Summary
Overview
Work History
Education
Skills
Timeline
Generic

Joshua Garner

Fairfield

Summary

With a proven track record at Universal Plant Services, I've led teams to complete jobs efficiently, under budget, and ahead of schedule. Expert in electrical installation and adept at workforce management, I excel in mentoring electricians and streamlining processes, significantly enhancing on-site productivity and safety.`

Overview

6
6
years of professional experience

Work History

Electrical General Foreman

Universal Plant Services
07.2024 - Current
  • Delivered successful jobs on time and within budget through diligent planning, coordination, and execution of tasks.
  • Mentored electricians to enhance their skills, knowledge, and performance on the job site.
  • Collaborated with engineering during scope changes to give input for the most efficient option to prevent process equipment down time.
  • Streamlined processes for increased efficiency by introducing new ideas and spreadsheets to the client.
  • Maintaining a set schedule in less time than the client's expectations.


Electrical Foreman

Universal Plant Services
01.2024 - 06.2024
  • Supervised crew of electricians and maintained safe, efficient and structured work environment.
  • Evaluated job site and project specifications to determine supply needs, coordinating availability of equipment and materials.
  • Supported company objectives by consistently meeting deadlines without compromising quality or safety standards.
  • Read complex schematics and blueprints to coordinate the installation and repair of electrical systems.


Electrician

Universal Plant Services
05.2023 - 01.2024
  • Worked from ladders, scaffolds, and lifts to install, maintain, or repair electrical wiring equipment. Such as but not limited to: motors, motor control centers, process unit lighting, motor controlled valves, compressors, generators, temporary power ranging from 50-1000 amp services.
  • Installation of electrical raceways, such as but not limited to: cable tray, duct banks, conduit (EMT, Rigid, plasti-bond, PVC).
  • Installed, maintained, repaired, and tested equipment for electricity generation and utilization.
  • Planned layout and installation of electrical wiring, equipment, based on specifications and applicable code.

I/Electrician

Norrell Construction
01.2021 - 05.2023


  • Troubleshooting and repair on Motors, motor control centers, process unit lighting, motor controlled valves, compressors, generators, temporary power ranging from 50-1000 amp services.
  • Installation of electrical raceways, such as but not limited to: cable tray, duct banks, conduit (EMT, Rigid, plasti-bond, PVC).
  • Installed and wired electrical transformers, service panels, and circuit breakers.
  • Installation of conduit wiring and tubing for instrumentation in process units.
  • Planned layout and installation of electrical wiring, equipment, and fixtures based on specifications and applicable code.
  • Performing tasks from scaffolds, manlift, towers, ladders at heights ranging from 3'-350'.

Electrical Helper

Wood Group
10.2018 - 01.2021


  • Maintaining a positive attitude and a strong initiative to learn the skills needed to move up in trade.
  • Assisting in the installation of electrical raceways, and electrical systems in existing structures and new constructions.
  • Maintaining a clean workspace for co-workers while performing assigned tasks.

Education

High School Diploma -

Penn Foster Highschool
04-2018

Skills

  • Electrical installation
  • Electrical troubleshooting
  • Job planning
  • Bending tubing and conduit
  • Managing a workforce
  • Maintaining a safe work environment

Timeline

Electrical General Foreman

Universal Plant Services
07.2024 - Current

Electrical Foreman

Universal Plant Services
01.2024 - 06.2024

Electrician

Universal Plant Services
05.2023 - 01.2024

I/Electrician

Norrell Construction
01.2021 - 05.2023

Electrical Helper

Wood Group
10.2018 - 01.2021

High School Diploma -

Penn Foster Highschool
Joshua Garner