-Looking after a 12 man crew, installing conduit , cable tray, terminations and doing tool hook ups at a semi conductor.
-Install conduit
-terminate motors
-terminate instruments
-troubleshoot instruments.
I was over looking 15 guys installing conduit at a MCC, and running the conduit to motors and instruments.
installed conduit and mounted electrical equipment for example power boxes or heat trace panels.
duct bank work, pulled wire, terminated switch gears and super chargers for tesla vehicles.
Installed conduit, installed heat trace, terminated the power for the heat trace as well as the heat trace, installed cable tray.
duties were Meeting with tool owner to get description how they wanted work done especially.
-Tool hook up.
-Cable tray installation.
-Conduit installation.
Pulled cable, installed conduit, and installed lights and terminated lights.
-installed ground.
-installed conduit.
-pull cable.
Pull cable.
install ground.
OSHA 10
TWIC
NCCER
TDLR apprentice
OSHA 10
TWIC
NCCER
TDLR apprentice