Summary
Overview
Work History
Education
Skills
Timeline
Jose Alzate

Jose Alzate

Kissimmee,FL

Summary

Careful Installer with 2 years of experience in Assembly of structures. Expert in installations and carpentry tool use with proven history of success with customer satisfaction rates. Known for working quickly with great integrity and reliability.

Overview

2
2
years of professional experience

Work History

Lead Installer

Cost of Wisconsin
09.2024 - 01.2025

Level IV Installer

Scenario
09.2023 - 09.2024

INSTALLER

The Companies Of Nassal
02.2023 - 09.2023
  • Cut materials to specified sizes for installation with power saws and cutters
  • Used standard hand and specialized tools to install equipment, performing tests for proper operation
  • Created detailed reports outlining progress made on various jobsites throughout the day
  • Epic universe - dark universe
  • Worked on projects installing steel, wood and concrete structures, lift operator, forklift
  • Unloaded trucks using forklifts or pallet jacks when necessary
  • Positioned, aligned, or leveled machines and equipment to prepare for rigging
  • Read blueprints and schematics to understand installation requirements
  • Epic universe - super nintendo world
  • Worked on projects installing steel, wood and concrete structures, lift operator, forklift
  • Epic universe - dark universe - The Wizarding World of Harry Potter

Driver, Warehouse Orders

Amazon Dsp XL
09.2022 - 03.2023
  • Performed daily vehicle inspections, identifying potential issues before they escalated into costly repairs.
  • Maintained safe driving records by strictly following traffic rules and regulations.
  • Loaded and unloaded trucks using pallet jacks or forklifts when required, ensuring proper handling of items.
  • Provided exceptional customer service at the point of delivery, addressing concerns and answering questions as needed.

Education

Associate Industrial Maintenance - Mechanical Maintenance

Sena Colomboaleman
01.2012

Skills

  • Hand and Machine Tools
  • Read blueprints
  • Hardware Installation
  • Team Collaboration
  • Carpentry tool use
  • Integrity
  • Reliability

Timeline

Lead Installer - Cost of Wisconsin
09.2024 - 01.2025
Level IV Installer - Scenario
09.2023 - 09.2024
INSTALLER - The Companies Of Nassal
02.2023 - 09.2023
Driver, Warehouse Orders - Amazon Dsp XL
09.2022 - 03.2023
Sena Colomboaleman - Associate Industrial Maintenance, Mechanical Maintenance
Jose Alzate