Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jose Gonzales

Fairfield ,TX

Summary

Seasoned Poly Formen and Safety Coordinator with a proven track record at Watkins Construction, demonstrating exceptional crew leadership and critical thinking. Skilled in ensuring project completion through rigorous safety protocols and effective communication. Expert in poly and steel pipeline work, showcasing a dedicated work ethic and bilingual proficiency. Achievements include enhancing project efficiency and maintaining high-quality standards.

Overview

10
10
years of professional experience

Work History

Poly Formen

Watkins Construction
09.2022 - Current
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.

fuse poly pipe mainlines from 3/4” to 12”

Perform pressure test on all poly mains

Poly Formen

Iron Horse
05.2022 - 09.2022
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Reviewed project details to specify correct materials and equipment for job sites.

Safety Coordinator

LOC
05.2021 - 05.2022
  • Safely inspect all job sight locations on XTO projects
  • Revise and inspect all JSAs with work crews on location and perform healthy safety topic discussions in safety meetings.

Poly Formen

Driver Pipline
01.2020 - 05.2021
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Evaluated incoming materials for quality and amounts ordered.
  • Established clear priorities and production quality standards.
  • Fuse poly pipe from 3/4” to 12” main line and service lines to feed natural gas to houses

Steel Formen

Capco Contractors
02.2018 - 01.2020
  • Organized workforce teams with clear roles and responsibilities to maximize individual strengths while balancing workload demands efficiently.
  • Enhanced project efficiency by implementing streamlined processes for steel fabrication and assembly.
  • Ensured compliance with industry regulations by staying current on codes, guidelines, and best practices in the field of steel construction.
  • Achieved timely completion of projects through rigorous monitoring of progress and proactive problem solving.
  • Hydro testing all mainline steel pipe (pressure testing)
  • Spacing main line pipe from 4” to 36”
  • Drying all steel mainlines using dryer to reach dew points to gas company specs

Labor Hand

Watkins Construction Company
02.2014 - 02.2018
  • Assisted in meeting project deadlines through diligent support of various tradesmen onsite.
  • Demonstrated versatility in supporting multiple trades, allowing seamless adaptation to changing job site requirements.
  • Sand blast and coat steel pipelines
  • String skids for 2” - 36” steel main lines

Education

Fairfield High School
Fairfield, TX
06.2011

Skills

  • Crew Leadership
  • Attention to Detail
  • Effective Communication
  • Dedicated Work Ethic
  • Critical Thinking
  • Bilingual

Timeline

Poly Formen

Watkins Construction
09.2022 - Current

Poly Formen

Iron Horse
05.2022 - 09.2022

Safety Coordinator

LOC
05.2021 - 05.2022

Poly Formen

Driver Pipline
01.2020 - 05.2021

Steel Formen

Capco Contractors
02.2018 - 01.2020

Labor Hand

Watkins Construction Company
02.2014 - 02.2018

Fairfield High School
Jose Gonzales