Adept at driving project success, I leveraged my expertise in blueprint interpretation and crew leadership at Whiteley Group to surpass quality benchmarks. My proactive approach to OSHA compliance and environmental awareness ensured projects met stringent safety standards, fostering a culture of excellence and teamwork that consistently exceeded client expectations.
Operated excavator to dig a ditch for pipeline 24" pipe.
Operated sideboom to lower in pipe in ditch for tie in.
Work and operated equipment in a save manner.
Work in 30" Atmos gas line
Operated excavator to dig a ditch for tie ins.
Lift and lower pipe in ditch.
Sideboom to lower pipe for tie ins.
Dozer to grade and restore ground level.
Supervised crew of 4 operators and 6 labors.
Clear right of way for stringing pipe.
Set up pipe for pipe gang.
Dig a ditch to lower in pipe.
Coating pipe.
Tie in pipe.
And final clean after installation of pipe.