Summary
Overview
Work History
Education
Skills
Timeline
Generic

Jose Luis Bustamante

Edinburg,TX

Summary

Detail-oriented Millwright with expertise in safety compliance, equipment installation, and conveyor systems. Proven ability to implement safety protocols and streamline processes for enhanced productivity.

Experienced with structural steel fabrication and assembly. Utilizes advanced welding techniques and precise blueprint reading to ensure project accuracy. Track record of effective collaboration and adherence to safety protocols in dynamic environments.

Overview

8
8
years of professional experience

Work History

Millwright

Swat Specialty Welding
Gonzales, LA
03.2025 - 01.2026
  • Conducted inspections and quality checks on machinery to uphold safety standards and operational reliability.
  • Implemented process improvements that increased productivity while reducing maintenance costs over time.
  • Led troubleshooting efforts during equipment failures, restoring functionality quickly through effective problem-solving strategies.
  • Conducted routine inspections of conveyor equipment, identifying and addressing potential hazards proactively.
  • Led teams in large-scale conveyor installations, coordinating logistics and workflow for timely completion.
  • Improved installation processes by implementing best practices, reducing downtime during projects.
  • Developed maintenance schedules for conveyor systems to enhance reliability and extend equipment lifespan.

Millwright

Trillium Construction
Deer Park, TX
12.2023 - 03.2025
  • Installed, repaired, and maintained machinery to ensure optimal performance and minimal downtime.
  • Diagnosed mechanical issues using precision tools and techniques to enhance operational efficiency.
  • Collaborated with cross-functional teams to streamline maintenance processes and improve workflow.
  • Developed preventative maintenance schedules to extend equipment lifespan and reduce emergency repairs.
  • Collaborated with team members to optimize workflow and improve project timelines.
  • Interpreted technical drawings to accurately execute construction tasks with precision.
  • Utilized hand tools and power tools effectively to complete assigned tasks efficiently.
  • Installed and maintained conveyor systems, ensuring optimal functionality and safety compliance.
  • Collaborated with team members to troubleshoot and resolve operational issues efficiently.
  • Conducted routine inspections of conveyor equipment, identifying and addressing potential hazards proactively.

Millwright/Ironworker

Able Industrial
Houston, TX
02.2021 - 11.2023
  • Replaced defective parts of machines and adjusted clearances and alignment of moving parts.
  • Used hoisting and rigging equipment to move heavy machinery and equipment.
  • Made repairs and modified equipment by welding, soldering and brazing to avoid production delays.
  • Adeptly utilized a range of hand tools, power tools, and precision measuring instruments to ensure accurate workmanship in all tasks.
  • Erected structural steel frames and columns
  • Cut and hoisted steel beams, columns, and girders into place
  • Bolted steel columns and girders into position for permanent installation
  • Connected steel columns and girders with welding techniques
  • Ensured all safety protocols and regulations were followed at all times
  • Inspected and maintained tools and equipment
  • Operated cranes, hoists and other lifting devices
  • Utilized torches and other metal cutting tools

Millwright/Ironworker

Optimal Field Sevices
Gonzales, LA
06.2019 - 11.2020
  • Implemented safety procedures during installations and repairs, enhancing workplace safety standards.
  • Assisted in training new technicians on proper equipment handling and maintenance practices.
  • Monitored inventory levels of tools and parts, ensuring availability for timely project completion.
  • Streamlined repair processes, contributing to increased efficiency in machine servicing tasks.
  • Installed stationary industrial machinery and mechanical equipment according to layout plans.
  • Consistently met or exceeded company performance metrics for maintenance efficiency, equipment uptime, and safety compliance.
  • Conducted safety inspections to maintain compliance with industry standards and regulations.
  • Assisted in the installation of metal decking, railings, and other structural components.
  • Erected structural steel and iron frameworks for bridges, buildings and other structures.

Millwright/Ironworker

Trillium Construction
Deer Park, TX
02.2018 - 03.2019
  • Assembled and installed machinery components following detailed blueprints and specifications.
  • Conducted routine maintenance on equipment to ensure optimal performance and reliability.
  • Diagnosed mechanical issues using precision tools, reducing downtime during operations.
  • Collaborated with team members to troubleshoot complex machinery problems effectively.
  • Aligned and leveled machines using precision measuring instruments to avoid unnecessary wear and tear.
  • Operated machine tools to fabricate parts during overhaul, maintenance, or setup of machineries.
  • Fabricated and assembled steel structures according to blueprints and specifications.
  • Erected structural steel and iron frameworks for bridges, buildings and other structures.
  • Cut metal components to required lengths using metal shears, hacksaws, and bar cutters.
  • Ensured structural integrity by properly installing and aligning steel components according to specifications.
  • Inspected completed work for accuracy and adherence to building codes and safety standards.
  • Improved installation processes by implementing best practices, reducing downtime during projects.
  • Conducted routine inspections of conveyor equipment, identifying and addressing potential hazards proactively.

Education

La Joya High School
La Joya

Skills

  • Safety compliance
  • Equipment installation
  • Heavy lifting
  • Fabrication
  • steel
  • Conveyor systems
  • Equipment Repair
  • Tool repair and maintenance
  • Rigging techniques
  • Structural bolting
  • Construction safety
  • Anchor bolt setting
  • Safety measures
  • Beam placement
  • Metal decking installation
  • Safety protocols and procedures
  • Oxy-fuel cutting
  • Column connecting
  • Mechanical installation
  • Hand and power tools
  • Attention to detail

Timeline

Millwright

Swat Specialty Welding
03.2025 - 01.2026

Millwright

Trillium Construction
12.2023 - 03.2025

Millwright/Ironworker

Able Industrial
02.2021 - 11.2023

Millwright/Ironworker

Optimal Field Sevices
06.2019 - 11.2020

Millwright/Ironworker

Trillium Construction
02.2018 - 03.2019

La Joya High School
Jose Luis Bustamante