With over 6 years of construction experience, successfully completing high-rise buildings ranging from 20 to 70 stories. Gained valuable skills in concrete work, crane signaling, demolition and management.
Managed a crew safely and efficiently to ensure each floor was ready for concrete to be poured on time throughout the course of 3, 20-40 story high rise buildings.
Deconstructed materials used in prior floors, stacking them systematically for future use.
Poured concrete for columns, walls, stairs, and slabs using a pump or bucket. (Some jobs reaching 1000+ yards of concrete in a day)
Tower crane signaling daily making sure each trade had the proper materials needed to start/finish construction of each floor in a very fast paced environment.
Loaded/unloaded material from trucks
Tower crane assembly/dismantle
Regularly utilized power tools.
Logged and submitted crew members' time sheets.
Completed 7, 20-70 story high rise buildings.
Carried and laid out various types of materials used to frame each floor.
Safely deconstructed materials used on prior floors and have them organized and stacked ready to be used on following floors when needed. (repeating this cycle weekly)
Poured concrete columns/walls/stairs and slabs
Tower crane assembly/dismantle
OSHA 30 Safety
OSHA 30 Safety