Summary
Overview
Work History
Education
Skills
Languages
Certification
Timeline
Generic

Jose Valdez

Hesperia,CA

Summary

Detail-oriented carpenter specializing in drywall installation, blueprint analysis, and structural reinforcement. Proven track record of maintaining safety compliance and meeting project deadlines.

Overview

25
25
years of professional experience
1
1
Certification

Work History

Carpenter

Quality Production Services
18711 S Broadwick St unit a, Rancho Dominguez, CA
11.2000 - 07.2025
  • Constructed custom frames using various materials and techniques.
  • Operated framing machinery to cut, mold, and assemble frames efficiently.
  • Assembled and nailed together the framework of studs, headers and sills.
  • Analyzed blueprints and drawings to determine structural dimensions of framework.
  • Reinforced structural elements with metal ties to meet local building codes.
  • Installed drywall, plasterboard or paneling over interior walls and ceilings.
  • Attached insulation material between wall studs or ceiling joists to provide thermal protection.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Cut metal lath to size for reinforcing stucco finishes on walls and ceilings.
  • Anchored and braced forms and other structures in place using nails, bolts, anchor rods, steel cables, planks, wedges and timbers.
  • Trained junior framers on best practices and safe equipment usage.
  • Communicated with teammates and supervisors frequently to understand requirements and complete projects on time.
  • Worked independently on projects and tasks within carpentry team.
  • Consistently constructed square and level projects.
  • Maintained records and documented actions for progress reports.
  • Placed protective coverings over finished surfaces while working in order to prevent damage caused by tools or debris.
  • Installed drywall sheets in residential and commercial buildings.
  • Ensured precise measurements for cutting and fitting drywall panels.
  • Applied joint compound to seams and fasteners for smooth finishes.
  • Operated hand tools and power tools for drywall installation tasks.
  • Collaborated with team members to maintain project timelines and quality standards.
  • Followed safety protocols to minimize hazards on job sites.
  • Maintained clean work environment throughout the installation process.
  • Installed drywall panels on walls and ceilings using screws, nails, or adhesives.
  • Measured and cut drywall sheets to fit into wall frames.
  • Cleared job sites of debris and tools after finishing tasks.
  • Followed safety protocols while working with hazardous materials like fiberglass insulation.
  • Completed drywall finish work with exceptional quality and efficiency.
  • Checked for accuracy in measurements before installing the drywall material.
  • Installed and oversaw installation of drywall on various commercial and residential projects.
  • Repaired damaged drywall sections due to water leakage or other causes.
  • Lifted heavy objects such as ladders and tools during installation activities without assistance from others.
  • Used power tools such as drills, saws to cut holes in walls for electrical wiring or plumbing lines.
  • Used hand tools such as trowels, broad knives or spatulas to apply sealing compound to holes and cracks.
  • Assisted in loading and unloading of materials from delivery trucks.
  • Communicated effectively with supervisors and co-workers regarding project updates and timelines.
  • Adhered strictly to all building codes and regulations while performing the installation tasks.
  • Inspected completed work for defects such as cracks, unevenness, dents.
  • Maintained consistent attendance and punctuality at work.
  • Attached metal corner beads at corners of walls prior to applying plaster mix.
  • Used scribes to cut guidelines on drywall sheets.
  • Demonstrated efficiency and dedication to quality by contributing to successfully completed jobs.
  • Provided guidance to apprentices and laborers while working on site.
  • Trained team members in proper installation methods to meet project quality and efficiency standards.
  • Assembled or attached framing and decorative trim for doors, windows and vents.
  • Reviewed blueprints and diagrams to plan work sequences and verify project requirements.
  • Followed requirements for installing clips and blackout cuts.

Education

High School Diploma -

Serrano High School
Phelan
06-2020

Skills

  • Drywall installation
  • Blueprint analysis
  • Structural reinforcement
  • Safety compliance
  • Material handling
  • Project coordination
  • Planning
  • Time management
  • Problem solving
  • Training junior staff
  • Team collaboration
  • Attention to detail
  • Verbal communication
  • Active listening
  • Leadership
  • Effective communication

Languages

Spanish
Professional

Certification

Osha 10, fall protection, Arial lift, 

Timeline

Carpenter

Quality Production Services
11.2000 - 07.2025

High School Diploma -

Serrano High School
Jose Valdez