Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jose Manuel Hernandez Perez

Petaluma,CA

Overview

16
16
years of professional experience
1
1
Certification

Work History

General Construction Worker

JMH Construction
Petaluma, CA
03.2025 - Current
  • Polished windows, glass partitions or mirrors using sponges or squeegees.
  • Addressed minor maintenance issues, reporting more serious conditions to supervisors for attention from maintenance technicians.
  • Monitored building security and safety by locking doors or avoiding hazards.
  • Stocked supplies such as linens, towels and toiletries in guest rooms.
  • Read and interpreted drawings and assessed construction against plans.
  • Oversaw all aspects of construction projects from start to finish.
  • Conducted regular on-site inspections to monitor construction progress and quality.
  • Incorporated client feedback to help construction crew and subcontractors execute change orders.
  • Ordered supplies and controlled inventory to keep overhead low and maintain supply availability.
  • Ensured that safety standards were maintained at all times during the duration of the project.
  • Conducted site pre-inspections and coordinated post-construction audits.
  • Maintained accurate records of daily progress, costs, and materials used on the project.
  • Prepared detailed cost estimates based on labor, material, equipment, overhead costs and other related expenses.
  • Conducted site inspections to ensure compliance with safety regulations and building codes.
  • Coordinated with architects and engineers to finalize project plans and blueprints.
  • Inspected sites before and after construction projects.

Framing Carpenter

Tim Grogan biuldres
Sebastopol, CA
04.2018 - 03.2022
  • Analyzed problematic installations and implemented appropriate solutions for quick remediation.
  • Repaired damaged structures using appropriate methods such as hammering, sawing, drilling.
  • Fastened sub-flooring panels securely in place before installing floor coverings such as carpets or vinyl tiles.
  • Roughed in door and window frames or subflooring in structures undergoing construction or repair.
  • Installed windows, flooring, or trim using hand or power tools.
  • Installed window and door frames into interior walls.
  • Applied weatherproofing treatments to exposed wood surfaces prior to painting or staining.
  • Connected headers over windows and doorways in order to provide support for the structure's load bearing capacity.
  • Built scaffolding as needed for access to higher elevations on the job site.
  • Assembled staircases according to code requirements.
  • Fabricated trusses from engineered drawings and specifications.
  • Fastened timbers or lumber with glue, screws or pegs.
  • Measured and marked cutting lines on wood and raw materials.
  • Fashioned frameworks or props using hand tools and wood screws, nails or glue.
  • Positioned and held timbers, lumber, or paneling in place for fastening or cutting.
  • Ensured that all safety regulations were adhered to while working at height.
  • Applied caulk, sealants and other agents to installed surfaces.
  • Maintained tools and supplies in good condition throughout the project duration.
  • Consistently constructed square and level projects.
  • Took accurate measurements to calculate size and amount of materials needed for project completion.
  • Utilized various tools, equipment, materials and forming systems to complete construction tasks.
  • Studied blueprints or building plans to prepare layout and materials required.
  • Maintained records and documented actions for progress reports.

