Motivated Field Supervisor proficiently manages personnel in variety of project scenarios. Facilitates successful operational procedures with insight into specific task requirements. Tactful communicator provides advantageous guidance toward ideal results.
Work History
Drill Locator
3 Months
South Coast Resolutions | 2026.06 - Current
Utilized advanced locating technology to enhance accuracy of drill positioning and reduce operational delays.
Implemented process enhancements that improved workflow efficiency and minimized environmental impact.
Implemented safety protocols during drilling operations, minimizing incidents and injuries on job sites.
Evaluated soil conditions prior to drilling, ensuring optimal equipment usage and avoiding potential hazards.
Contributed to environmental preservation efforts by following strict regulatory guidelines when conducting drills.
Underground Construction Supervisor
1 Year 6 Months
MasTec Network Solutions | 2025.03 - Current
Oversaw daily construction operations, ensuring adherence to safety regulations and project timelines.
Coordinated with subcontractors to optimize workflow and enhance project delivery efficiency.
Mentored junior staff on best practices in construction techniques and safety protocols.
Implemented quality control measures, improving compliance with industry standards across projects.
Managed resource allocation and material procurement to minimize delays and reduce costs.
Field Supervisor
8 Months
Prince Telecom | 2024.07 - 2025.03
Responsibilities
Monitoring sub-contractors performance for compliance with regulations and policies.
Supervised field operations teams to complete projects within established timelines.
Maintaining accurate records of field activities, ensuring proper documentation was available for internal reviews and audits.
Resolving customer complaints to maintain satisfaction and loyalty.
QCI (Quality Control Inspector)
4 Months
SQUAN | 2024.03 - 2024.07
Responsibilities
Ensure proper conduit depth for and during underground boring
Ensure fiber is properly over-lashed and distanced from neutral
Pin KMZ files according to drawings and specifications
Submit daily reports pertaining to crew locations and work performed/completed
Submit close-out packages.
Prepared reports detailing findings of inspections, investigations, and tests.
Ensured compliance with industry regulations through meticulous attention to detail during inspections.
Ensured timely completion of projects with effective time management and prioritization of tasks.
Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
Inspected completed work to verify quality standards and compliance with criteria.
Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
4G/5G Installs (Verizon)
B66, LAA, CBRS Radio Installs (pole tops)
Occasional rooftop installations.
Small Cell Foreman/Macro
1 Year 11 Months
PIKE TELECOM | 2019.07 - 2021.06
Responsibilities
Checked equipment to determine if maintenance was required.
Reviewed project details to specify correct materials and equipment for job sites.
Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
Monitored progress against established benchmarks, adjusting strategies as necessary to meet targets consistently.
4G/5G Installs (AT&T)
Macro Builds (AT&T/Verizon)
Netsure 7000 Power Plant Installs (Verizon)
Underground Fiber.
Tower Technician I/ Warehouse
2 Years 7 Months
MASTEC, INC. | 2016.12 - 2019.07
Responsibilities
Executed precise antenna alignments using specialized tools to ensure optimal signal strength in targeted coverage areas.
Assisted in rigging operations for safe hoisting of heavy equipment on towers during installation projects.
Determined required installation methods and assembled proper tools and equipment to complete projects to specifications.
Contributed to positive team morale by maintaining a professional attitude among challenging weather conditions or difficult job sites.
Color Coding jumpers, rec cables, fibers
250+ feet tower climbing
Mount swaps
Relocating radios, building antennas and radios
Mounting radios/ antennas to boom faces
Routing fiber, power, and RETs to squid
Rigging tower
Operating Capstan Hoist
Pulling, delivering, and picking up sites
Deliver and pick up material from CSSL.
Civil Foreman
2 Years 7 Months
MASTEC, INC. | 2016.12 - 2019.07
Responsibilities
Led teams in achieving successful completion of complex construction projects, showcasing strong problem-solving skills and adaptability under changing circumstances.
Consistently exceeded performance targets while meeting strict deadlines on multiple concurrent projects.
Developed comprehensive risk assessments for potential hazards on job sites, leading to a reduction in accidents and injuries among crew members.
Trained workers in proper methods, equipment operation and safety procedures.
ODN 512/Netsure 7000 Power Plant Installs (AT&T)
Flex-16 Installs (AT&T)
Power Plant Cut-Overs (AT&T)
Small Cell (Sprint)
Firefighter
1 Year 4 Months
SHELBY FIRE AND RESCUE | 2015.06 - 2016.10
Responsibilities
Performed life-saving procedures during medical emergencies, administering CPR and first aid as needed.
Responded to emergency medical calls to perform lifesaving procedures and other emergency medical services.
Collaborated with fellow firefighters to execute efficient firefighting strategies, mitigating property damage and loss of life.
Drove and operated structural pumpers, tankers, ladders, and service vehicles to aid in rescue operations.
Operated fire hoses, hydrants and extinguishers to eliminate fire and prevent from spreading.
Trained new firefighters to comply with safety protocols and equipment usage.
Education
Certified Firefighter I and II
CLEVELAND COMMUNITY COLLEGE | Shelby, NC | 2 2014
Certified by Cleveland County Department of Health
Hazmat Technician
Emergency Medical Training Certificate
Technical Rescue Certified
High School Diploma
Cherryville High School | Cherryville, NC | 5 2012
- Sports Medicine
Gardner-Webb University | Boiling Springs, NC | 2012
Skills
Field Operations
Schedule Coordination
Operations Planning
Project monitoring
Task Delegation
Quality Control
Site preparation
Site Management
Subcontractor Management
Strategic Planning
Environmental awareness
Team Leadership
References
Chris Sloce, (423) 723-5249, Freedom Communications & Management