Summary
Overview
Work History
Education
Skills
Certification
Project Experience
Accomplishments
Languages
Timeline
Generic

Jose David Martinez

Victorville,Ca

Summary

Top-performing Project Manager (Construction) with extensive experience successfully interacting with clients and multi-departmental teams to complete projects on time and within budget. Exhibits strong skills in strategic planning, project coordination and team management. Adept and interested in learning new technologies and systems. Forward-thinking construction leader and dedicated Project Manager offering 16+ years of construction and contracting experience on Wireless communication projects. Well-versed in supervising all phases of construction, from pre-construction through final walk throughs and closeout. Proven skills in multitasking on over 100 projects per year. Diligent, diplomatic and inspirational with solid leadership, organizational and decision-making skills focused on delivering exceptional value to customers with high-quality construction.

Overview

18
18
years of professional experience
1
1
Certification

Work History

Construction Manager

GlobeNetUSA
Kannapolis, NC
07.2022 - 03.2023
  • Started in the company providing detailed bid walk notes as well by reading the RF design sheets and CDs
  • Performed partial as well as full decommissioning of T-Mobile cell sites
  • Built new Dish wireless cell sites
  • Managed the installation of wireless communication systems, including radios and antennas.
  • Coordinated with vendors to ensure delivery of necessary equipment for construction projects.
  • Verified accuracy of engineering drawings prior to installation of wireless communications infrastructure.
  • Conducted site surveys to determine locations for antenna placement and optimal signal strength.
  • Prepared cost estimates for various components associated with the construction of a wireless network.
  • Drafted detailed reports documenting all aspects of the construction process from start to finish.
  • Ensured proper documentation was maintained throughout each phase of a project's lifecycle.
  • Maintained up-to-date knowledge on industry trends and best practices related to wireless communications technology.
  • Resolved issues during construction and commissioning phases to maintain tight schedules and budget levels.
  • Prepared and planned worksites to help jobs run smoothly.
  • Cleaned or prepared construction sites to eliminate hazards.
  • Read and interpreted drawings and assessed construction against plans.
  • Inspected sites before and after construction projects.
  • Coordinated phases of construction projects from inception to completion.

RF Operation Manager / Project Manager

Metrocell construction
Ontario, CA
10.2014 - 03.2022
  • Started out in the Project Manager Position in 2014
  • Creating new testing and close out package procedures and training on them
  • Grew the company from 30 to 100 employees and was promoted to Operations Manager
  • In charge of 70% of the VZW SoCal Sites
  • Managed over 500+ sites at a time - ranging from NSB to Mods to NCDs
  • Became a certified Climbing instructor during this time and taught new employees how to climb
  • Trained in various testing and safety equipment
  • Managed over 100 employees ranging from Project Managers to Construction Managers to Foreman
  • Developed and implemented operational procedures to ensure quality standards are met.
  • Monitored and improved efficiency of processes, team performance, and customer service.
  • Directed operations staff by providing guidance, training, and support in order to meet company objectives.
  • Established effective relationships with vendors to negotiate pricing and secure materials needed for production.
  • Ensured compliance with safety regulations and maintained a safe work environment for all personnel.
  • Coordinated with other departments including sales, marketing, finance, human resources. to ensure efficient operations.
  • Implemented innovative strategies that reduced operating costs while maintaining high levels of customer satisfaction.
  • Managed staffing needs through recruitment, selection, onboarding and training, disciplinary action as necessary.
  • Supervised day-to-day workflow of employees in order to maximize productivity and maintain quality standards.
  • Assessed employee development needs and provided feedback on their progress towards meeting goals.
  • Managed scheduling, training and inventory control.
  • Recruited, hired and trained crew members on application of projects, customer relations and customer service.
  • Built strong operational teams to meet process and production demands.
  • Addressed customer concerns with suitable solutions.
  • Implemented policies and standard operating procedures and managed quality, customer service and logistics.
  • Motivated and evaluated personnel for performance improvement and goal achievement.
  • Oversaw financial management, budget management, accounting and payroll activities.
  • Responded to information requests from superiors, providing specific documentation.
  • Tracked and replenished inventory to maintain par levels.
  • Improved morale and management communication by creating employee recognition and rewards practices.
  • Supported accident investigations and prepared related paperwork.