Maintenance Supervisor

FPI Management
Rohnert Park
02.2015 - 03.2018
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Minimized severity or frequency of accidents of contractors and maintenance personnel using risk identification process.
  • Implemented improved training procedures to better develop new personnel.
  • Maintained records of repairs and parts inventory usage to optimize future planning efforts.
  • Ordered replacement parts as required to keep machines running efficiently.
  • Maintained accurate records of all maintenance activities performed.
  • Repaired equipment and machinery, performing maintenance according to updated industry standards.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Inspected machines and equipment for conformance with operational standards.
  • Reported project progress, site problems and labor status to supervisors.
  • Prepared and monitored budget to keep maintenance department financially sound.
  • Researched new products or services that would enhance the company's ability to maintain its competitive edge in the industry.
  • Filled out work orders, repair logs and maintenance plans to document work completed.
  • Worked closely with vendors and suppliers to purchase spare parts at competitive prices.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Created work crew schedules and delegated assignments.
  • Conducted regular inspections of all equipment in the facility to identify any potential problems before they became serious issues.
  • Ensured that safety regulations were followed by employees while performing maintenance tasks.
  • Scheduled and coordinated preventative maintenance activities to ensure equipment reliability.
  • Provided technical support to operations staff as needed to resolve complex problems with equipment or processes.
  • Analyzed current procedures used by technicians during repairs and installations, making recommendations for improvements where applicable.
  • Monitored employee work levels and optimized performance with strategic approaches.
  • Coordinated emergency repairs as needed in order to minimize disruption in production schedules.
  • Identified opportunities for process improvement through data analysis of repair trends.
  • Developed and implemented safety procedures to ensure compliance with OSHA regulations.
  • Prepared budgets for upcoming projects based on estimated labor costs and materials needed.
  • Implemented new technologies that improved overall operational efficiencies within the department.
  • Maintained optimal supply levels to meet expected demands without overreaching budget targets.
  • Delegated daily tasks to employees to manage resources and meet deadlines.
  • Directed maintenance activities to provide continuous supply of heat, electric power or gas required for operations.
  • Communicated with distributors to acquire necessary equipment for projects.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Oversaw workforce schedules and allocated resources in order to achieve project goals.
  • Provided excellent service and attention to customers when face-to-face or through phone conversations.
  • Managed inventory and supplies to ensure materials were available when needed.

Construction Framer

shook and waller construction
Windsor, CA
06.2009 - 01.2015
  • Measured, cut, and installed staircase spindles.
  • Built jigs and fixtures to assist in the production of parts.
  • Laid and stained oak casings and hardwood floors.
  • Constructed forms for concrete pours in accordance with building codes.
  • Studied blueprints, sketches or building plans to prepare project layout and determine dimensions and materials required.
  • Adhered to project blueprints and requirements to deliver quality work.
  • Roughed in door and window frames or subflooring in structures undergoing construction or repair.
  • Assembled furniture using glue, dowels, screws and nails.
  • Cut timber, panels and other wooden materials according to measured dimensions.
  • Installed interior trim work such as baseboards and moldings around windows and doors.
  • Bore boltholes in wood, masonry or concrete using electric or pneumatic drill.
  • Applied design-specific wood and composite trim according to architectural plans and neighborhood regulations.
  • Fashioned frameworks or props using hand tools and wood screws, nails or glue.
  • Worked effectively in team environments to make the workplace more productive.
  • Measured, cut and shaped wood materials to specifications using hand tools, such as saws and chisels.
  • Identified needs of customers promptly and efficiently.
  • Utilized various software and tools to streamline processes and optimize performance.
  • Demonstrated strong problem-solving skills, resolving issues efficiently and effectively.
  • Managed time effectively to ensure tasks were completed on schedule and deadlines were met.
  • Managed household errands and other essential duties.
  • Conducted testing of software and systems to ensure quality and reliability.
  • Provided excellent service and attention to customers when face-to-face or through phone conversations.
  • Conducted system analysis and testing to identify and resolve technical issues or inefficiencies.

Education

High School Diploma -

Casa Grande High School
Petaluma, CA
07-2004

Skills

  • Construction management
  • Blueprint interpretation
  • Safety compliance
  • Project scheduling
  • Inventory control
  • Equipment maintenance
  • Customer service
  • Multitasking Abilities
  • On-site inspections
  • Supply ordering
  • Problem solving
  • Time management
  • Team collaboration
  • Insulation application
  • Retaining walls
  • Formwork design
  • Decision-making
  • Code compliance
  • Punctuality
  • Carpentry basics
  • Problem-solving
  • Construction
  • Painting and finishing
  • Teamwork
  • Reliability
  • Painting and staining
  • Weatherproofing knowledge
  • Door installation
  • Communication skills
  • Active listening
  • Cabinet installation
  • Adaptability and flexibility

Certification

california contractors licence # 1088906

Timeline

General Construction Worker

JMH Construction
03.2025 - Current

Framing Carpenter

Tim Grogan biuldres
04.2018 - 03.2022

Maintenance Supervisor

FPI Management
02.2015 - 03.2018

Construction Framer

shook and waller construction
06.2009 - 01.2015

High School Diploma -

Casa Grande High School
Jose Manuel Hernandez Perez