Instrument Fitter
Richard Construction
05.2025 - 07.2025
Replaced old pressure transmitters and ran new tubing from instrument to process.Demo old level capillary and installed new ones made sure correct bolts and gasket were correct and matched documentation. Pressure tested tubing for leaks and made any repairs in old existing tubing as needed. Ran new tubing on Compressor Skids using ½ tubing and correct hand tools and benders. Ran new tray and support as needed.
Instrument Fitter
Turner Industries
12.2024 - 03.2025
Removed transmitters that were needed to be replaced as well as demo tubing, air pipe, steamtrace, dekron. Installed new tray using hand tools and made sure to fabricate and bend using tray benders. As well as fabricated the supports for the tray using a bandsaw and filed it to prevent sharp edges. Installed stands for transmitters as well as mounting them onto the stands. Steamtraced LI's, transmitters, valves using copper tubing of 3/8" with my benders. Located the supply and return in order to run the dekron correctly and for steam to roll over to the tubing having the tie ins. to the tubing. Installed tubing to transmitters made sure it was leveled and having its slope in order for the transmitters to be reading its flow correctly. Installed 3/4" tubing tothe air supply and tieing onto the MOV.
Instrument Technician
MMR GROUP
09.2024 - 11.2024
Used location drawings to locate where instruments to be installed Fabricated instrument stands, installed instruments and verified valves that were furnished by vendor where installed in the correct flow of direction and matched description Commissioned instruments and configured to its spec sheet upon engineering approval Used a Trex communicator to communicate with instruments Pressure tested for leaks and loop checked using hand pump and communicator filled out proper documentation upon selling the loop. Trex, 725, 789 was used to test and verify instrument reading
Instrument Fitter
S&B Constructors New Construction
05.2024 - 08.2024
Tubed up valves to air supply, ran air pipe, did a lot or rack tubing to instruments, panels, etc.. steam traced pipe, installed and fabricated supports and tray used tubing benders to bend tubing. Read ISO to locate where work was to be done and how much tubing will be ran and what material will be needed for the job.
Instrument Fitter
Triad T/A
11.2023 - 03.2024
Disconnected tubing from instrument and valves that were going to be DEMO. Re tubed up everything that was disconnected once it was ready to be put back into place. Ran new tubing in the ones that were damaged or required to be replaced using tubing benders. Used 3/8" tubing on valves and 1/2"tubing for instruments. Demo old air pipe that wasn't being used anymore and ran new one aswell. Worked beside Instrumentation Technician when they needed any tubing disconnected or reconnected when they stroked the valve and did a fail open or fail close test to DCS.Communication with Ops when they seen anything that needed to be re tubed etc..
Instrument Fitter
Turn2 Shutdown
07.2023 - 10.2023
Run 3/8" and 1/2" tubing on valve as well as ran tray with tubing 1/2" rack tubing fabricate tray using hand tools and used my benders to make the Correct bends depending on how the ISO wanted the tubing to be ran. Will run over 120' of production per day with help of a partner. Used basic hand tools square, measuring tape, level, wrenches, file, ratchet, saw saw, band saw...etc fabricated supports in order for Tray to have support once installing. And ran air pipe for air supply to valves.
Instrument Fitter Foreman
ISC New Construction BCEP Exxon Mobil Baytown
12.2022 - 06.2023
Have meetings in the morning to talk about the work scope of the day and talk about safety and how I will make sure my crew will work safely and making sure quality of our work was as done as expected and on time. Will walk out jobs with crew using ISO drawings and P&ID. Made sure we had all the material and tools required for each job and will answer any questions or concerns they will have to make sure everything will go as planned. Made sure everyone was putting in the production that was required on a daily basis as i will meet up with my bosses mid day to give them an update with our schedule.
Instrumentation Fitter
Triad, Texas City, TX
08.2022 - 10.2022
Steamtrace pipes, and used my 1/2" benders to bend tubing and used stainless wire to hold tubing onto pipe. Measured and fabricated supports that we're going to be installed onto beams and used windows clamps as the support onto thebeam. Pulleddekron onto supports and used 3/4' straps to have them holding onto the supports and put a union where the dekron and tubing will tie in and the other will be connected to a supply manifold or condensate which is the return. Used multiple hand tools like a square, tubing cutter, rimmer, measuring tape, wrenches,ratchet, level...etc.
Instrumentation Fitter
United Plant Services, Baytown, TX
05.2022 - 08.2022
TX Month in a half was in Port Arthur and then got transferred to Freeport, Texas. Disconnected tubing from instrument and valves that were going to be DEMO. Re tubed up everything that was disconnected once it was ready to be put back into place. Ran new tubing in the ones that were damaged or required to be replaced using tubing benders. Used 3/8" tubing on valves and 1/2"tubing for instruments. Demo old air pipe that wasn't being used anymore and ran new one aswell. Worked beside Instrumentation Technician when they needed any tubing disconnected or reconnected when they stroked the valve and did a fail open or fail close test to DCS.Communication with Ops when they seen anything that needed to be re tubed etc..
