Summary
Overview
Work History
Education
Skills
Timeline
Generic

Joseph Martinez

Colorado Springs,CO

Summary

Dedicated and proficient in performing size and load calculations, laying down asphalt, and completing smoothing work. Experienced driver and equipment operator with a strong work ethic and top-notch communication skills developed many years of experience in the field. Detail-oriented professional brings extensive construction background and specialized experience on challenging projects. Smoothly leads team members to meet goals, maximize performance and maintain important safety standards. Knowledgeable about applicable codes and industry best practices.

Overview

25
25
years of professional experience

Work History

Asphalt Laborer

Schmidt Construction Company
Colorado Springs, CO
01.2000 - Current
  • Cleaned up all debris after each job was completed.
  • Utilized wheelbarrows or dump trucks to transport materials from one area to another on the job site.
  • Maintained cleanliness of tools, machinery and work areas.
  • Repaired potholes in existing pavement surfaces.
  • Operated power tools such as jackhammers, tampers and saws.
  • Tamped down soil with hand tamps before applying hot mix asphalt layers.
  • Leveled out uneven surfaces using rakes or shovels prior to laying down new asphalt.
  • Used range of hands tools, power tools and construction equipment to spread gravel and asphalt.
  • Prepared site areas for day's asphalt load.
  • Applied crack fill material using crack seal kettle and wand.
  • Drove and operated curbing machines to extrude concrete or asphalt curbing.

Asphalt Paving Foreman

Schmidt Construction Company
Colorado Springs, CO
01.2000 - Current
  • Monitored progress of work crews to ensure compliance with job requirements.
  • Responded promptly to emergency situations involving equipment malfunction or injury onsite.
  • Maintained accurate records of production rates for labor and material costs associated with each job site.
  • Adhered to all local building codes while performing asphalt paving operations.
  • Provided guidance to workers regarding proper installation techniques for asphalt paving applications.
  • Resolved any issues that arose during the course of a project in a timely manner.
  • Ordered additional materials when needed in order to keep projects running smoothly.
  • Created detailed reports summarizing completed tasks, materials used and hours worked per day.
  • Followed up with customers after completion of jobs to ensure satisfaction with results.
  • Performed layout of asphalt paving jobs using survey stakes, grade rods, levels, string lines and transits.
  • Planned, organized and supervised the paving crew in order to complete projects on time and within budget.
  • Directed personnel in the safe operation of construction equipment such as backhoes, loaders, pavers, rollers and other power tools.
  • Resolved disputes between employees or contractors regarding quality or quantity of work performed.
  • Instructed crew members on proper methods for cleaning up debris from worksites according to company policy.
  • Ensured that proper materials were used in accordance with project plans and specifications.
  • Inspected equipment prior to use and maintained records of maintenance activities.
  • Coordinated trucking needs for each project based on job specifications.
  • Troubleshot problems related to asphalt paving operations including drainage issues, erosion control measures and surface finish concerns.
  • Conducted daily safety meetings with the crew to ensure that all operations were conducted safely and efficiently.
  • Confirmed that final product met customer expectations by conducting a thorough inspection at completion of job.
  • Managed inventory levels at each worksite, ordering supplies when necessary.
  • Assisted newly hired team members by explaining company procedures and safety requirements.
  • Trained employees on work standards and company procedures.
  • Trained and monitored employees to teach daily tasks and improve performance.
  • Kept production team moving forward for progress in daily site operations.
  • Implemented onsite safety protocols and procedures and properly trained team members on prevention measures.
  • Prepared and planned worksites to help jobs run smoothly.
  • Reviewed project blueprints and specifications to determine number of workers needed to complete jobs.
  • Delegated duties to employees based on skillset.
  • Allocated material and labor resources to promote on-time and under-budget project completion.
  • Established and enforced procedures and work standards, promoting team performance and safety.
  • Provided leadership, insight and mentoring to newly hired employees to supply knowledge of various company programs.
  • Monitored project progress to enforce adherence to deadlines and quality standards.
  • Defined and monitored personnel and project schedules to ensure on-time project completion.

Asphalt Supervisor

Schmidt Construction Company
Colorado Springs, CO
01.2000 - Current
  • Resolved conflicts between workers or between workers and management in an effective manner.
  • Implemented cost-saving strategies where appropriate without compromising quality of workmanship.
  • Collaborated with engineering staff in order to develop solutions for difficult problems encountered on the job site.
  • Developed plans for efficient use of resources such as labor, materials, and equipment.
  • Monitored quality control standards during each phase of the project to ensure compliance with applicable codes and regulations.
  • Assisted in the supervision of crew members to ensure that all safety regulations are adhered to.
  • Enforced company policies related to safety procedures, usage of tools and equipment.
  • Provided guidance and training to crew members regarding best practices in asphalt installation and repair techniques.
  • Responded promptly to emergency situations such as hazardous spills or weather-related delays.
  • Evaluated performance levels of crew members on a regular basis in order to identify areas requiring improvement.
  • Communicated regularly with clients to discuss project progress updates or changes in scope of work.
  • Ensured that all tasks are completed efficiently and on time according to project specifications.
  • Reviewed blueprints or drawings prior to beginning any new projects in order to familiarize oneself with design specifications.
  • Obtained specifications and directed work for construction crews.
  • Reported project progress, site problems and labor status to supervisors.
  • Recruited and hired workers, in addition to supervising and monitoring daily performance.

Project Manager

Schmidt Construction Company
Colorado Springs, CO
01.2000 - Current
  • Ensured compliance with applicable laws, regulations, policies and procedures throughout the life cycle of each project.
  • Facilitated resolution of conflicts between team members when necessary.
  • Actively sought out feedback from stakeholders throughout the duration of a project in order to identify areas needing improvement or adjustment.
  • Coordinated resources across multiple departments and teams as needed for successful completion of projects.
  • Created and implemented processes to ensure successful completion of projects.
  • Provided guidance to team members regarding tasks assigned to them.
  • Conducted regular status meetings with internal teams and external partners to track progress against established milestones.
  • Identified risks associated with each project and developed strategies for mitigating those risks.
  • Maintained records of all documents related to each project including specifications, change orders, invoices.
  • Communicated effectively with stakeholders to ensure project goals are met on time and within budget.
  • Built and established strong partnerships with teams and contractors.
  • Forecasted, scheduled and monitored project timelines and personnel performance.
  • Drove continuous improvement of project delivery process by providing strong leadership.
  • Furnished project updates to various stakeholders, informing on strategy, adjustments and progress.
  • Drafted project construction schedule and updated as job progressed.
  • Conducted periodic inspections of job sites for quality and progress.
  • Reviewed project risks and devised proactive strategies to avoid potential roadblocks.
  • Produced thorough, accurate and timely reports of project activities.
  • Identified project needs by reviewing project objectives and schedules.
  • Conferred with project personnel to identify and resolve problems.

Education

High School Diploma -

Mitchell High School
Colorado Springs, CO
05-1985

Skills

  • Asphalt Paving
  • Safety
  • Heavy Equipment Operation
  • Analytical Thinking
  • Attention to Detail
  • Effective Communication
  • Professionalism
  • Reliability

Timeline

Asphalt Laborer

Schmidt Construction Company
01.2000 - Current

Asphalt Paving Foreman

Schmidt Construction Company
01.2000 - Current

Asphalt Supervisor

Schmidt Construction Company
01.2000 - Current

Project Manager

Schmidt Construction Company
01.2000 - Current

High School Diploma -

Mitchell High School
Joseph Martinez