
Dynamic Electrical Engineer with a proven track record at Rus Industrial, excelling in system performance monitoring and troubleshooting. Skilled in high voltage engineering and critical thinking, I enhance operational efficiency through effective project management and adherence to electrical safety standards. Committed to delivering quality results in complex electrical environments.
Assisted in maintaining operational efficiency of data center. Supported teams in troubleshooting technical issues. Contributed to daily monitoring of system performance.
Installed and secured 3/4 to 4" EMT conduit systems for electrical infrastructure.
Assisted in disconnecting chiller motors and communication cables. Supported removal of power cables ranging from 120V to 480V. Facilitated safe termination of electrical connections.
Oversaw installation of cable tray angles, ensuring optimal cable management.
Executed installation of flex components into MCCs and panels.
Executed loop checks between points to ensure system integrity prior to panel activation.
•Executed installation of temporary power systems for turbine generators.
•Executed installation of electrical stress cones to enhance system reliability.
•Executed installation of 16 pairs of 18 AWG wires to enhance communication systems.
Conducted loop checks on cables ranging from 120V to 480V to ensure operational integrity.
Executed termination procedures for transformers and devices to ensure safety and compliance.
Assisted in installation of cable trays and angle trays. Supported team in maintaining organized cable management systems.