Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

Joshua Guyer

Dover,PA

Summary

At Susquehanna Automatic Sprinklers, INC., I spearheaded pipefitting projects, slashing timelines through adept team and schedule management. My expertise in blueprint interpretation and welding, coupled with a knack for fostering team skills and safety compliance, significantly boosted project efficiency and client satisfaction. Dedicated Pipefitter with background in job coordination and worksite setup. Knowledgeable in safety processes, regulations and pipe selection. Offering successful career history comprising more than 9 years. Highly trained Pipefitter offering excellent skills in managing teams and running and cutting steel,copper and CPVC. Pursuing a similar position where a well-qualified individual with an understanding of assembling and installing pipe systems is highly sought. Detail-oriented team player with strong organizational skills. Ability to handle multiple projects simultaneously with a high degree of accuracy. To seek and maintain full-time position that offers professional challenges utilizing interpersonal skills, excellent time management and problem-solving skills. Organized and dependable candidate successful at managing multiple priorities with a positive attitude. Willingness to take on added responsibilities to meet team goals. Results-driven professional leads, motivates and collaborates with teams of mechanics. Experienced in troubleshooting and diagnosing repair issues. Committed to implementing best practices and standards to deliver customer satisfaction.

Overview

9
9
years of professional experience
1
1
Certification

Work History

Pipe Fitter Foreman

Susquehanna Automatic Sprinklers, INC.
2015.06 - Current
  • Reduced project timeline for pipefitting projects by effectively managing team assignments and schedules.
  • Assisted in training new team members on company policies, procedures, and pipe fitting techniques to improve overall workforce skill level.
  • Performed tests to check quality of pipe and piping systems and make adjustments as necessary.
  • Replaced faulty parts and repaired structural damages to pipes and related components.
  • Threaded pipes using piping machines.
  • Inspected and tested existing pipe systems to identify system defects and malfunctions.
  • Appropriately fitted pipes by identifying dimensions, sizes, and shapes needed to replace faulty pipes.
  • Operated drill motors, grinders, chop saws, hack saws, and burning torches to perform tasks.
  • Cut and drilled holes in walls to permit passage of pipes.
  • Measured, threaded, and cut materials to correct angles.
  • Planned pipe system layout, installation and repair according to specifications.
  • Filled pipe systems with water and air to determine location of leaks.
  • Eliminated risks by correctly identifying potential safety hazards.
  • Used clamps and brackets to attach pipes to walls, structures and fixtures.
  • Read and interpreted blueprints and schematics to determine locations, quantities, and sizes of materials required.
  • Fabricated piping pieces and components in line with design specifications for each system.
  • Interpreted blueprints to determine locations, quantities, and sizes of materials required.
  • Secured rising mains and boiler piping to structural supports in new construction and remodeling projects.
  • Managed emergency service calls with professionalism and efficiency, providing prompt assistance to clients experiencing sprinkler system failures or malfunctions.
  • Participated in safety meetings and maintained adherence to established protocols, ensuring a safe working environment for all team members.
  • Enhanced system efficiency by performing routine maintenance on sprinkler pipes, valves, and other components.
  • Upheld high standards for cleanliness on job sites by removing debris after completion of work activities.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Contributed to company reputation as a reliable service provider through consistent communication with clients regarding project updates, progress reports, or any changes affecting timelines or budgets.
  • Streamlined inventory management by maintaining an organized stock of necessary tools, materials, and equipment for pipe fitting tasks.
  • Boosted customer satisfaction rates by delivering high-quality workmanship in all aspects of sprinkler system installation and repair.
  • Collaborated with project managers to develop accurate estimates for labor hours and material required for upcoming projects.
  • Ensured compliance with local building codes and fire regulations through meticulous installation of new sprinkler systems.
  • Reduced response time for emergency repairs with proactive identification of system issues and prompt scheduling of service calls.
  • Installed and maintained industrial piping fittings, valves, flanges and clamps to complete systems setup.
  • Read and interpreted blueprints, diagrams and other technical drawings to determine best installation methods.
  • Fabricated pipe sections and components to specification using cutting, threading and welding equipment.
  • Installed new systems and connected piping to existing components by welding, bolting and threading.
  • Followed safe work practices, which included fall protection and personal protective equipment.
  • Fabricated and installed screw pipe, socket weld pipe, and stainless steel tubing.
  • Performed preventive maintenance to clean, adjust and lubricate piping systems and parts.
  • Connected piping systems to fire pumps, jockey pumps and auxillary equipment to complete installations.
  • Calibrated piping systems and components to optimize performance.
  • Monitored pipeline pressure and flow rates to facilitate safe and efficient operation.
  • Trained new employees to learn new systems, apply best practices and comply with protocols and regulations.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Checked equipment to determine if maintenance was required.

Education

High School Diploma -

Dover Area High School
06.2015

Skills

  • Flange Installation
  • Pipe threading
  • Pipe welding
  • Pipe Insulation
  • Pipe Hangers
  • Blueprint Interpretation
  • Pneumatic Systems
  • Hand and power tools
  • Worksite safety
  • Installation and maintenance
  • Pipefitting
  • Pressure testing
  • Safety Procedures
  • Material prepping
  • Systems troubleshooting
  • Material Cutting
  • Welding
  • Piping specifications
  • Blueprint Analysis
  • Equipment testing
  • Emergency Repairs
  • Project Management
  • Commercial pipefitting
  • Building code regulations
  • Blueprints and Specifications
  • Material Selection
  • Attention to Detail
  • Hand and Power Tool Operation
  • Adaptability and Flexibility
  • Job Prioritizing
  • Decision-Making
  • Heavy Lifting
  • Machinery Operations
  • Employee Safety Trainin
  • Safety Compliance
  • Relationship Building
  • Hazard Monitoring and Management

Certification

aerial lift

fork lift

Timeline

Pipe Fitter Foreman

Susquehanna Automatic Sprinklers, INC.
2015.06 - Current

High School Diploma -

Dover Area High School

aerial lift

fork lift

Joshua Guyer