Summary
Overview
Work History
Education
Skills
Languages
Timeline
Generic

JOSEPH ALVAREZ

Mission,TX

Summary

Organized boilermaker

strengths in working hard and to quickly learn new processes and methods to build more knowledge every day. Motivated to learn and grow within the company and As a person.

Will produce quality and great work at a fast rate, but safely as per company and plant standards. No problems reading and verifying isometric drawings & P&ID’s. No matter my craft or role, I will give my full attention and hard work with whatever I’m tasked with.

QA/QC Mechanical

  • Paying attention to the up most detail of every flange make up or any bolt up on any equipment assigned to me.
  • I will Triple check packages for every detail, to make sure I am signing off the right equipment with the right material type / or orientation, set pressure of anything to the pipe spec given to me.
  • paying attention to the small details has always been a thing of mine. so it just goes hand in hand as a qc tech, reading through isometric drawings and p&id's for exact placement and orientation of items, and reading through pipe specifications provided by the plant to insure the correct material and valves etc.. that will be going on the line or equipment. I always give it my 100% no matter what my job title or task is. So if hired by you , you will be receiving my best and nothing less. Always having the priority to return a quality product back to the plant every time..
  • References:
  • QC
  • jesus rodriguez 956-222-3950
  • Jorge Hernandez (832) 621-8318
  • Alex Nunez (956) 532-7711
  • Boilermaker
  • Juan Garza (956)-340-6940
  • Jesus compean (956) 624-5577
  • Carlos Moreno (956) 788-2061

Overview

6
6
years of professional experience

Work History

Boilermaker

Universal Plant Services
2018.03 - Current
  • Remove and install bundles, inspecting the shell , tube sheet and gasket surfaces
  • Knowledgeable in rigging equipment to where it needs to be
  • Bull rig
  • Fit and install new piping
  • Knowledgeable with hand tools needed for the task at hand
  • Attached the rigging to cranes and hoists, signaling the operators to safely lift heavy frames and plate sections/valves or vessels into place.
  • Removed and repaired or replaced the defective parts found on different pressure vessels using equipment such as torches, power saws and welding equipment.
  • Assembled and analyzed boilers for defects.
  • Maintained compliance with all safety procedures from both client and employer.
  • Inspected and lubricated valves; removed, replaced, or installed components to correct operating deficiencies.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Measured old structural parts or assemblies to determine dimensional requirements of replacements parts.

Boilermaker/pipe Assist

Turn 2
2021.04 - 2021.06
  • Measuring pipe to cut and fit
  • Replace all valve types. From gate, control, globe, check valve
  • Fit and install new piping
  • Knowledgeable with hand tools needed for the task at hand
  • Used scrapers, wire brushes, and cleaning solvents to clean equipment.
  • Threaded pipes using piping machines.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.

Boilermaker

SWAT
2019.10 - 2023.02
  • Or replace vessel parts such as valves or regulators
  • Remove and install bundles, inspecting the exchanger shells
  • Install metal structural components fabricate metal install gaskets between flanges.examen exchangers for weak/cracked points or leaks on shell
  • Knowledgeable in rigging equipment and flagging exchanger components to where it needs to be with crane.
  • Bull rig knowledge
  • install new valves on exchangers
  • Knowledgeable with hand tools needed for the task at hand.
  • Conducted final inspection after completing work to check installation and identify any concerns.
  • Replaced, repaired, configured and tested network equipment.
  • Maintained compliance with all safety procedures from both client and employer.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Used hand signals to notify crane operator to lift components to specific positions.
  • Inspected equipment, exchangers annd valves and materials to identify cause of errors.
  • Assembled and analyzed boilers/exchangers for defects such as tube leaks with hydro test.
  • Inspected, spool pieces, valves; removed, replaced, or installed components to correct operating deficiencies.

Repair

BOILERMAKER, Ohmstede
2018.02 - 2020.04
  • Remove and install bundles, inspecting the exchanger shells
  • examen boilers , pipes , exchangers for any weak points or any leak
  • Knowledgeable in rigging equipment to where it needs to be
  • Bull rigging
  • Knowledgeable with hand tools needed for the task at hand
  • Read blueprints, ISOs, and field drawings to locate reference points for accurate installation
  • Assessed risk and used safe techniques to maneuver components into position.
  • Inspected equipment and structures to determine scope of work (SOW).
  • Identified issues and addressed each immediately with job foreman.
  • Tightened or replaced bolts and gaskets to repair leaks.
  • Used hand signals to notify crane operator to lift components to specific positions.

QA/QC Mechanical

Universal Plant Services
2023.03 - 2023.04
  • analyzed equipment design, and material as per pipe spec at plants request.
  • Drafted assemblies, models, and other technical drawings.
  • Evaluated damage and damage tolerance of new composite material systems.
  • Applied mechanical problem solving skills to develop creative solutions for quality products.
  • Reviewed technical drawings developed by HFS technicians and drafters.
  • Monitor daily processes and quality of installations making sure material of equipment is as per pipe spec for HFS.
  • Assist in inspection and review of hydro tests done on vessels and exchangers.
  • In charge of quality assurance of , exchangers , valves , and PSV’s
  • Helped and assisted in crude unit over critical exchangers.

