Overview
Work History
Education
Timeline
Installer

Jose Rangel

Vizex
Elizabethton,TN
33
years of professional experience

Work History

Installer

1 Year 6 Months
Vizex | 05.2025 - Current
  • Installed signage, fixtures, and display components using hand tools, drills, and measuring equipment.
  • Interpreted work orders, site layouts, and blueprints to complete accurate field installations.
  • Loaded, transported, and organized materials for efficient jobsite setup and completion.
  • Verified alignment, placement, and finish quality to meet project specifications.
  • Assisted with equipment setup, teardown, and cleanup to maintain safe work areas.
  • Collaborated with team members and clients to complete installations on schedule.
  • Installed complete systems at new residential and business construction sites.
  • Collaborated with team members to ensure smooth workflow and successful project completion.
  • Maintained a safe work environment by strictly adhering to safety protocols and guidelines.
  • Addressed client concerns professionally, demonstrating a commitment to excellent customer service throughout the installation process.
  • Calculated materials and time needed for each job.
  • Managed maintenance activities, supervised staff, and inspected equipment.
  • Customized installations to meet specific customer requirements, ensuring full functionality and satisfaction.
  • Provided detailed documentation of completed work for accurate recordkeeping purposes, facilitating future maintenance or repairs as needed.
  • Developed and maintained professional relationships with customers and vendors to promote loyalty and referrals.
  • Managed inventory effectively, ensuring all necessary supplies were on hand for each project without excess waste or stockpiling materials.

Lead Installer

2 Years 2 Months
SKY Retail Service | 03.2023 - 05.2025

Supervised installation of elements critical to completion of projects with set time and date restraints. Coordinated with multiple departments in order to ensure a smooth installation in all aspects of the project.

  • Led retail fixture installations, ensuring accurate placement, leveling, and secure assembly across job sites.
  • Coordinated installation crews to maintain workflow, meet deadlines, and resolve on-site issues efficiently.
  • Interpreted blueprints, layout drawings, and planograms to execute precise merchandising and fixture setups.
  • Trained team members on tools, safety practices, and installation procedures to improve consistency.
  • Communicated with project managers and store personnel to coordinate schedules and site readiness.
  • Enforced jobsite safety standards while handling materials, equipment, and installation tasks.
  • Supervised installation crews to ensure accurate retail fixture assembly and placement.
  • Coordinated jobsite readiness, verifying tools, materials, and safety requirements before deployment.
  • Interpreted blueprints and schematics to complete consistent, compliant store installations.
  • Inspected finished installations, correcting alignment, hardware, and finish issues.
  • Communicated with project teams to resolve site constraints and installation changes.
  • Documented completed work and escalated issues impacting schedule, quality, or customer requirements.
  • Established strong relationships with clients through excellent communication skills and professionalism throughout the entire installation process.
  • Communicated quickly and accurately with supervisors about problematic sites, missed installations or other issues.
  • Provided on-site supervision, ensuring proper adherence to safety regulations and protocols.

Construction Superintendent

16 Years 3 Months
Rowe Construction | 03.2007 - 06.2023
  • Directed daily field operations, coordinating subcontractors, crews, and inspection schedules.
  • Supervised site safety compliance, enforcing OSHA standards and correcting hazards promptly.
  • Managed construction schedules, sequencing work to maintain project continuity and milestones.
  • Reviewed plans and specifications, resolving field issues with architects and project teams.
  • Coordinated materials deliveries and equipment availability to support uninterrupted workflow.
  • Led subcontractor coordination meetings, aligning tasks, deadlines, and site expectations.
  • Documented progress reports, punch lists, and closeout items for project completion.
  • Supervised field crews to maximize quality and work efficiency.
  • Managed subcontractors effectively, ensuring timely completion of tasks and high-quality workmanship.
  • Scheduled subcontractors, consultants and vendors to coordinate completion of jobs and tasks.
  • Developed strong relationships with clients, architects, engineers, and other stakeholders to ensure smooth collaboration throughout the project lifecycle.
  • Maintained accurate records related to project progress reports, change orders, subcontractor agreements, invoices for timely submission to clients or regulatory agencies when required.
  • Devised and implemented safety protocols to reduce risks on construction and extraction sites.
  • Established and enforced safety regulations, procedures and standards for construction and extraction workers.
  • Evaluated and updated safety protocols to reduce risks on construction and extraction sites.
  • Sourced suppliers and purchased necessary materials for work.
  • Directed projects according to schedule and quality demands.
  • Reviewed project details to specify correct materials and equipment for job sites.
  • Reduced downtime on construction sites through proactive maintenance planning and quick resolution of equipment issues.
  • Contributed to company growth through successful management of multiple concurrent projects, ensuring profitability without compromising quality or safety standards.
  • Led successful project closeout procedures, ensuring all contractual obligations were met and any outstanding issues resolved promptly.

Offset Press Plate Maker

8 Years 2 Months
The Roan Oak Times | 04.1999 - 06.2007

Cpt operator

Maintain flow of information from computer to physical plate

Maintain strict time restraints in order to complete tasks as scheduled

Coordinated with multiple departments to maintain correct information to complete tasks

Proofread all recieved information before printing to plate

Maintain flow of completed plates to offset press to complete projects on time

Inspected all plates for defects or incorrect information

Developed process of information to show past current and predicted completion reports

Soldier

3 Years
Army National Gaurd | 04.1998 - 04.2001
  • Supported combat readiness tasks, maintained discipline, kept equipment accountable, and prepared mission gear.
  • Assisted unit members with weapons handling, tactical movement, and field training operations.
  • Provided emergency response support during domestic missions and community assistance operations.
  • Checked and maintained assigned gear, vehicles, and communications equipment for reliable use.
  • Completed combat medic training in first aid, trauma care, CPR, and AED use.
  • Managed escalating, volatile situations through physical defense, hand-to-hand combat, and self-defense procedures.
  • Trained in emergency control and critical movement procedures during traumatic events to protect civilian and military personnel.

Soldier

3 Years 9 Months
Navy | 06.1993 - 03.1997
  • Supported combat readiness tasks while maintaining discipline, equipment accountability, and mission readiness.
  • Trained alongside unit members on weapons handling, tactical movement, and field operations.
  • Assisted emergency response support during domestic missions and community assistance operations.
  • Checked and maintained assigned gear, vehicles, and communications equipment for reliable operation.
  • Maintained high professionalism on- and off-duty while representing U.S. military with honor.
  • Built leadership skills through rigorous training and experience in high-pressure situations.

Education

- General Studies

Man High | Man, WV | 06-1993

Timeline

Installer

Vizex
05.2025 - CurrentRead More

Lead Installer

SKY Retail Service
03.2023 - 05.2025Read More

Construction Superintendent

Rowe Construction
03.2007 - 06.2023Read More

Offset Press Plate Maker

The Roan Oak Times
04.1999 - 06.2007Read More

Soldier

Army National Gaurd
04.1998 - 04.2001Read More

Soldier

Navy
06.1993 - 03.1997Read More

Man High

from General Studies
Read More
Jose Rangel