Instrumentation Fitter
All Other 35 Team LLC, Cheyenne, WY
11.2021 - 04.2022
Removed transmitters that were needed to be replaced as well as demo tubing, air pipe, steamtrace, dekron. Installed new tray using hand tools and made sure to fabricate and bend using tray benders. As well as fabricated the supports for the tray using a bandsaw and filed it to prevent sharp edges. Installed stands for transmitters as well as mounting them onto the stands. Steamtraced LI's, transmitters, valves using copper tubing of 3/8" with my benders. Located the supply and return in order to run the dekron correctly and for steam to roll over to the tubing having the tie ins. to the tubing. Installed tubing to transmitters made sure it was leveled and having its slope in order for the transmitters to be reading its flow correctly. Installed 3/4" tubing tothe air supply and tieing onto the MOV. Tools that were used throughout the job were my tubing benders, rimmer, tubing cutter, dekron cutter, no-go gauge, wrenches, pipe wrench, 4-1s. Ratchet used mainly 7/16 and 9/16. File.etc.
Instrument Fitter
All Other McDermott, Houston, TX
07.2021 - 10.2021
New Construction- tubed up valves to air supply, ran air pipe, did a lot or rack tubing to instruments, panels, etc.. steam traced pipe, installed and fabricated supports and tray used tubing benders to bend tubing. Read ISO to locate where work was to be done and how much tubing will be ran and what material will be needed for the job.
Instrument Fitter
Contech Control Services Inc
12.2020 - 06.2021
Install tubing, tray, supports, air pipe, bend tubing tray, read PI&Ds, location drawings, installation details. Ran rack tubing of 1/2" using benders and tray cut the tray and used and bend tray at itsspecific radius. Steam traced valves, transmitters, pipe. Connected the tie ins with copper tubing and connected the other end to the specific manifold. Used multiple material that was required throughout jobs scopes and used my hand tools and equipment that involved with finishing job safely.
Instrument Fitter
Ref-Chem LP
01.2020 - 11.2020
Ran rack tubing, cut tray using band saw and filed edges to eliminate sharp edges. Installed instruments and placed stands for them made sure all bolts were tight using my hand tools made m sure everything was correctly placed and leveled. Read ISO drawing and P&IDs to locate the location of specific equipment. Ran air pipe 1/2" used threading machine and made sure they were properly installed with no damage or kinks as it was aluminum. Cut struts to support tray. Used my tubing benders to bend tubing did offsets, 90s, 45, made sure my tubing had slope where required.
instrument fitter
Precision Instrument and Equipment Repairers, All Other houston control
11.2019 - 12.2019
Install instruments, set up stands for the transmitters to be setup fabricated tray for rack tubing as well as fabricating supports and got all the materials needed to be put all together. Used my 1/2" benders to bend tubing did offsets on tubing used clips and installed tubing onto tray. Installed a support stands onto grading then placed the tray and used a spring nut to hold tray onto support and slopped the tray at the end as requested from ISO. Walk down job scopes and pulled permit as to what the job was going to involve doing and needing.
Instrument Fitter, Plumbers, Pipefitters, and Steamfitters
Lauren Engineers-Constructors
08.2019 - 10.2019
I installed instruments, tray tubing, mounted stand, run air pipe, supports, read details and PI&DS. Fabricated tray and supports using basic hand tools like square, measure tape, file. Used band saw to cut the following material, made sure to inspect machine and tools before use if any questioning them or concern will report to supervisor and get further help and solve any issue.Once tray was fabricated I would then bend the following tubing that will be installed onto tray and used clips to be put together and stay onto tray after. Installed the tray onto the supports and connected the tie ins to it's following end
Instrumentation
Austin Industrial
04.2019 - 06.2019
Installed tubing & tray. Did supports, stands, mounted new devices, air pipe and dekcron. Used my hand tools and benders to bend tubing and connect one another.
instrument fitter
ConTech electric
12.2018 - 01.2019
Install tubing, tray. supports, stands ,mount new devices, air pipe, deckron helped pull cable with electricians when work was slow. Read ISO get material that was needed..
Instrument Fitter
Houston Control Inc.
06.2018 - 11.2018
Installed instruments, tray supports and air pipe in a refiner. Used PPE with all projects and followed rules and regulations according to company and OSHA policy.
instrument fitter
turnkey
04.2018 - 05.2018
Install instruments trav supports .air pipe
INSTRUMENT FITTER
S&B ENGINEERS
01.2018 - 03.2018
Fab tray for deckoron, install air pipe, bend tubing tray ,supports, install new instruments
Fab tray ,supports, install and bend tubing install instruments
Instrument Fitter lead man
Turner Industries
09.2015 - 11.2015
Run tubing, tray, install and fabricate tray supports , bending tubing, read blue prints,details
Instrument Fitter foreman
Austin Co
03.2015 - 07.2015
Run tubing , install instruments
Instrumentation
S&B Engineers
11.2014 - 03.2015
Run different size of tubing tray, supports, instruments
Instrument Fitter
Houston Control Inc
09.2014 - 10.2014
Installed air pipe to controlled valves and heat trace panels. Installed various instruments according to installation details. Ran tubing and air pipes.
