Summary
Overview
Work History
Skills
Timeline
Generic

Jose Montelongo

San Jacinto,CA

Summary

Results-driven construction leader with over 16 years of experience, including 2 years as an assistant superintendent, 5 years as a Foreman at Flatiron Construction Corp. and 8 years as a carpenter. Known for improving safety protocols and efficiency, specializing in concrete finishing and heavy equipment operation. Thrives in fast-paced environments, consistently delivering projects on schedule while promoting team development. Successfully managed a team of 6 employees, including an operator, achieving OSHA 10-hour certification and receiving recognition for surpassing production goals.

Overview

16
16
years of professional experience

Work History

Journeyman Carpenter

Fasone construction
Whittier, California
08.2025 - 08.2026
  • Prepared wood forms for concrete pours.
  • Concrete finish
  • Operated several machinery including: skid-steer, excavator, and skytrak.
  • Completed all my assigned projects and met deadlines.

Journeyman Carpenter

De Vries Construction
Pasadena, CA
04.2025 - 07.2025
  • Operated electric cordless drills and cutting torches to ensure precise and safe execution of tasks.
  • Operated forklifts and other heavy equipment.
  • Measured and marked cutting lines on materials, ensuring accuracy for quality craftsmanship.
  • Cut and shaped materials to meet outlined measurements.
  • Maintained safety protocols and organization to protect personal and teammate well-being.

Journeyman Carpenter

Skanska Construction
Moreno Valley, CA
10.2024 - 11.2024
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Read and interpreted blueprints, sketches and specifications to understand job.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Inspected job sites to identify potential hazards and establish protection and safety standards.

Assistant Superintendent/Structural Foreman

Flatiron Construction Corp.
Fort Worth
02.2017 - 07.2024
  • Maintained good housekeeping.
  • Administered disciplinary actions to workers violating safety regulations and company policies.
  • Provided feedback to workers on job performance and safety procedures.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Inspected equipment and tools used for safe operation.
  • Investigated and reported on accidents, injuries and near-miss incidents.
  • Directed projects according to schedule and quality demands.
  • Created and implemented plans to maximize efficiency of workers.
  • Trained workers in proper methods, equipment operation and safety procedures.
  • Prepared and submitted reports on job progress and safety conditions to upper management.
  • Submitted daily log with production count.
  • Install overhang deck edge, deck pouring (finish with Bull Float and Straight Edge), deck panel.
  • Build and install iron or steel girders, columns and other structures.
  • Caps/ PT Cap Abutments.
  • Prepared Slab on bridge, and rails (styrofoam build up on girders, panel setting, deck forming, level form BRG seat, H forms, steel tie).
  • Pouring, Finishing of cement.
  • Sidewalks Riprap, columns, drilled shaft, column, cap, gutters, styrofoam, panels, rebar, H form and pouring of concrete.
  • Footing for rails STRR.

Construction Carpenter

Lane Construction Co
Fort Worth
10.2012 - 02.2017
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Completed installations of building structures, trim, flooring, and cabinetry.
  • Planned and executed work with proper tools and materials to maximize productivity.
  • Followed established job site safety regulations and maintained safe and clean work area.
  • Prepared layout for pouring.
  • Build wood and metal forms for casting of concrete structures.
  • Erect and wreck of all form, guardrails and temporary supports.
  • Set and tie steel rebar.
  • Pour and finish concrete.
  • Read and interpreted blueprints to follow specifications of projects.
  • Measured materials to determine sizes and quantity required for construction project.
  • Demonstrated close attention to detail to verify quality and accuracy of work.

Construction Carpenter

Potter Concrete
Paris, TX
05.2010 - 10.2012
  • Planned projects by identifying necessary equipment, tools, and required assistance.
  • Prepared work area for pouring.
  • Placed forms, tied rebar.
  • Built wood forms for construction projects.

Skills

  • Load Calculations
  • Building Codes
  • Concrete finishing
  • Scaffolding Setup
  • Fast learner
  • Hard working
  • Reliable
  • Dependable
  • Commercial projects
  • Footings
  • Framing
  • Operator: backhoe, excavator, skid-steer, bull dozen, front loader, boom lift, and skytra
  • Blueprint reading

Timeline

Journeyman Carpenter

Fasone construction
08.2025 - 08.2026

Journeyman Carpenter

De Vries Construction
04.2025 - 07.2025

Journeyman Carpenter

Skanska Construction
10.2024 - 11.2024

Assistant Superintendent/Structural Foreman

Flatiron Construction Corp.
02.2017 - 07.2024

Construction Carpenter

Lane Construction Co
10.2012 - 02.2017

Construction Carpenter

Potter Concrete
05.2010 - 10.2012
Jose Montelongo