Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Jose Ricardo Sanchez

2207 W Tokay St.,CA

Summary

Capable Construction Laborer experienced in operating and maintaining equipment to support job site needs, as well as HVAC performance. Physically strong and fit with good time management abilities and dexterity to support skilled work.

Overview

10
10
years of professional experience
1
1
Certification

Work History

General Construction Worker/ HVAC Technician

Tiller Constructors
02.2019 - Current

Construction site: Palm Springs Desert Regional Medical Center | John F. Kennedy Memorial Hospital

  • Performing preventative maintenance (HVAC)
  • Performing repairs on units (HVAC)
  • Installing replacement parts (HVAC)
  • Plastic barrier for infections control
  • Paint, drywall, concrete, demolition
  • Remodeling hospital interior
  • Supervising contractors
  • Electrician skills & plumbing skills
  • Experience in assembling furniture

Solar Technician

People Ready Staffing: swinerton renewable energy
05.2017 - 02.2018
  • forklift operator staging panel in to array
  • racking
  • panel installation
  • labor construction

Solar Technician

TradeForce Staffing/Titan Renewables
09.2016 - 05.2017
  • solar maintenance tech
  • lam torquing
  • Racking
  • quality control
  • panel installation
  • logistics lead
  • staging with a 5k telehandler.

Solar Technician

Eastridge Workforce Solutions
10.2015 - 01.2016
  • post pounder operator
  • kistir operation
  • racking
  • QC
  • worked in a post pounding crew.

Solar Technician

Premier Building Group
11.2013 - 04.2014
  • operated Forklift
  • spotter for big machinery
  • worked in the dirt crew backfilling trenches

General Construction Worker

Labor Ready Southwest INC
10.2013 - 11.2013
  • Construction cleanup
  • hay baling compress
  • general labor.

Education

High School Diploma -

Lodi High School
Lodi, CA

Skills

  • Hand and Power Tool Operation
  • Safety-First Mentality
  • Forklift Certification and Experience
  • Reading electrical diagrams
  • Knowledge on HVAC operations
  • Carpentry
  • Piping for boiler systems
  • Soldering and brazing
  • Electrical experienced in bending conduit
  • Replacing outlets/ receptacles & light switches
  • General mechanics
  • Replacing barrings, shafts, and blower motors
  • Ability to learn quickly
  • Bilingual (English/Spanish)

Certification

  • OSHA 10 CERTIFICATION, forklift powered industrial truck

Timeline

General Construction Worker/ HVAC Technician

Tiller Constructors
02.2019 - Current

Solar Technician

People Ready Staffing: swinerton renewable energy
05.2017 - 02.2018

Solar Technician

TradeForce Staffing/Titan Renewables
09.2016 - 05.2017

Solar Technician

Eastridge Workforce Solutions
10.2015 - 01.2016

Solar Technician

Premier Building Group
11.2013 - 04.2014

General Construction Worker

Labor Ready Southwest INC
10.2013 - 11.2013

High School Diploma -

Lodi High School
Jose Ricardo Sanchez