Instrument Fitter
Turner Industries
03.2014 - 08.2014
Installed air pipe , tray ,supports ,stands ,tubing
Instrument Fitter Foreman
S&B Engineering
06.2013 - 02.2014
Supervised all fitters to perform the job of best way. read blue way. read blue prints. Performed P&IDs, location drawings, instrument details. Gave safety meeting every day to my crew. Worked on my tools to install instruments in order for the system to work.
Instrument Fitter
Houston Control .co
04.2013 - 05.2013
Fab supports ,tray, bend tubing.
Instrument Fitter Lead Man
S&B Constructors
02.2013 - 03.2013
Lead the others fitters to do safe and quality work. bend and install tubing
Foreman
S & B
08.2012 - 12.2012
Supervised instrument fitters to perform the job quality and safe way. Reported to may gf foreman all production of end day. Installed air pipe to controlled valves and heat trace panels. Installed various instruments according to installation details. Ran tubing and air pipes.
Instrument Fitter
Contech Control Services
09.2011 - 04.2012
Installed air pipe to controlled valves and heat trace panels. Installed various instruments according to installation details. Ran tubing and air pipes.
Instrument Fitter
MMR
03.2011 - 08.2011
Laid out, assembled, installed and maintained pipe systems, pipe supports, and related hydraulic and pneumatic equipment for steam, hot water, heating, cooling, lubricating, sprinkling, and industrial production and processing systems. Installed air pipe to controlled valves and heat trace panels. Installed various instruments according to installation details. Ran tubing and air pipes.
Instrument Fitter
S&B Engineering
11.2010 - 03.2011
Installed air pipe
Intrument Fitter
Fluor Daniel
07.2010 - 11.2010
Run tubing for oil compressor 1"1112" 1112" Tubing
Instrument Fitter
CB&I
09.2009 - 06.2010
Installed air pipe to controlled valves and heat trace panels. Installed various instruments according to installation details. Ran tubing and air pipes
Instrument Fitter
Austin Industrial
05.2009 - 08.2009
Run air pipe , install instruments cut and fabricate and install tray and suppers and run tubing. Read Iso and P&ID to locate and see the work scope and production for the day.
Instrument Fitter
Bay LTD
01.2009 - 04.2009
Run air pipe , install instruments cut and fabricate and install tray and suppers and run tubing. Read Iso and P&ID to locate and see the work scope and production for the day.
Instrument Fitter
McBride Electrical
10.2008 - 12.2008
Help electricians with conduit install and run tubing
Instrument Fitter
Rabalais Constructors
07.2008 - 10.2008
Install tray and tubing
Instrument Fitter
JV Industrial
05.2008 - 06.2008
Demo old tray, remove damage devices, re run tubing , intall new equipment
Instrument Fitter
Jacobs
03.2008 - 04.2008
Install tubing, demo tubing, tray, air pipe, supports, re installed with new material and used my hand tools, scaffold, step ladder…
Instrument Fitter
Davis International
01.2008 - 02.2008
Disconnected and reconnected tubing. Ran new tubing to ones that were damaged or requested from plant to change. Read P&ID to locate jobs and grabbed the required hand tools like wrenches to take union apart and tubing cutters to cut tubing and benders to bend.
Instrument Fitter
TIC
01.2006 - 12.2007
Bend hydraulic tubing for compressor stations.
Skills
Responsible
Team Player
Multi-Tasker
Commutative
Problem Solving
Motivational
Adaptability
Certification
NCCER Plus HANDS-On Instrument Fitter
NCCER Instrument Fitter
NCCER Instrument Technician
20+ years of Instrumentation Experience
Timeline
Instrument Fitter
Richard Construction
05.2025 - 07.2025
Instrument Fitter
Turner Industries
12.2024 - 03.2025
Instrument Technician
MMR GROUP
09.2024 - 11.2024
Instrument Fitter
S&B Constructors New Construction
05.2024 - 08.2024
Instrument Fitter
Triad T/A
11.2023 - 03.2024
Instrument Fitter
Turn2 Shutdown
07.2023 - 10.2023
Instrument Fitter Foreman
ISC New Construction BCEP Exxon Mobil Baytown
12.2022 - 06.2023
Instrumentation Fitter
Triad, Texas City, TX
08.2022 - 10.2022
Instrumentation Fitter
United Plant Services, Baytown, TX
05.2022 - 08.2022
Instrumentation Fitter
All Other 35 Team LLC, Cheyenne, WY
11.2021 - 04.2022
Instrument Fitter
All Other McDermott, Houston, TX
07.2021 - 10.2021
Instrument Fitter
Contech Control Services Inc
12.2020 - 06.2021
Instrument Fitter
Ref-Chem LP
01.2020 - 11.2020
instrument fitter
Precision Instrument and Equipment Repairers, All Other houston control
11.2019 - 12.2019
Instrument Fitter, Plumbers, Pipefitters, and Steamfitters