Summary
Overview
Work History
Education
Skills
Timeline
Generic

Joseph Calamari

Hopewell Junction,NY

Summary

Highly-motivated employee with desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills. Dedicated and adaptable with a proactive attitude and the ability to learn quickly. Strong work ethic and effective communication skills. Eager to contribute to a dynamic team and support organizational goals.

Overview

17
17
years of professional experience

Work History

Production Manager

Under the sun improvements
Poughkeepsie, New York
2025.02 - Current
  • Led project planning sessions to map out timelines for feature releases.
  • Identified opportunities for improvement in workflow design and implementation.
  • Established clear communication channels between management and staff members.
  • Coordinated with suppliers to ensure timely delivery of materials and components.
  • Developed performance metrics to track progress against established goals.
  • Monitored the daily operations of the production team, providing guidance and support as needed.
  • Reviewed customer feedback to determine if changes are necessary in order to improve product quality or customer satisfaction levels.
  • Ensured that all safety policies and regulations were followed in accordance with company standards.
  • Developed and implemented production schedules to ensure timely completion of projects.
  • Reviewed production orders, schedules, delivery dates, and inventory levels to determine product availability.
  • Scheduled staff work assignments, rotations and overtime.
  • Monitored employee attendance records and took disciplinary action when appropriate.

Installation Manager

Power Home Remodeling
Trumbull, Connecticut
2014.08 - 2024.01
  • Developed comprehensive reports outlining various aspects of installation processes such as cost estimates, labor hours required.
  • Reviewed and approved invoices from vendors and contractors associated with installations.
  • Assisted in developing detailed plans for each install project, including scheduling timelines and resources needed.
  • Maintained accurate records regarding materials used, labor costs, and other expenses related to installations.
  • Planned, coordinated, and monitored all aspects of installations to ensure customer satisfaction.
  • Communicated regularly with customers throughout the duration of their installation projects to ensure expectations were being met or exceeded.
  • Conducted site visits to evaluate existing conditions and determine any special needs or requirements prior to installation.
  • Ensured compliance with safety regulations during the installation process.
  • Analyzed customer feedback following completed installations, making recommendations for improvement where applicable.
  • Monitored progress of projects on a daily basis and adjusted schedules as necessary to meet deadlines.

Gunners Mate

United States Navy, USN
Norfolk, VA
2008.06 - 2012.06
  • Monitored and secured weapons, ammunition and equipment.
  • Coordinated organizational and intermediate maintenance on guided missile launching systems.
  • Cleaned and maintained weaponry following official procedures for optimum reliability.
  • Trained continuously on weaponry, tactics and maneuvers to maintain mission readiness.
  • Inspected and repaired systems to maximize performance.
  • Completed day-to-day duties accurately and efficiently.
  • Operated equipment and machinery according to safety guidelines.
  • Managed time effectively to ensure tasks were completed on schedule and deadlines were met.
  • Managed inventory and supplies to ensure materials were available when needed.
  • Conducted routine maintenance and repairs on mechanical systems and industrial equipment.
  • Completed routine maintenance and repair.

Education

GED -

John Jay High School
East Fishkill NY

Skills

  • Project management
  • Production scheduling
  • Workflow optimization
  • Performance metrics
  • Inventory management
  • Quality assurance
  • Safety compliance
  • Time management
  • Optimizing production output
  • Logistics
  • OSHA regulations
  • Equipment operation
  • Equipment utilization
  • Maintenance planning

Timeline

Production Manager

Under the sun improvements
2025.02 - Current

Installation Manager

Power Home Remodeling
2014.08 - 2024.01

Gunners Mate

United States Navy, USN
2008.06 - 2012.06

GED -

John Jay High School
Joseph Calamari