Summary
Overview
Work History
Skills
Languages
References
Timeline
Generic

Juan Carmona

Indio,CA

Summary

Highly-motivated employee with a desire to take on new challenges. Strong work ethic, adaptability, and exceptional interpersonal skills. Adept at working effectively unsupervised and quickly mastering new skills.

Overview

1
1
Language
6
6
years of professional experience

Work History

Electrical labor

Qcells
Clinton, Missouri
05.2026 - 09.2026

Electrical Laborer – Utility-Scale Solar

•Assist electrical crews with installation of DC and AC electrical systems.

•Assisted in installation of conduit, raceways, cable tray, pull boxes, and electrical supports, ensuring structural integrity and compliance with project specifications.

•Assist with pulling DC wire, AC cable, MV cable, grounding wire, and communication/fiber cable.

•Support trenching operations and underground conduit installation.

•Help install combiner boxes, CAB systems, inverters, transformers, and other electrical equipment.

•Perform basic wire management, labeling, and cable organization.

Assist with grounding and bonding installations.

•Stage and distribute electrical materials, tools, conduit, cable, and equipment.

•Measured, cut, bent, and assembled conduit according to precise specifications, contributing to efficient electrical system layout.

•Organized tools and materials to maintain cleanliness of work areas, promoting safety and efficiency on site.

•Spot equipment and assist operators during excavation and material-handling activities.

•Follow LOTO procedures, PPE requirements, and project safety policies.

•Use hand and power tools safely and properly.

•Follow electrical drawings, installation details, and instructions from electricians and foremen.

•Support daily production goals while maintaining quality and safety standards.

Counter top Installer

Sullivans Stone & Shutter
Indio, CA
05.2020 - 04.2026

  • Installation:Installed custom granite, marble, and quartz countertops in residential and commercial spaces with high precision.
  • On-Site Modification: Measured, cut, edged, and polished stone slabs using wet saws, grinders, and specialized hand tools.
  • Finishing & Sealing: Applied professional sealants and caulking to protect stone surfaces from stains and water damage.
  • Site Preparation: Leveled cabinets, smoothed surfaces, and reinforced bases prior to stone placement.
  • Demolition & Removal: Safely removed and disposed of old laminate, tile, or stone countertops without damaging surrounding cabinetry.
  • Safety & Transport: Loaded and transported heavy granite slabs safely, maintaining a clean workspace
  • Customer Service: Communicated with clients and contractors on-site to address concerns and ensure total project satisfaction.

Skills

  • Conduit installation
  • Cable pulling
  • Electrical grounding
  • LOTO procedures
  • Installation
  • Worksite Coordination
  • Client Communication

Languages

Spanish
Professional

References

References available upon request.

Timeline

Electrical labor

Qcells
05.2026 - 09.2026

Counter top Installer

Sullivans Stone & Shutter
05.2020 - 04.2026
Juan Carmona