Results-driven construction leader with over 16 years of experience, including 2 years as an assistant superintendent, 5 years as a Foreman at Flatiron Construction Corp. and 8 years as a carpenter. Known for improving safety protocols and efficiency, specializing in concrete finishing and heavy equipment operation. Thrives in fast-paced environments, consistently delivering projects on schedule while promoting team development. Successfully managed a team of 6 employees, including an operator, achieving OSHA 10-hour certification and receiving recognition for surpassing production goals.
Overview
16
16
years of professional experience
Work History
Journeyman Carpenter
Fasone construction
Whittier, California
08.2025 - 08.2026
Prepared wood forms for concrete pours.
Concrete finish
Operated several machinery including: skid-steer, excavator, and skytrak.
Completed all my assigned projects and met deadlines.
Journeyman Carpenter
De Vries Construction
Pasadena, CA
04.2025 - 07.2025
Operated electric cordless drills and cutting torches to ensure precise and safe execution of tasks.
Operated forklifts and other heavy equipment.
Measured and marked cutting lines on materials, ensuring accuracy for quality craftsmanship.
Cut and shaped materials to meet outlined measurements.
Maintained safety protocols and organization to protect personal and teammate well-being.
Journeyman Carpenter
Skanska Construction
Moreno Valley, CA
10.2024 - 11.2024
Followed established job site safety regulations and maintained safe and clean work area.
Read and interpreted blueprints, sketches and specifications to understand job.
Planned and executed work with proper tools and materials to maximize productivity.
Demonstrated close attention to detail to verify quality and accuracy of work.
Inspected job sites to identify potential hazards and establish protection and safety standards.
Assistant Superintendent/Structural Foreman
Flatiron Construction Corp.
Fort Worth
02.2017 - 07.2024
Maintained good housekeeping.
Administered disciplinary actions to workers violating safety regulations and company policies.
Provided feedback to workers on job performance and safety procedures.
Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
Inspected equipment and tools used for safe operation.
Investigated and reported on accidents, injuries and near-miss incidents.
Directed projects according to schedule and quality demands.
Created and implemented plans to maximize efficiency of workers.
Trained workers in proper methods, equipment operation and safety procedures.
Prepared and submitted reports on job progress and safety conditions to upper management.
Submitted daily log with production count.
Install overhang deck edge, deck pouring (finish with Bull Float and Straight Edge), deck panel.
Build and install iron or steel girders, columns and other structures.
Caps/ PT Cap Abutments.
Prepared Slab on bridge, and rails (styrofoam build up on girders, panel setting, deck forming, level form BRG seat, H forms, steel tie).
Pouring, Finishing of cement.
Sidewalks Riprap, columns, drilled shaft, column, cap, gutters, styrofoam, panels, rebar, H form and pouring of concrete.
Footing for rails STRR.
Construction Carpenter
Lane Construction Co
Fort Worth
10.2012 - 02.2017
Planned projects by identifying necessary equipment, tools, and required assistance.
Completed installations of building structures, trim, flooring, and cabinetry.
Planned and executed work with proper tools and materials to maximize productivity.
Followed established job site safety regulations and maintained safe and clean work area.
Prepared layout for pouring.
Build wood and metal forms for casting of concrete structures.
Erect and wreck of all form, guardrails and temporary supports.
Set and tie steel rebar.
Pour and finish concrete.
Read and interpreted blueprints to follow specifications of projects.
Measured materials to determine sizes and quantity required for construction project.
Demonstrated close attention to detail to verify quality and accuracy of work.
Construction Carpenter
Potter Concrete
Paris, TX
05.2010 - 10.2012
Planned projects by identifying necessary equipment, tools, and required assistance.
Prepared work area for pouring.
Placed forms, tied rebar.
Built wood forms for construction projects.
Skills
Load Calculations
Building Codes
Concrete finishing
Scaffolding Setup
Fast learner
Hard working
Reliable
Dependable
Commercial projects
Footings
Framing
Operator: backhoe, excavator, skid-steer, bull dozen, front loader, boom lift, and skytra