Experienced construction professional with over 20 years of expertise in piping. Strong industry and technical knowledge, adept at managing multiple construction trades. Skilled in interpreting design parameters, isometrics, plot plans, and various drawings. Highly organized with excellent supervisory and time-management abilities. Consistently meets project budgets and timelines.
Overview
19
19
years of professional experience
1
1
Certification
Work History
Supervisor
B&E Resources
07.2024 - Current
Ensure that all safety regulations are followed at the project site
Conducting Piping/Mechanical reviews of all project packages prior transmitting to client
Maintaining strong relationships with clients
Organizing and coordinating construction activities with accordance to schedules and timelines
Coordinating with client and Plant Personnel to make sure the client’s input and job requirements are addressed and implemented consistently.
Pipefitter
Ohmstede Industrial Services
03.2024 - 07.2024
Demo damaged tubes and install new tubes in boiler #37 at Motiva
Fabricate and build piping spools per isometric drawings
Rig and hang piping spools in pipe rack in the SRU
Safely completed jobs on time and ahead of schedule.
Planner, Coordinator
WestPro LLC
08.2022 - 03.2024
Develop and define project step-outs in Vtep
Plan, coordinate and monitor activities of assigned projects to develop and implement procedures, processes and systems
Evaluate and analyze risks and issues compromising project results and develop plans to mitigate them
Attend core team meetings and ensure to convey required project data and information to project teams in the field
Gather actual data, update project schedule and develop reliable schedule forecast
Prepare and send out daily project reports to management.
Superintendent, Piping Coordinator, QC Manager, General Foreman, Foreman
Ohmstede Industrial Services
11.2019 - 08.2022
Managed, executed, and planned multiple turnarounds consisting of boilers, exchangers, piping, and heaters
Maintained schedule and budget, planned change orders when needed
Attended meetings and worked with client to achieve milestones
Worked as coordinator, where I advised and over seen other contractors to help reach deadlines, track progress and attend meetings for the Alky Turnaround at Valero
Managed crews to keep job production going, generate 3 day look ahead, execute schedule set before me by upper supervision while maintaining an excellent safety record
Work with 3rd party inspections to ensure all packages are within code and are completed to specifications outlined per package
Managed all documentation in packages ensuring everything is in order, completed, and properly signed off before transmitting to client.
Piping Foreman
TRINITY FIELD SERVICES
03.2019 - 10.2019
Managed piping crew at USC2 turnaround at Exxon Mobile Chemical
Worked on Maintenance performing various jobs throughout Exxon Mobile Chemical
Receive job tasks from management, obtain permits, and execute job tasks safely and efficiently
Maintained a zero safety incident record.
General Foreman (Nights)
SUN INDUSTRIAL GROUP, LLC
07.2018 - 02.2019
Overseeing field production at the Cameron LNG plant in Hackberry, LA
Attend meetings, updated client on production, and report any issues found in the field
Work to meet deadlines set by management
Ensuring that workers in the field are working safely and setting expectations high for quality work.
Piping General Foreman (Nights)
BISSO CONSTRUCTION
05.2018 - 07.2018
Managed night shift at the Cameron LNG in Hackberry, LA
Worked the schedule given to us from day shift
Attended meetings and set priorities and then issued it to the field
Maintained a zero incident safety record on nights.
Piping General Foreman, Piping Foreman
OHMSTEDE INDUSTRIAL SERVICES
02.2017 - 05.2018
Successfully completed multiple turnarounds in various plants/refineries
Walked down scope of work at Exxon Mobile Refinery, laid out all cut lines for tie ins, demo’d all piping, reinstalled new piping and ran all pump piping
In charge of demoing all gate valves, control valves, butterfly valves, PRV’s and reinstalling them in BASF
Over seen multiple crews, demo piping, install new piping spools, hydro test spools make tie-ins and sell packages to client.
Planner, Field Engineer, General Foreman
TURNER INDUSTRIES GROUP, LLC.
01.2014 - 02.2017
Planned work for several furnaces, built work packages, trained on quick plan and win take
Completed piping turnarounds on furnaces and BOP piping debottleneck
Conducted pre-construction meetings as well as daily/weekly meetings to review progress and initiate change orders
Successfully completed both projects under budget and well ahead of schedule
Participated in all pre-construction, construction and safety meetings with company representatives, engineers and subcontractors
Coordinated work assignments, material and equipment delivery to ensure meeting timelines and budgets
Submit RFI’s and Change Orders to the engineering firm
Work with the Iron, Civil, Piping, I&E, and Structural departments to resolve issues pertaining to their unique department’s.
Piping Foreman
Bilfinger Westcon
04.2013 - 01.2014
Attend meeting to discuss the project goals and expectations of daily tasks
Write WMR’s to receive material, spools, and supports
Hang, install, fit and weld piping spools in NatGas refinery
Manage crew to ensure job tasks are being completed safely and efficiently while maintaining a positive safety culture on the job.
Pipe Fitter, QC Tech
TURNER INDUSTRIES GROUP, LLC.
01.2012 - 04.2013
Worked as a pipe fitter reading isometrics and building spools according to drawings
Verified dimensions to the field and addressed any concerns to Foreman
Walked down packages, tracked progress, and wrote reports on what the roadblocks were so they could be mitigated to move forward with production
Work with 3rd party to ensure packages were done according to specs outlined in packages
Successfully completed debottleneck project for LyondellBasell.
Helper, Journeyman Pipefitter
ECHO MAINTENANCE
09.2005 - 01.2012
Worked Maintenance for Valero and Total Refineries
Successfully completed multiple turnarounds
Pipefitter on the rebuilding of VPS-5 at Motiva
Worked on the CEP project at Motiva in the Naptha
Worked on pumps and pump alignments, towers, exchangers and underground piping jobs.
Education
Lumberton High School
05.2005
Skills
Ability to read/interpret Isometrics
Ability to read/interpret Plot Plans
Ability to read/interpret Org Charts
Ability to read/interpret Schedules
Ability to read/interpret Structural drawings
Ability to read/interpret Piping drawings
Ability to read/interpret Civil drawings
Ability to read/interpret Electrical drawings
Ability to read/interpret Instrumentation drawings
Supervisory abilities
Organizational abilities
Time-management abilities
Microsoft Word
Microsoft Excel
Microsoft Project
E-mail
Internet Search
Certification
TWIC card
NCCER Pipe Fitter
NCCER Plus Pipe Fitter
LOCKRING Certified
References
Chad Hein, Maintenance Supervisor, Valero PA, (409) 225-1584