- Specializing in flooring and bathroom remodeling
- Setting up and operating Trane Tracer SC+ for
37 HVAC systems, lowering their energy usage by 14%
- Worked with team members to complete 8 major renovation projects, achieving a 98% on-time project delivery rate
- Performed routine maintenance checks on 64 HVAC systems, improving their lifespan by 3 months on average
- Measuring and cutting materials using tape measures, ensuring precise installation and reducing overall waste by 11%
- Leveraged the power drill to install 328 ceiling fans, ensuring the blades were balanced and well-supported, reducing post-installation wobbles by 93%
- Practiced the best and safest sawing techniques to achieve a smoother finish, decreasing sanding time by 2.6 hours
- Resolved 51 plumbing issues within a month using the wrench set, saving clients an average of $257 on potential water damage repairs