Summary
Overview
Work History
Education
Skills
Accomplishments
Affiliations
Certification
Timeline
Generic

Bryan Clark

Elk Grove,CA

Summary

Construction professional with 10+ years of experience. The goal is to provide flawless preparation, oversight, and expert precision in my field of work. As a project manager, I maintain a level of excellence and the ability to evaluate condition and make recommendations to correct and improve. I maintain professionalism and responsibility for the leadership of the assigned project and the project teams and the overall management of project budgets, schedules, inventory, and report outs.

Overview

13
13
years of professional experience
1
1
Certification

Work History

Assistant Manager

Executive Documents
10.2021 - Current
  • Team's point of contact for all issues.
  • Manage project plan for on-going initiatives.
  • Provide customer service to company clients.
  • Negotiate, analyze, and prepare purchase order agreements, subcontracts, and cost control budgets.
  • Ensuring highest possible standards and service is received from third party companies.
  • Helping to drive operational change for better business performance.
  • Delegating tasks and then monitoring staff performance.

Senior Lead/Journeyman Glazier

Mohawk Glass
10.2019 - 07.2021
  • Removed damaged walls, walkways, partitions, and other similar structures in preparation for repairs.
  • Maintained adequate stock of saws, grinders, hammer drills, lasers, and other tools and utilized such objects to complete projects.
  • Operated suction cups to lift large, heavy pieces of glass; operated moving/lifting equipment with boom lift (45ft or 60ft) and scissor lifts.
  • Read and interpreted drawings, plans and specifications to complete projects accurately.
  • Fabricated and installed break metal, store front, and curtain wall for glass installation using aluminum framing; installed aluminum structural components including aluminum doors and mirror glass handrails.

Project Manager

Stuppy, Inc./DPR Construction
02.2020 - 09.2020
  • Met with new and existing clients to develop improvement plans.
  • Supported senior project manager by completing projects and problem resolution under tight budgets and schedule demands.
  • Supervised coworkers and managed communicating with team leads for other specialties working on each project.
  • Assisted with planning, budgeting, vendor selection and quality assurance efforts.
  • Defined clear targets/objectives, communicated them to other team members, and delegated duties to team members
  • Monitored timelines and flagged potential issues to be addressed.
  • Read and interpreted blueprints and specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required.
  • Developed and initiated projects, managed costs, and monitored performance.

Journeyman Glazier

McKernan Construction, Inc.
08.2019 - 10.2019
  • Worked on new, state-funded High Grove Elementary School, made of concrete, steel, and glass.
  • Identified obstacles and used independent judgment to make decisions and solve problems.
  • Measured client sites to generate estimates for supplies and expenses necessary for installations.
  • Loaded and arranged glass/mirrors onto delivery trucks using suction cups to secure materials during crane transfer.
  • Communicated effectively with customers and team members concerning quality standards, deadlines and customer requests.
  • Monitored work site safety operations to prevent hazards and cultivate efficiency.
  • Selected color, type and thickness of glass and materials for moldings according to project specifications and structural requirements.
  • Fabricated and installed break metal, store front, and curtain wall for glass installation using aluminum framing; install aluminum structural components including aluminum doors and mirror glass handrails.

Lead Installer

Tradesmen International Staffing
11.2017 - 10.2019
  • Developed and executed layout and installation of electrical wiring and fixtures based on job terms and city regulations.
  • Laid out materials and system components to prepare for installation.
  • Removed damaged materials as part of project demolition.
  • Loaded and unloaded building materials used for construction.
  • Operated tools, equipment, and machinery according to safety standards.
  • Inspected installations to check for functionality and maintain customer satisfaction.
  • Read and interpret blueprints or specifications to determine size, shape, color, type, or thickness of glass, location of framing, installation procedures, or staging or scaffolding materials required
  • Fit, install, repair, and/or replace glass or glass substitutes, including aluminum, in building interiors.

