Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jordan Strange

Porterdale,GA

Summary

A seasoned Foreman and Pipefitter, I excel in crew leadership and blueprint interpretation, demonstrated through my tenure at East Georgia Sprinkler. My proactive approach has significantly enhanced team efficiency and project quality, with a keen focus on workplace safety and OSHA compliance, ensuring a 30% improvement in project delivery timelines.

Overview

5
5
years of professional experience

Work History

Foreman

East Georgia Sprinkler
09.2024 - Current
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Championed company values through consistent modeling of ethical behavior and adherence to corporate policies.
  • Inspected equipment and tools used for safe operation.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Checked equipment to determine if maintenance was required.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Optimized resource utilization for cost savings, carefully monitoring material usage and labor allocations.
  • Provided comprehensive training for new employees, ensuring their rapid integration into the team dynamic.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.

Pipefitter

J&j Fire Protection
06.2021 - 09.2024
  • Threaded pipes using piping machines.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Fabricated pipe sections and components to specification using cutting and threading.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
  • Collaborated effectively with supervisors to ensure that all necessary permits were obtained before commencing work on new projects.
  • Reduced project completion time by interpreting blueprints, sketches, and specifications to accurately plan pipefitting installations.
  • Maximized system longevity through routine preventative maintenance checks on existing piping infrastructure within various industrial settings.

Pipefitter

Pro-Tec Fire
12.2019 - 06.2021
  • Threaded pipes using piping machines.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Promoted a safe work environment by adhering to company safety policies and procedures at all times during pipefitting operations.
  • Increased efficiency by collaborating with team members to install, assemble and repair piping systems in various construction projects.
  • Assisted in achieving project deadlines through effective organization of work assignments and prioritization of tasks based on urgency.
  • Supported team efficiency through clear communication regarding progress updates and potential issues during the course of projects.
  • Prevented project delays, skillfully navigating last-minute changes to designs or schedules with adaptability.
  • Reduced material waste by accurately measuring and planning pipe routes, contributing to cost savings.
  • Conducted comprehensive pressure tests to ensure integrity of piping systems, enhancing system reliability.
  • Ensured compliance with local building codes and standards, reducing risk of penalties and rework.
  • Filled pipe systems with water and air to determine location of leaks.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.

Education

Eastside Highschool
Covington, GA

Skills

  • Crew leadership
  • Attention to detail
  • Decision-making
  • Effective communication
  • Dedicated work ethic
  • Critical thinking
  • Teamwork and collaboration
  • Workplace safety
  • Heavy lifting
  • Worksite safety
  • Equipment operation
  • OSHA compliance
  • Quality control
  • Daily reporting
  • Work Planning and Prioritization
  • Equipment oversight
  • Employee training
  • Materials management
  • Project leadership
  • Blueprint interpretation

Timeline

Foreman

East Georgia Sprinkler
09.2024 - Current

Pipefitter

J&j Fire Protection
06.2021 - 09.2024

Pipefitter

Pro-Tec Fire
12.2019 - 06.2021

Eastside Highschool
Jordan Strange