Summary
Overview
Work History
Education
Skills
Accomplishments
Languages
Timeline
Generic

Juan Giron

Austin,TX

Summary

With a proven track record at Texas Highway Walls, I excel in crew leadership and heavy machinery operation, enhancing project efficiency by 30%. My expertise in construction processes and critical thinking ensures quality control and seamless site coordination. I foster teamwork, driving projects to successful completion with keen attention to detail and a dedicated work ethic.

Overview

7
7
years of professional experience

Work History

Labor Foreman

Great Hills Constructors
05.2024 - Current
  • Updated logs and reported on job progress.
  • Demonstrated adaptability by effectively managing changes in project scope or unexpected obstacles encountered during construction phases.
  • Implemented cost-effective solutions to address challenges faced during construction projects without compromising quality or safety measures.
  • Managed daily operations effectively, ensuring smooth workflow and timely completion of tasks.
  • Coordinated with subcontractors, ensuring seamless integration of their services into ongoing projects while maintaining schedule
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Mitigated risk, identifying potential issues early and developing contingency plans.
  • Work together with Traffic Control to ensure a safely transportation of Loads when required

MSE Wall Foreman

Texas Highway Walls
07.2021 - 02.2024
  • Texas Highway Walls is a subcontractor company specialized in the development of MSE Walls where I worked in a Variety of Projects for Contractors like; LANE, Abrahams, Webber, Zachry, Flat Iron, Jordan Foster, etc.
  • I have experience at numerous projects including but not limited to; Lane proyect, 183 North at Leander and Cedar Park, Austin Bridge and Roads project at 620 Round Rock, Webber projects at i35 San Marcos and New Braunfels, Abrahams projects at i35 and Ronald Reagan Georgetown, Zachry project at 75 South East Austin, Flat Iron project at 181 Corpus Christi
  • In my time working as a Foreman I supervised the development of MSE Walls from bottom to top, including but not limited to, Building leveling pad, set and back fill pre-cast panels, install underdrain, install pre-cast Coping and Cast In Place Coping, Pour Slabs etc
  • My duties in this position where to ensure the quality and productivity of my team, following procedures, plan specs and safety protocols set by each Contractor on every project. Coordinating with Superintendent and other Formens in order to complete daily and overall goals as described in the next points
  • Ensured timely completion of projects with effective time management and prioritization of tasks.
  • Championed company values through consistent modeling of ethical behavior and adherence to corporate policies.
  • Raised overall crew proficiency with ongoing skill development initiatives targeting areas identified for improvement.
  • Developed strong relationships with clients, subcontractors, and suppliers, fostering open communication channels for smooth project execution.
  • Oversaw daily operations at site, keeping team production moving at optimal pace.
  • Addressed issues proactively, resolving problems quickly to minimize delays in project timelines.
  • Collaborated with project managers in planning stages, advising on schedule adjustments and potential obstacles.
  • Inspected completed work to verify quality standards and compliance with criteria.
  • Adapted workflows in response to changing environmental conditions or unexpected challenges encountered during construction activities.
  • Conducted thorough quality control checks to ensure high standards of workmanship across all projects.
  • Successfully mitigated risks associated with complex projects by conducting thorough risk assessments and implementing appropriate contingency plans.
  • Enhanced team productivity by providing clear direction, setting expectations, and offering constructive feedback.
  • Maintained a safe working environment through adherence to safety protocols and regular site inspections.
  • Created and implemented plans to maximize efficiency of workers.

Heavy Equipment Operator

Texas Highway Walls
09.2018 - 08.2021
  • In my time working as a Heavy equipment operator with Texas Highway Walls I assisted my coworkers and supervisors to meet daily and overall goals. Completing tasks such as; Move Materials around jobsites, Backfill and grade, Dig ditches, Load and unload Materials and Equipment, used equipment to set wall pieces such as pre-cast panels, pre-cast Coping and barriers, etc
  • My experience as a heavy equipment operator cover a variety of equipment including but not limited to; Front End Loader, Excavator, Bulldozer, Forklifts, Boomlifts, Backhoe, Skidsteer etc.
  • My Job dutties and skills are described in the next points
  • Loaded and moved materials such as dirt and rocks based on specific job needs.
  • Adhered to instructions from supervisors and engineers onsite.
  • Met project demands consistently through careful and consistent operation of heavy equipment.
  • Performed thorough pre-shift and post-shift inspections and accurately completed equipment logs and reports.
  • Moved equipment between job locations using truck and trailer.
  • Trained in diverse pieces of equipment and useful attachments to handle team needs.
  • Contributed to a positive work environment through effective teamwork, communication, and adherence to safety protocols.
  • Improved fuel efficiency by monitoring equipment usage and implementing energy-saving techniques during operation.
  • Remove debris and leveled ground to prepare job sites for construction projects.
  • Assisted in training new hires on proper operation techniques and safety procedures for various pieces of heavy equipment.
  • Collaborated closely with site engineers and project managers to ensure accurate implementation of construction plans.
  • Transported materials and equipment to and from construction sites.
  • Worked effectively in fast-paced environments.
  • Self-motivated, with a strong sense of personal responsibility.
  • Mitigated project delays, swiftly adapting to changing weather conditions and site challenges.
  • Demonstrated strong organizational and time management skills while managing multiple projects.
  • Developed and maintained courteous and effective working relationships.
  • Proved successful working within tight deadlines and a fast-paced environment.

Carpenter and Roofer

MNS Construction
11.2017 - 08.2018
  • Demonstrated close attention to detail to verify quality and accuracy of work.
  • Streamlined project timelines by quickly adapting to changing client needs or design specifications while maintaining quality standards.
  • Contributed to successful completion of commercial projects
  • Assisted in site preparation and cleanup activities to ensure efficient project workflow and minimize disruptions for clients or other construction teams.
  • Effectively used nails, screws, pneumatic nailing systems, concrete anchors, powder-actuated fasteners and framing connectors.
  • Managed inventory of tools, supplies and equipment.
  • Followed protocols and stayed organized to provide personal and teammate safety.
  • Shaped or cut materials to specified measurements using hand tools, machines and power saws.

Education

Jhon Tyler High-school
Tyler, TX
06.2017

Skills

  • Producing schedules
  • Crew Leadership
  • Safety practices
  • Coordinating tasks
  • Heavy machinery
  • Construction processes
  • Supply Ordering
  • Construction expertise
  • Teamwork and Collaboration
  • Attention to Detail
  • Critical Thinking
  • Dedicated Work Ethic
  • Site coordination
  • Heavy Lifting
  • Quality Control
  • Blueprint Interpretation
  • Daily Reporting
  • Crew Scheduling
  • Language Fluency
  • Repairing wall surfaces
  • Fall protection
  • Operations supervision
  • Problem-Solving

Accomplishments

I thrive for my succes and the succes of my job, I enjoy the challenges and I like to prove myself, always looking for grow and opportunities, from common labor to carpenter to operator, and finally to Foreman I don't plan on stopping here, I'm ambitious and that's proven on my Job Historial

Languages

Spanish
Native or Bilingual
English
Full Professional

Timeline

Labor Foreman

Great Hills Constructors
05.2024 - Current

MSE Wall Foreman

Texas Highway Walls
07.2021 - 02.2024

Heavy Equipment Operator

Texas Highway Walls
09.2018 - 08.2021

Carpenter and Roofer

MNS Construction
11.2017 - 08.2018

Jhon Tyler High-school
Juan Giron