Foreman/Construction Manager

Wavcomm
Ontario, CA
09.2005 - 10.2014
  • Started out in 2005 as a Tower Hand and Promoted to Foreman within the first year
  • MOD Work on the road, both in Washington and Oregon State
  • Worked AT&T Project's swapping out diplexers and TMAs for the new ones that could amplify 850 MHz side
  • This included the 1900MHx ports of the TMAs
  • Swapped out antennas with antennas that had RET actuators
  • Returning to SoCal a year or so later, started working on various projects
  • Cabinet work includes switching out old BTS for OMT software; making sure cabinets were up to date
  • Started working on MetroPCS Projects installing (3) to (6) sector configurations
  • Worked on the Sprint ALU project installing Microwaves to give Sprint the backhaul speed they were trying to achieve
  • Another project worked on was the LOS Project for Sprint installing RRH's on the towers using Samsung equipment
  • AT&T Microwave project upgrading dishes at HUB sites - included 80 miles between hops using talk box radios
  • I was in charge of all VZW NorCal Market construction activities including :Material logistics, Closeout packages, Scheduling crews, Permit sign offs and pulling permits, Warehouse staging.
  • Maintained daily logs of labor and equipment used on-site.
  • Ensured all workers adhered to company policies and procedures.
  • Provided guidance, direction, and technical assistance to crew members.
  • Monitored job progress and ensured completion within budget constraints.
  • Resolved conflicts between workers in a timely manner.
  • Coordinated with other departments to ensure project deadlines were met.
  • Identified areas of improvement for increased efficiency and productivity.
  • Created detailed reports on job progress and submitted them to management on time.
  • Inspected tools, materials, and equipment to ensure quality standards were met.
  • Scheduled staff shifts based on project needs and availability.
  • Trained new employees in safety regulations, operational procedures, and company policies.
  • Assessed work area conditions for potential hazards or risks.
  • Prepared budgets for projects based on labor costs, materials needed.
  • Managed inventory levels of supplies necessary for job completion.
  • Communicated regularly with subcontractors regarding project timelines.
  • Supervised activities of personnel assigned to various tasks during construction jobs.
  • Organized meetings with clients to discuss project specifications.
  • Supervised projects to uphold schedule requirements and quality demands.
  • Managed sites by focusing on safety, operations and productivity.
  • Monitored job site parts and equipment.
  • Established expectations and motivated crews to consistently meet or beat goals.
  • Communicated with employees to demonstrate high standards and mitigate issues.
  • Planned and managed manpower and resource requirements to support project activities.
  • Checked project details to verify job site materials and equipment.
  • Managed workers at various experience levels in construction and restoration projects.
  • Tracked and reported units and labor hours prior to submission of timecards.
  • Monitored processes for continuous improvement and implemented changes to promote quicker task completion.
  • Increased productivity by improving employee morale and cross-functional communications.
  • Supported project quality assurance and quality control planning for assigned tasks.
  • Communicated with suppliers and coordinated delivery of supplies to job sites.
  • Inspected rigging and scaffolding for safety and reliability.
  • Rolled out new processes to achieve operational excellence.
  • Implemented budgets to support equipment and workforce requirements and successfully complete projects.

Education

High school diploma -

Jurupa Valley
11.2000

Skills

  • RFDS/CD Knowledge
  • Vendor/GC Management
  • Site Acquisition
  • Fiber Construction
  • NSBs, Small Cell, Macro ,Das Experience
  • Sprint Vision and M trac Experience
  • Crane Lift Plans Experience
  • Rigging Lift Plan Experince
  • Electrical Low & High voltage
  • Management/Leadership
  • Planning, short/long term
  • Supervision
  • Utility Management
  • Capstan Experience
  • Microsoft Office
  • Project Tracking
  • Logistics Management
  • Work Flow Planning
  • Workforce Training
  • Resource Allocation
  • Project Development
  • Project Management
  • Technical Support
  • Cost Control
  • Document Management
  • Vendor Sourcing
  • Schedule Management
  • Presentations
  • Processes and Procedures
  • Forecasting
  • Budgeting and Forecasting
  • Coaching and Mentoring
  • Project Scope
  • Performance Improvements
  • Commercial Construction Experience
  • Scope Management
  • Mergers and Acquisitions Knowledge
  • Expense Reports
  • Quality Assurance and Control
  • Staff Training and Mentoring
  • Construction Management
  • Business Analysis
  • Data Review
  • Building Codes and Regulations
  • Building Applications
  • Permit Processing
  • Site Safety Coordinator
  • Project Scope Analysis
  • Microsoft Office Suite Expert
  • Purchasing and Procurement
  • Project Scheduling
  • Customer Relations Specialist
  • Safety Protocol
  • Staff Management
  • Cost Reduction and Containment
  • Staff Training and Motivation
  • Inventory Control
  • Project Planning

Certification

  • CPR Certified
  • Blood Born Pathogens
  • OSHA 30
  • Lockout Tag Out
  • Manlift
  • Commtrain Tower and Rescue Climbing Instructor
  • PIM
  • Sweep Master Certified
  • Fiber Tester Certified Anristu
  • PCC Connector Certified
  • Enrolled at UCI to get PMP Certification

Project Experience

  • AAV, Power conversion, Cabinet installs including 3106, 3206, 6201, 6101, PBC 6500 BBU, PBC 6200, L700, L1900
  • Mobilitie Projects-Macro and Mini Macro Builds
  • Sprint Projects-Network vision full installs as well as NV relocations and collar changeouts, 2.5 full install including Cabinet sets ,800MHz growth installs, Clear-wire installation and decommissioning.
  • AT&T Projects-1C, 2C, 3C, 4C, 5C, Drop and swaps, RF NCD's
  • Verizon Projects-LTE, AWS, PCS installs, sub-rack installs, LTE and MCE cabinet installs. Drop and Swaps, GTP's, RF NCD's, 4x4 backpack installs.
  • Cricket Wireless Projects-Antenna C/O's
  • Decommission projects-Metro PCS, Sprint IDEN and Clear Norcal
  • Verizon AWS, LTE MOD projects
  • Dish new and MOD projects
  • XM Radio
  • LARICS Network build and tower erections included.

Accomplishments

  • Certified In-house climbing instructor through Commtrain
  • OSHA 30 certified
  • Anritsu sweep master certified
  • CPR & Blood born pathogens certified
  • PMP certified
  • Anritsu fiber tester certified

Languages

English
Professional
Spanish
Professional

Timeline

Construction Manager

GlobeNetUSA
07.2022 - 03.2023

RF Operation Manager / Project Manager

Metrocell construction
10.2014 - 03.2022

Foreman/Construction Manager

Wavcomm
09.2005 - 10.2014

High school diploma -

Jurupa Valley
Jose David Martinez