Electrician with 20 years of experience. Knowledgeable at electrical installations and maintenance in industrial, commercial and residential. Experience in troubleshooting and testing electrical equipment.
Work History
Electrician
3 Years 7 Months
Reds Electric | Hesperia, California | 04.2023 - Current
Installed and worked extensively on three phase 277/480 volt power distribution systems.
Troubleshoot and test electrical circuits thoroughly.
• Install conduit, cable tray and wiring for power, control and lighting
Completed medium voltage terminations.
Installed and terminated PLC and MCC accordance to prints.
Perform loop checks and test equipment thoroughly.
Electrician
7 Months
MMR Group Inc. | Hayden, AZ | 08.2022 - 03.2023
• Installed three phase 277/480 volt power distribution systems
• Conducted medium voltage terminations with precision and care.
• Installed and terminated PLC and MCC in accordance with prints.
• Install and terminate PLC and MCC accordance to prints
Troubleshoot electrical circuits and verify performance.
Perform loop checks and test equipment.
ELECTRICIAN JOURNEYMAN
1 Year 1 Month
BERGELECTRIC CORPORATION | RANCHO CORDOVA, CA | 07.2021 - 08.2022
Installed conduit and wiring for power, control, and lighting systems.
Installed conduit and wiring for power, control and lighting.
Troubleshooting electrical circuits during installation and testing phases.
Conduct loop checks and terminate distribution panels safely.
ELECTRICIAN JOURNEYMAN
1 Year 6 Months
MMR CONSTRUCTORS INC. | BATON ROUGE, LA | 01.2020 - 07.2021
Inspect, troubleshoot, and test electrical circuits safely.
Installed and maintained three phase 277/480 volt power distribution systems
Installed conduit, cable tray, and wiring for power, control, and lighting systems.
Performed medium voltage terminations
Installed and terminated PLC and MCC in accordance with prints.
Complete loop checks and verify equipment functionality.
ELECTRICIAN JOURNEYMAN
2 Years 5 Months
METCALF CONSTRUCTION | NORTH VERNON, IN | 08.2017 - 01.2020
Installed and maintained three phase 277/480 volt power distribution systems
Performed medium voltage terminations during field installations.
Installed and terminated PLC and MCC in accordance with prints.
Conducted loop checks, tested equipment, and supported commissioning crew.
Loop checks and test equipment with commissioning crew
ELECTRICIAN JOURNEYMAN
3 Years 4 Months
OMEGA ELECTRIC | BRAWLEY, CA | 04.2014 - 08.2017
Interpreted blueprints, schematics and drawings to perform the job task
Troubleshot and tested electrical circuits.
Supported three-phase, 277/480 volt power distribution systems.
Installed conduit, cable tray and wiring for power, control and lighting.
Interpreted blueprints, schematics and drawings to perform the job task
Install medium voltage terminations safely and accurately.
CONSTRUCTION ELECTRICIAN
6 Months
MMR CONSTRUCTORS INC. | BATON ROUGE, LA | 10.2013 - 04.2014
Installed conduit, cable tray and wiring for power, control and lighting.
Interpreted blue prints, schematics and drawings to complete job.
Conducted loop checks and verified test equipment readiness.
CONSTRUCTION ELECTRICIAN
1 Year 8 Months
OMEGA ELECTRIC | BRAWLEY, CA | 12.2011 - 08.2013
Installed electrical and mechanical equipment per National Electrical Code.
Verify PLC terminations against prints before commissioning equipment.
Diagnose circuit faults in motor, control, and lighting systems.