Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

Jose Chavarria

Bell Gardens,CA

Summary

fast Lerner as well

Hardworking professional well-versed in handling materials, operating machinery and supporting overall team and project needs. In-depth knowledge of compliance mandates governing site and worker safety. Focused on helping complete skilled work under deadlines.

Overview

1
1
Language
3
3
years of professional experience

Work History

Construction Worker

Regency
Riverside, California
02.2016 - 11.2018

Some knowledge in plumbing .

Outlets.Run electrical wire .

Put dry wall .mudding.

Painting , carpentry , demolition to full remodeling . Staco , h/vac ducts assemble them . Framing .labor worker

  • Operated hand tools and power tools for daily construction work.
  • Assisted Regency crews with framing, demolition, and site preparation tasks.
  • Loaded, moved, and organized materials across Regency work sites.
  • Mixed concrete, mortar, and other supplies for building tasks.
  • Followed safety rules and wore required protective equipment on site.
  • Cleaned work areas and removed debris from Regency construction zones.
  • Supported carpenters, masons, and supervisors with routine labor tasks.
  • Checked tools, equipment, and materials before starting each shift.
  • Utilized power tools such as saws, drills and sanders when necessary on projects.
  • Maintained clean, safe working environment by removing debris from job site prior to shift completion.
  • Performed various carpentry tasks such as constructing walls, installing doors, windows and siding.
  • Coordinated with other workers onsite to ensure efficient completion of tasks.
  • Repaired damaged structures with appropriate materials including wood and metal components.

Education

Jose Chavarria
San diego

Skills

  • Construction safety
  • Carpentry basics
  • Power tools
  • Blueprint reading
  • Drywall installation
  • Framing techniques
  • Material handling
  • Window installation
  • Safety and compliance
  • Power tool operation
  • Material transport
  • Carpentry
  • Measuring and leveling
  • Basic carpentry
  • Demolition experience
  • Insulation application
  • Concrete finishing
  • Demolition
  • Framing
  • Drywall hanging
  • Painting and finishing
  • Attention to detail
  • Spray finishing
  • Materials loading
  • HVAC systems
  • Problem-solving
  • Landscaping
  • Cabinet installation
  • Electrical installation
  • Construction
  • Physical stamina
  • Truck loading
  • Equipment maintenance
  • Heavy lifting
  • Framing construction

Languages

English/spanish
Professional

Timeline

Construction Worker

Regency
02.2016 - 11.2018

Jose Chavarria
Jose Chavarria