Quality Control Inspector

Universal Plant Services
2023.04 - 2023.06
  • Inspected incoming and outgoing materials for accuracy and quality.
  • Communicated with production team members about quality issues.
  • Inspected quality of products, taking note of functionality, appearance and other specifications.
  • Performed visual inspections on material going onto the system and matching as per pipe spec is what the plant requests.
  • Package creating and organizing data and flange mapping
  • Work with cwi inspectors to effectively inspect new piping before going into service
  • Collaborated with production staff to establish and meet quality standards
  • Evaluated components and final products against quality standards and manufacturing specifications.

Quality Control Technician

Universal Plant Services
2023.09 - 2023.11
  • Performed thorough inspections of incoming materials and outgoing
  • Maintained quality documentation and records for conformance with relevant standards
  • Was in charge of making sure towers and vessels (drums) were thoroughly inspected by api technicians and processing engineers before returning back to service
  • Made sure tray hardware, demister pads material were going to be going in with the right material as per pipe specifications requested by Phillips 66
  • Completed hydro tests on exchangers tube and shell side, on new tubes and Made sure it was up to what code was requesting for new bundles and the correct median to be tested.
  • Made sure to involve engineers in re packing process to make sure right orientation was being done. To accordance with the manufacturer and Philips done by ups.
  • QC’d and okayed all flange make ups on towers and drums in accordance to pip specifications, making sure gaskets, and bolts were what they were supposed to be.

QA/QC

Universal Plant Services
2023.07 - 2023.08
  • Examined products for imperfections and defects.
  • Followed standard operating procedures for inspections and tests.
  • Recorded inspection and test results on data sheets.
  • Inspected all flange make ups on manways and nozzles on towers for correct gaskets, and bolts according to pipe specifications.
  • Made sure that any new valves installed on the tower had to match specifications that Holly frontier had provided for us to follow.
  • Any new flanges and supports welded onto the new piping had to be correct schedule, material. As well supports matching the details provided by Holly frontier. In their structural detail booklet.
  • Hydro test new welds on piping.

QC Technician

UPS Industrial Services
2024.01 - 2024.03
  • Improved product quality by conducting thorough inspections and implementing corrective actions.
  • Documented quality control procedures and record-keeping practices, ensuring a comprehensive archive of data for future reference and analysis.
  • Adhered to safety and clean area procedures to comply with agency and regulatory mandates.
  • Performed tests and inspections to conform to established standards.
  • bridge the gap in between production and process engineering, operations, and quality assurance to make sure that they are able to inspect vessel components thoroughly before signing off to re install component parts.
  • inspect flange surfaces to insure no damage is on surface before going back into surface.
  • torque verify every bolt up before going back into service to ensure quality meets plant standards and specifications.
  • read isometric drawings to insure correct orientation and placement is correct.

QC Technician

UPS Industrial Services
2024.03 - 2024.04
  • walked down tower and drum vessels to insure isolation points are correct per mapped flanges.
  • reviewed drawings provided by the plant and submitted PMI (positive material identification) to ensure correct packing and hardware going into the tower or drums were what was required per plant specifications.
  • insured every packing level and any hardware installed in vessels were inspected by process engineer every step of the way, making sure nothing was missed to be inspected.
  • ensuring that any packing with orientation was properly place and all internals are placed correctly according to engineers.
  • verified final bolt up and material on all flanges mapped on vessels before turning back a complete tower or drum back to the plant with satisfactory and no leaks. Meeting all requirements per plant.

QC Technician

UPS Industrial Services
2024.04 - 2024.06
  • Streamlined the inspection process through the development of standardized checklists and protocols.
  • reviewed p&id's and isometric drawings for correct orientation for valves and spool pieces.
  • used a caliper for measuring gap on flanges ensuring gap tolerance did not exceed a certain amount for every bolt up depending on pipe size and documented all the measurements and information.
  • ensured every valve installed met the trim requirements for pipe specification required by citgo.
  • hydrotested on pipelines that ran in between the west and east plant.
  • inspected hydrotests on newly welded pipes for quality of weld.
  • insure that all material meets citgo standards as requested per pipe spec.

Education

HIGH SCHOOL DIPLOMA - undefined

Valley view high school
Pharr, Tx

Skills

  • System building
  • Installation safety management
  • Task prioritization
  • Motivation/discipline
  • Parts fabrication
  • Interpret blueprints/P&ID
  • Replace defective parts
  • Equipment Function Testing
  • Maintaining Clean Work Areas
  • Organizational Skills
  • Safe Work Practices
  • Quality Control Analysis
  • Ability to pay attention to high quality work and still produce production at an effective but safe rate

Languages

English
Native or Bilingual
Spanish
Professional Working

Timeline

QC Technician

UPS Industrial Services
2024.04 - 2024.06

QC Technician

UPS Industrial Services
2024.03 - 2024.04

QC Technician

UPS Industrial Services
2024.01 - 2024.03

Quality Control Technician

Universal Plant Services
2023.09 - 2023.11

QA/QC

Universal Plant Services
2023.07 - 2023.08

Quality Control Inspector

Universal Plant Services
2023.04 - 2023.06

QA/QC Mechanical

Universal Plant Services
2023.03 - 2023.04

Boilermaker/pipe Assist

Turn 2
2021.04 - 2021.06

Boilermaker

SWAT
2019.10 - 2023.02

Boilermaker

Universal Plant Services
2018.03 - Current

Repair

BOILERMAKER, Ohmstede
2018.02 - 2020.04

HIGH SCHOOL DIPLOMA - undefined

Valley view high school
JOSEPH ALVAREZ