Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals.
Overview
16
16
years of professional experience
1
1
Certification
Work History
Supervisor
Bennett Sheet Metal Works
11.2008 - 08.2017
Supervised all demolition/installation of metal or PVC and all modified materials
Assigned work to individuals and provides technical direction and/or in accomplishing difficult work steps and processes
Resolved conflicts among team members promptly, maintaining a harmonious working environment conducive to productivity.
Demonstrated commitment to the organization''s core values, leading by example and fostering a culture of excellence.
Identified operational inefficiencies and implemented corrective measures to increase effectiveness.
Continually accomplished pre-planning of complete roofing systems, additional projects as assigned prior to scheduled repair of end item requirements
Systematically analyzed workloads and requirements to plan labor of work, reduce costs to customers and employer by improving effectiveness
Provided all on-site inspections and quality control measures for all work performed in accordance with the Performance Work Statement
Managed all work control documents, manual documents, daily checklists and end-of-day reports into an automated system
Responsible for the control and inventory of all tools, tooling and equipment through proper storage in game boxes, tool boxes or bins
Established, developed and maintained effective working relationships with organizations such as Engineering, Planning, Scheduling, Material Control and Quality Assurance personnel
Implemented safety protocols to minimize workplace accidents and maintain compliance with industry standards.
Maintained work standards such as daily production count, man-hour usage, time and attendance
Supervised/Trained employees to Army Corps of Engineer standard, meeting safety requirements in using heavy machinery such as Lull, Cranes, Scissor/Snorkel/Aerial Lifts
Daily inspections on all metal components for cracks, breaks, holes, bulges, dents and loose or missing fasteners
Foreman
Blue Ribbon Roofing and Construction
06.2005 - 10.2008
Installed roofing products on both residential and commercial properties consisting of asphalt, tile, slate, shingles, roll roofing and metal panels
Repaired damaged surfaces on interior and exterior of buildings and other structures by removing old paint, filling cracks, applying fillers and base coats
Installed custom copper roof systems utilizing mathematics, layout and fabrication
Performed leak inspections and carpentry work due to damaged structures
Built room additions including concrete slabs, walls, trusses, windows, doors, insulations, skylights, siding, flooring, sheetrock, and complete roof systems
Maintained daily job efficiency reports to include time keeping, daily critical path requirements and forecast/acceptance of material delivery
Controlled daily operations and work assignments of supporting tasks such as fork lift and back hoe leasing and operational requirements
Initiates various actions to preclude parts and material shortage situations such as review of back order listings on a daily basis and recommending actions to meet the required completion date
Informs with recommendations to upper level management of the need for a revised work schedule to meet customer demands and/or schedule changes due to weather, material constraints and/or any other delays in production
Safety is always paramount; maintained all Occupational Safety and Health Administration requirements to include maintaining daily OSHA Log
Served as Safety Monitor and Point of Contact for any safety concerns
Tools used include: (pneumatic) nail guns, drills, basic hand tools, sanders, caulk guns, trials, painting equipment, skill saw, reciprocating saw, and miter saw
Apprentice
Custom Metals
06.2001 - 05.2005
Performed fabrication and installation of sheet metal assemblies and components
Performed repairs on shop equipment and machinery while referring to technical data, blue prints and drawings
Removed and replaced damaged components such as gaskets, cables/pulleys and mechanical parts within maintenance/fabrication facility
Repaired or manufactured metal tubing and conduit in accordance with drawings and specifications
Performed corrosion control methods on daily basis
Assisted journeyman mechanics in higher level maintenance and repairs while in OJT status