Summary
Overview
Work History
Skills
Languages
Certification
References
Timeline
Generic

Jorge Vasquez

San Antonio

Summary

Capable Construction Laborer experienced in operating and maintaining equipment to support job site needs. Physically strong and fit with good time management abilities and dexterity to support skilled work.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Construction Laborer

Martinez Construction
San Antonio
03.2016 - Current
  • We did all types of work with home building, remodeling, & additions.
  • My role as a laborer was to help with all types of jobs
  • Assisted skilled trades in framing and installation projects.
  • Loaded and unloaded construction materials into designated areas.
  • Maintained clean and organized job sites for safety and efficiency.
  • Followed safety protocols to minimize hazards on-site.
  • Collaborated with team members to complete projects on schedule.
  • Carried tools and equipment between job sites as required.
  • Performed general clean-up activities onsite including sweeping and disposing of debris.
  • Loaded and unloaded building materials, tools, and machinery.
  • Set up ladders or temporary platforms used in construction projects.
  • Repaired damaged structures such as walls or floors when needed.
  • Assisted in the installation of doors, windows, drywall, roofing systems, and other structural components.
  • Used levels to ensure surfaces were even prior to completing tasks.
  • Installed insulation into walls before applying drywall panels.
  • Performed demanding physical work over extended periods and modeled positive attitude.
  • Gained independent working skills and guided and mentored less experienced team members.
  • Worked productively as lead or helping team member to drive customer satisfaction.
  • Measured, marked or recorded openings or distances to construction layout areas.
  • Operated a variety of hand and power tools to complete tasks such as sawing, drilling, hammering, and excavating.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Unloaded trucks with supplies for construction projects.
  • We did all types of work from framing, vinyl flooring, tile, painting, roofing, siding, deck building, sheetrock ect.

Pallet Repairer

Ryder
San Antonio
09.2025 - 01.2026
  • Inspected pallets for damage and ensured quality standards were met.
  • Repaired broken pallets using hand tools and power equipment.
  • Organized pallets in warehouse for efficient handling and storage.
  • Maintained a clean and safe work environment in compliance with safety regulations.
  • Executed daily tasks in a fast-paced environment while prioritizing safety and efficiency.
  • Repaired broken pallets using power tools such as saws, drills, and nail guns.
  • Nailed repaired sections together with hammer and nails or pneumatic nail gun.
  • Maintained clean and organized workplace to optimize performance, efficiency and safety.
  • Utilized various tools, equipment, materials and forming systems to complete construction tasks.

Iron

Bexar Concrete
San Antonio
02.2022 - 12.2022
  • Cut rebar to specified lengths using precision tools.
  • Assemble and secure steel reinforcement for concrete structures.
  • Follow safety protocols to maintain a secure work environment.
  • Secure rebar in place with tying wire or clamps for additional reinforcement.
  • Organize materials on job sites so that they can be easily accessed by personnel working in the area.
  • Assist in the installation of reinforcing steel bars into forms for concrete structures.
  • Follow standard operating procedures when setting up a job site prior to beginning any work activities.
  • Collaborated with construction foreman to establish and confirm task sequences and reinforcing requirements.
  • Worked easily with different types of iron installations to complete on-time, high-quality work.
  • Worked onsite outdoors in all weather conditions including extreme heat and cold.
  • Loaded and unloaded trucks with tools and supplies needed for job sites.
  • Maintained a clean workspace throughout the duration of the project.
  • Lifted and positioned heavy steel beams into place.
  • Performed preventive maintenance checks on all tools used during construction projects.
  • Removed and replaced existing grating and structural steel with appropriate materials.

Skills

  • Material handling
  • Tool operation
  • Safety protocols
  • Structural repair
  • Installation assistance
  • Time management
  • Team collaboration
  • Problem solving
  • Attention to detail
  • Team lifting
  • Rebar installation
  • Construction safety
  • Insulation application
  • Nail gun proficiency
  • Demolition procedures
  • Drywall installation
  • Tool management
  • Painting techniques
  • Window installation
  • Basic math
  • Tile setting
  • Basic carpentry
  • Roof installation
  • Waterproofing methods
  • Worksite organization
  • Power tool operation
  • Landscaping
  • Caulk application
  • Heavy lifting
  • Flooring installation
  • Framing techniques
  • Physical stamina
  • Materials loading
  • Customer interaction
  • Effective communication
  • Independent work
  • Demolition techniques
  • Door installation
  • Siding installation
  • Framing
  • Insulation work
  • Fixture installation
  • Wallpaper removal
  • Landscaping basics
  • Fence installation
  • Loading and unloading trucks
  • Communication
  • Multitasking
  • Task prioritization
  • Hand tool proficiency
  • Rebar cutting
  • Bar tying techniques
  • Hand tools operation
  • Job site preparation
  • OSHA compliance
  • Site cleanup
  • Repair techniques
  • Adaptable working style
  • Dependable work ethic
  • Positive attitude
  • Measurement tools
  • Loading and unloading
  • Workplace cleanliness
  • Efficiency improvement
  • Safety procedures
  • Painting and staining
  • Nailing skills
  • Material handling equipment
  • Wood cutting
  • Pallet assembly expertise
  • Measuring

Languages

English
Native/ Bilingual
Spanish
Professional

Certification

  • Osha 10

References

References available upon request.

Timeline

Pallet Repairer

Ryder
09.2025 - 01.2026

Iron

Bexar Concrete
02.2022 - 12.2022

Construction Laborer

Martinez Construction
03.2016 - Current
Jorge Vasquez