Committed job seeker with a history of meeting company needs with consistent and organized practices. Skilled in working under pressure and adapting to new situations and challenges to best enhance the organizational brand.
Overview
13
13
years of professional experience
Work History
Field Superintendent
Central Industrial Group
Troy, MI
04.2017 - 01.2023
Oversaw workflow on job sites and kept projects on schedule.
Managed day-to-day operations, including scheduling and supervising field personnel, resolving operational issues and ensuring safety compliance.
Oversaw the selection of appropriate materials needed for each stage of the job.
Developed and maintained relationships with key stakeholders such as clients, contractors, vendors, suppliers and other team members.
Assisted in troubleshooting problems during the construction process by providing solutions based on best practices.
Provided technical support to subcontractors and engineers to ensure project completion on time and within budget.
Resolved conflicts between workers onsite through effective communication strategies.
Performed pre-construction planning activities such as material ordering, equipment rental coordination and manpower scheduling.
Managed multiple projects simultaneously while meeting deadlines and maintaining quality standards.
Ensured that all work was performed according to blueprints, plans and specifications.
Trained new employees on proper safety protocols when working at a construction site.
Inspected buildings to determine quality of work and need for corrections to meet project standards.
Facilitated communications between teams working on different aspects of a particular project in order to ensure smooth transition between stages.
Performed troubleshooting techniques and testing procedures to keep machines working optimally.
Installed stationary industrial machinery and mechanical equipment following layout plans.
Planned out job assignments based on available resources and personnel capabilities.
Scheduled maintenance, repairs, and installations as needed.
Analyzed problems quickly and accurately to determine best solutions for repair or replacement needs.
Documented all work performed including details such as parts used, labor hours.
Journeyman Ironworker
Local 387
Atlanta, GA
12.2009 - 04.2017
Performed layout and installation of structural steel, stairs, rails, ladders and other miscellaneous ironwork items.
Erected columns, beams and girders according to blueprints or specifications.
Repaired defective metal parts using welding techniques as required.
Fabricated metal products according to customer specification using manual cutting torches or plasma arc cutting equipment.
Studied and understood blueprints and specifications before beginning work on projects.
Determined safety risks associated with projects and implemented precautions to address risks.
Led and mentored less-experienced ironworkers and assisted foremen in assigning work activities.