacting budgets or timelines.
  • Collaborated with engineers and architects to deliver comprehensive site plans based on precise survey measurements.
  • Delivered detailed as-built drawings upon project completion, enabling clients to maintain accurate records for future reference or expansion plans.
  • Increased client satisfaction by providing timely and accurate survey results tailored to their specific needs.
  • Enhanced project accuracy by meticulously collecting and analyzing field data for topographic, boundary, and construction surveys.
  • Championed the adoption of advanced surveying equipment within the organization, resulting in improved data accuracy and efficiency.
  • Secured repeat business from satisfied clients due to consistent delivery of high-quality work within tight deadlines.
  • Ensured project compliance with local regulations through diligent research and adherence to zoning requirements.
  • Reduced errors in data collection with thorough quality control measures, ensuring the reliability of survey results.
  • Produced detailed maps showing locations of boundaries and topographical features.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Used Leica RTK GPS, Total Station and industry standard measuring equipment to complete field surveys.
  • Utilized established field surveying strategies to perform high-quality work.
  • Checked map layers to promote accuracy, identifying and marking errors and making corrections.
  • Investigated land details such as deed information, zoning regulations and subdivision rules.
  • Trimmed, aligned and joined prints to form photographic mosaics, maintaining scaled distances between reference points.
  • Minimized safety risks by ensuring strict adherence to company guidelines and industry best practices during fieldwork activities.

LRC Technical Assistant

TVCC Health Science Center
01.2016 - 03.2017
  • Set up and configured desktop computers, peripherals and accounts, assigning appropriate security levels.
  • Provided technical guidance and support to students and team members.
  • Installed technical hardware and software in deskside support environment.
  • Assisted in the planning and execution of IT projects, contributing technical expertise and resource management skills to ensure successful outcomes.
  • Gathered, organized and distributed technical documentation.
  • Prepared technical presentations and other materials for advisory meetings.
  • Reduced response time to technical inquiries, providing timely and effective solutions.
  • Assisted in research and testing of new technology, contributing to innovation and efficiency improvements.
  • Contributed to successful completion of IT projects, collaborating closely with IT team.
  • Improved data accuracy by meticulously updating and maintaining databases.
  • Served as point-person for support requests with clients and vendors.

Toolroom Machinist

Biotech Medical
04.2013 - 05.2015
  • Used CNC and manual equipment to perform both initial and final machining.
  • Utilized CAD and CAM software to design tool paths, select cutting tools and set machine parameters based on job requirements.
  • Read and interpreted blueprints to make parts according to specifications.
  • Studied sample parts, blueprints or engineering information to determine methods or sequences of operations needed to fabricate products.
  • Aligned and secured holding fixtures, cutting tools, attachments, accessories and materials onto machine.
  • Utilized micrometers and calipers to measure and verify precise tolerances.
  • Collaborated with engineering team to design and fabricate custom fixtures and jigs for specific machining applications.
  • Manually set up machinery, lathes, and grinders.
  • Adjusted machine settings to reduce waste and improve efficiency.
  • Studied daily work instruction, sketches, drawings, blueprints, and manuals to determine dimensions and tolerances accurately.
  • Lubricated parts and performed minor and preventive maintenance to improve machine function and increase lifespan.
  • Completed projects on time and under budget and maintained equipment and tools.
  • Reduced error and non-conformances with by utilizing fixtures and cutting tools on CNC machines.
  • Used various precision measuring instruments to check workpiece accuracy.
  • Selected appropriate tools and materials to be used in preparation of machinery work.
  • Collaborated with engineers and other machinists to develop optimal machining processes.
  • Established machining parameters and test runs for new parts and components.
  • Calibrated and aligned machine components for proper functioning.
  • Managed tool sharpening services internally or externally as needed to maintain optimal cutting performance of all tools used in the facility.
  • Supported quality control efforts by accurately measuring parts using precision measuring instruments such as micrometers, calipers, and gauges.
  • Researched and identified new machining technologies and techniques.

Civil Engineering/Land Survey Technician

Allied Professional Technology
06.2007 - 04.2012
  • Set up precise measurement and control equipment.
  • Performed field calculations to complete assessments.
  • Maximized efficiency in fieldwork by regularly calibrating equipment and adhering to strict maintenance schedules.
  • Collaborated closely with team members to achieve project goals and maintain strong professional relationships.
  • Performed detailed topographic surveys for engineering projects, ensuring accurate elevation data for design purposes.
  • Effectively communicated complex information with clients, team members, and other professionals in the field.
  • Contributed to successful project completion by adapting quickly to changing conditions or unexpected challenges.
  • Reduced errors in data collection through meticulous attention to detail and thorough fieldwork.
  • Conducted thorough research to identify potential property boundaries and resolve discrepancies in existing records.
  • Improved land survey accuracy by utilizing advanced measuring tools and techniques.
  • Produced detailed maps showing locations of boundaries and topographical features.
  • Performed boundary, topographic and traverse land surveys.
  • Compiled information necessary to stake projects for construction using engineering plans.
  • Utilized established field surveying strategies to perform high-quality work.
  • Used Topcon GPS (Base/Rover), Total Station and industry standard measuring equipment to complete field surveys.
  • Investigated land details such as deed information, zoning regulations and subdivision rules.
  • Checked map layers to promote accuracy, identifying and marking errors and making corrections.

Education

Associate of Science - Mechanical Engineering Technology

Trinity Valley Community College
Athens, TX

Associate of Arts - Computer Science

Trinity Valley Community College
Athens, TX

Skills

  • Leica geosystems
  • Construction staking
  • As-built surveys
  • AutoCAD/Carlson Survey
  • Topographic mapping
  • Drone surveying
  • Legal description interpretation
  • Total station operation
  • Plat creation
  • Field crew supervision
  • Topcon positioning systems
  • Land surveying

Timeline

Sr. Survey Technician

Andress Surveying
03.2017 - Current

LRC Technical Assistant

TVCC Health Science Center
01.2016 - 03.2017

Toolroom Machinist

Biotech Medical
04.2013 - 05.2015

Civil Engineering/Land Survey Technician

Allied Professional Technology
06.2007 - 04.2012

Associate of Science - Mechanical Engineering Technology

Trinity Valley Community College

Associate of Arts - Computer Science

Trinity Valley Community College
Jonathan Miller