Accomplished Crew Leader with a proven track record at BHI, enhancing team productivity by 40% through effective crew management and safety guideline enforcement. Skilled in heavy machinery operation and fostering a collaborative team environment, I excel in multitasking and proactive problem-solving, ensuring project completion with excellence.
Overview
7
7
years of professional experience
Work History
Crew Leader
BHI
11.2018 - Current
Trained employees in time management and proper ways to complete job duties.
Maintained a safe working environment by enforcing strict adherence to safety guidelines and promptly addressing potential hazards.
Monitored team members to verify work quality and address concerns.
Served as the primary point of contact between crew members and upper management, relaying important information as necessary.
Instructed crew members in safe work practices and methods to reduce work-related injuries.
Provided ongoing training and support for new hires, ensuring they were well-equipped to perform their duties effectively.
Boosted customer satisfaction by ensuring that all crew members provided high-quality service in line with company standards.
Developed a strong sense of teamwork among crew members through regular communication and team building activities.
Discussed daily work requirements with crew and assigned skills-based tasks to enable completion of work.
Motivated team members by setting high expectations, recognizing achievements, and providing ongoing encouragement throughout challenging projects.
Enhanced team productivity by implementing efficient work processes and providing clear guidance for crew members.
Ensured timely completion of projects by effectively allocating tasks and closely monitoring progress.
Pitched in to help with various job tasks, fill in for sick employees and complete projects.
Addressed any personnel conflicts or issues in a timely manner, maintaining open lines of communication with all team members.
Settled crew member disputes by addressing problems quickly and providing successful mediation.
Implemented quality control measures to ensure consistent results across all completed tasks and projects.
Provided expert guidance and support to crew members when faced with complex challenges or difficult decisions, fostering a solutions-oriented approach in the workplace.
Streamlined workflow processes to reduce downtime and increase overall productivity within the team.
Established and enforced policies and procedures to maintain high standards of work.
Conducted regular performance evaluations to identify areas of improvement and provide constructive feedback to crew members.
Organized regular team meetings to discuss progress, address concerns, and ensure that all crew members were aligned with project goals.
Promoted safe and inclusive work environment, resulting in lower turnover rates and higher crew satisfaction.
Led by example, demonstrating commitment and professionalism in all aspects of work, thereby elevating overall team performance.
Maintained accurate and timely project documentation, facilitating clear communication across teams.
Achieved significant improvements in project completion times by strategically allocating tasks based on crew strengths.
Moved and cleared debris from work sites to dispose of in designated areas.
Inspected tools and equipment to maintain safety and efficiency.
Managed safe and efficient use of tools and equipment on construction sites.
Followed instructions and safety protocols to prevent accidents and injuries.
Followed instructions and safety protocols while operating machinery and equipment.
Used variety of hand and power tools to complete tasks.
Cleaned and maintained tools, equipment and worksites.
Improved safety standards on-site with rigorous enforcement of safety protocols and regular training sessions.
Insulator
Asbestos Removal Services
09.2017 - 01.2018
Performed thorough post-installation inspections to ensure all areas were adequately insulated and free from gaps or defects.
Minimized waste by accurately measuring and cutting insulation materials to fit specific spaces precisely.
Prepared surfaces for insulation with help of adhesives, cement and other compounds.
Cut, formed and arranged insulation to promote efficiency of materials for each project.
Operated hand tools such as beader crimpers, brakes and shears.
Applied and handled insulating products such as foam, fiberglass and cloth with mud.
Fabricated fiberglass pipe and duct materials for installation in commercial and residential projects.
Measured, cut and laid insulating blankets for water heaters and tanks.
Maintained a clean work environment by safely disposing of debris and hazardous materials following industry best practices.
Installed and secured protective sheet metal to minimize damage and degradation.
Enhanced team productivity by sharing best practices, tips, and techniques for efficient insulation material handling and installation among colleagues.
Education
High School
México
07.2003
Skills
Crew oversight
Safety Guidelines
Multitasking and Organization
Crew Management
Crew Coordination
New Hire Training
Proactive Problem Solving
Delegating Work
Team Management
Heavy Machinery Operation
Languages
Spanish
Native or Bilingual
English
Limited Working
Timeline
Crew Leader
BHI
11.2018 - Current
Insulator
Asbestos Removal Services
09.2017 - 01.2018
High School
Similar Profiles
Jose LeosJose Leos
Material Control Manager/Electrical Apprentice at BHIMaterial Control Manager/Electrical Apprentice at BHI