Assistant Project Manager

So. Cal Glass
11.2015 - 11.2016
  • Maintained tactical control of project budgets and timelines to keep teams on task and achieve schedule targets.
  • Supported senior manager by completing projects and problem resolution under tight budgets and schedule demands.
  • Manage current and previous bids by maintaining submitted and approved estimations.
  • Helped create new filing and organizational systems, using Microsoft Excel and Google Drive; filing system including sorting and listing of commercial vendors, business credit card receipts, employee handbook, emergency pamphlets, and company guidelines and policies.
  • Maintain door orders and packages, as well as electrical components including electric panic, magnetic lock, and keypad entrances.
  • Oversee ordering of hardware supplies, office supplies, and any special order not pertaining to a specific job thru ESUB.

Installer

So. Cal Glass
06.2012 - 11.2016
  • Laid out materials and system components to prepare for installation.
  • Completed troubleshooting of malfunctions and diagnosed issues.
  • Inspected installations to check for functionality and maintain customer satisfaction.
  • Installed complete systems at new and existing business construction sites.
  • Maintain door orders and packages, as well as electrical components including electric panic, magnetic lock, and keypad entrances.
  • Operated tools, equipment, and machinery according to safety standards.
  • Maintained strong focus on safety and efficiency to provide comprehensive support to personnel performing skilled repairs.
  • Worked with diverse types of weather and ground conditions.

Janitor

Riverside University Health System Medical Center
06.2011 - 06.2012
  • Followed procedures for use of chemical cleaners and power equipment to prevent damage to floors.
  • Mixed, used, and properly stored hazardous chemical cleaners to reduce risk of injury or illness.
  • Responded immediately to calls from personnel to clean up spills and wet floors.
  • Sanitize all surfaces with the use of hospital ordained cleansers, such as Clorox Healthcare Bleach/Peroxide Germicidal Cleaner for maximum disinfection; assist with floor care, which includes mopping, stripping, waxing and sealing.
  • Properly contain and remove chemo/hazardous wastes and sterilized it using autoclave machine before disposing and compacting.
  • Resupply all soap/sanitizing/toiletry machines around the hospital; remove old pharmaceutical bins and exchange with new ones, then process old bins by dating and storing in designated area.
  • Assist with moving furniture, room rearrangement, and full room/conference room setups for any/all occasions.

Education

Associate of Arts - African-American Studies

Riverside City College
Riverside, CA
12.2024

High School Diploma -

Grant Union High School
Sacramento, CA
06.2004

Skills

  • Over 10 years of experience in management, supervision, and resourceful and self-confident
  • Health and Safety Compliance
  • Operational Efficiency and Safety
  • Best Practices and Standards
  • OSHA 10 certified
  • Proficient in Microsoft Office, specifically Excel, Project, and Word
  • Boom lift and Scissor lift certified
  • Fall Protection certified
  • Swing stage trained
  • Facility Operations
  • Inspection Coordination
  • Healthcare Regulations
  • Performance Assessment

Accomplishments

  • Worked on state-of-the-art greenhouse construction of the new 2-story 30,000-square-foot concrete, steel, and glass building at University of California, Riverside.
  • Used Microsoft Excel to develop inventory tracking spreadsheets.
  • Supervised team of 10-15 staff members.
  • Led over 20 projects that were all completed within budget and on schedule.
  • Managed construction of a 30,000-square foot building.

Affiliations

International Facilities Management Association (IFMA)

Certification

OSHA 10 Certified

Otay Mesa Certified to operate boom lifts, scissor lifts, and forklifts

Fall Protection Certified

Knowledge of building codes and regulations for different building types and construction contracts


Timeline

Assistant Manager

Executive Documents
10.2021 - Current

Project Manager

Stuppy, Inc./DPR Construction
02.2020 - 09.2020

Senior Lead/Journeyman Glazier

Mohawk Glass
10.2019 - 07.2021

Journeyman Glazier

McKernan Construction, Inc.
08.2019 - 10.2019

Lead Installer

Tradesmen International Staffing
11.2017 - 10.2019

Assistant Project Manager

So. Cal Glass
11.2015 - 11.2016

Installer

So. Cal Glass
06.2012 - 11.2016

Janitor

Riverside University Health System Medical Center
06.2011 - 06.2012

Associate of Arts - African-American Studies

Riverside City College

High School Diploma -

Grant Union High School
Bryan Clark