Accomplished electrical inspector with a robust background spanning 15 years of total electrical experience, with a dedicated focus on the oil and gas sector for the past 7 years. Leveraging extensive expertise in overseeing diverse electrical installations, I have consistently ensured compliance with rigorous industry standards, regulatory mandates, and project specifications. My career has been defined by a percise approach to conducting comprehensive inspections, adeptly identifying and addressing potential issues to uphold the safety, quality, and efficiency of electrical systems.
Throughout my occupation, I have honed my ability to collaborate closely with contractors, project teams, and regulatory authorities, facilitating seamless communication and alignment of objectives. By effectively navigating complex project requirements and leveraging strong analytical skills, attention to detail, and communication abilities, I have played a pivotal role in the successful completion of numerous projects within the oil and gas industry.
With a proven track record of delivering results while adhering to strict deadlines and budgets, I am committed to leveraging my wealth of experience and expertise in electrical inspection to drive excellence and contribute to the continued success of projects within the oil and gas sector.
Scotts Booster Phase 7
Inspected the installation of a 3-phase separator, new compressor skid, and the establishment of a new power distribution area.
inspected the install of a new Dehydration (Dehy) Building, overseeing the installation of electrical systems to ensure compliance with industry standards and project specifications.
Lonetree Meter Upgrade
Conducted thorough inspections of contractor-performed removal of two existing meter runs and installation of two new upsized meters, ensuring adherence to project specifications and safety standards. Verified the removal of existing wiring and supervised the install of new wire for three meters, ensuring proper installation techniques and compliance with regulatory guidelines.
Grayrocks Pump Building
Conducted comprehensive inspections of contractor-installed new buildings over existing pumps, ensuring seamless integration and adherence to project specifications. Verified the installation of various electrical equipment, including lights, gas detectors, fire eyes, and Emergency Shutdown (ESD) buttons, to guarantee functionality and compliance with regulatory requirements.
Meeker Meter Reversal
Worked with contractors to coordinate the removal of existing meter and installation of new piping to reverse the flow of the meter. Assisted in the addition of two new control valves, ensuring seamless integration with existing electrical systems and functionality.
Cheyenne Hub Units 5 and 6
Conducted detailed inspections of electrical installations for 2 Cat 3616 compressors and associated aerial compressors.
Verified the correct installation of electrical components, including wiring, controls, and safety devices, in accordance with specifications and regulatory requirements.
9 LSPI DRA skids
Inspected the electrical install of 9 DRA skids from Sterling Colorado, to McPhersons Kansas
Buckingham pump station modifications
Worked with electrical contractor to finish the install of 1 4160 pump and new PDC. Collaborated closely with OTS to ensure thorough completion and finalization of commissioning documentation. Provided support to Tallgrass Automation, addressing any requirements or challenges during commissioning activities.
Grayrocks Pump Station
Worked with contractor to watch the install of three 6000hp units fed with 6.6kv power. Also inspected various electrical components, including the installation of a PDC building equipped with three VFDs, main switchgear, and a 480v UPS system. Experienced in overseeing the installation of critical infrastructure such as a re-closer and transformer, managing the transformation of power from 34.5kv to 6.6kv. Collaborated closely with OTS to ensure thorough completion and finalization of commissioning documentation. Provided support to Tallgrass Automation, addressing any requirements or challenges during commissioning activities.
PEGE Pipeline from Guernsey, WY to Buckingham,CO
Cheyenne Hub Enhancement
Worked on the Cheyenne compressor station Phase 2 and 3. Installing 4 cat 3616 and areial compressors. Along with cooling fans for each one. Installing of Multiple valve sets for flow control, installing of 10 PCV skids. Installing of 5 filter separators.
Summit TPC Project
Worked in Hereford Colorado on the summit Trailblazer meter station
Hereford Pipeline
Worked on Hereford meter station, Pawnee meter station and the hereford pipeline in Hereford CO
Glenn Rock Compressor Station
Worked on inspection team on installing a cat 3608 at Glenn Rock compressor station in Glenn Rock WY.
Iron Horse Pipeline
Worked with the inspection team on Iron Horse Pipeline in Douglas WY.
Segment 55 Depth of cover
Worked on Depth of cover for segment 55 in Wheatland WY
Natoma Pump Station
Worked on inspection team for the install of 4 truck bays and a booster pump at natoma pump station in natoma KS.
Rex Zone 3 Capacity Enhancement
Allen Bradley ladder logic programming.