Summary
Overview
Work History
Education
Skills
Accomplishments
Timeline
Generic

Juan J. Reyes

Moreno Valley,CA

Summary

Experienced General Foreman with a robust history at Steve P Rados, showcasing strategic planning and exceptional organizational skills. Spearheaded major waterline projects and infrastructure overhauls, demonstrating technical expertise and a commitment to safety. Proven leader, motivating teams to achieve and surpass objectives with precision and dependability.

Overview

27
27
years of professional experience

Work History

General Foreman

Steve P Rados
Hemet, CA
06.2023 - Current
  • MWD, near the city of Winchester, installed a 96' water line and connected it to a 12-inch diameter California aqueduct.
  • MWD and EMWD in the city of Hemet installed 3 miles of 60' waterline and a pump station.
  • City of Palm Springs at the wastewater treatment plant, demo and rebuild the sludge concrete tank, relocate the sludge and methane gas lines, and install the gas holder.

Field Drainage Supervisor

Lane Security Paving
Ontario, CA
01.2020 - 01.2022
  • Supervising over 100 employees on drainage crews and carpenter crews, adding and relocating storm drain pipes, and reinforcing concrete boxes along the 10 FWY on a 7-mile stretch. And supervise subcontractor Irvine Pipeline on relocating water lines along the freeway and installing new water lines at new bridges. Attend meetings, set up traffic control for crews, set up trucks.

Field Supervisor

OHL
Anaheim, CA
01.2019 - 01.2020
  • OCSD for the city of Anaheim supervising crews upgrading sewer trunk line and relocating waterlines on a 3-mile stretch on State College Blvd. Utilize beam and plate on shoring trenches 20" to 30" trench depth.

Pipeline Foreman

CP Construction
Upland, CA
01.2018 - 01.2019
  • Pipeline foreman on relocating and upgrading water lines and sewer lines for Ontario, Upland, city's.

Pipeline Foreman

SRD Engineering
Anaheim, CA
01.2017 - 01.2018
  • City of Orange, install a new 36" RCP. for a storm drain line, and drain inlets.

Field Supervisor

Atkinson Walsh Joint Venture
Corona, CA
01.2015 - 01.2017
  • Field supervising from 2015 to 2017 at the 91 FWY corridor extension. Relocating water lines, sewer lines, and adding a new storm drain system along the freeway, while supporting civil crews in widening travel lanes.

Pipeline Foreman

Surina Construction Co.
Bloomington, CA
01.2010 - 01.2015
  • Installed new water lines for different water districts.

Pipeline Foreman

Bonadiman-McCain
San Bernardino, CA
01.2001 - 01.2006
  • Installed big RCP drain pipes on city streets for the cities of Riverside, Redlands, and San Bernardino.

Pipeline Foreman

Albert W. Davies
Upland, CA
01.2003 - 01.2005
  • Installed big RCP waterlines for Chino Upland and other agencies on city streets.

Pipeline Foreman

Steve P. Rados
Santa Ana, CA
01.1998 - 05.2001
  • MWD Inland Feeder: 7-mile stretch of 12-inch diameter water main. Near the city of Hemet.
  • Drain pump station at the City of El Segundo.
  • Alemada Corridor installed new water lines, storm drains, street improvements, and bridges.

Education

Sexual Harassment Prevention Training -

OHL Corp
11-2022

OSHA 30 Hour Construction -

Click Safety
03-2020

Confined space course -

01.2017

Fall protection course -

01.2017

First-aid CPR course -

01.2017

UPR railroad course -

01.2016

Pipe asbestos removal training -

01.2016

Traffic control training -

01.2015

Trench Shoring And Excavation Competence -

Moreno Valley Community Adult School
10-2013

GED high school diploma -

01.2013

Skills

  • Strategic planning
  • Analytic skills
  • Technical skills
  • Organizational skills
  • Detail oriented
  • Motivated
  • Self-started
  • Dependable
  • Safety awareness

Accomplishments

  • 18”-72” RCP and 5’ x 10’ RCP
  • 54” sewer and 12” water line Anaheim
  • 16”-12” CML water lines and RCP Upland, Ontario
  • Storm drains and CMLC water lines Orange and Marina Del Rey
  • 91 Freeway water and sewer mains Corona
  • 12” ductile, 30” CML, 16” pvc water mains Riverside, Joshua Tree
  • 8”, 18”, 24” VCP sewer mains Riverside
  • 42” CML water line Rancho Cucamonga, 84” SD Chino
  • 72”, 60” 24” SD Hemet, San Bernardino, Redlands
  • 10” to 42” water sewer mains Southern California
  • M. W. D. 7 Miles 149” water main Inland Feeder
  • Redondo Beach project sewer main using Slide Rail Shoring System
  • Alameda Corridor North End. S.D., water, sewer mains, bridge
  • El Segundo CA S.D. pipe and pump station
  • Vallejo CA 42” sewer main using Slide Rail Shoring System

Timeline

General Foreman

Steve P Rados
06.2023 - Current

Field Drainage Supervisor

Lane Security Paving
01.2020 - 01.2022

Field Supervisor

OHL
01.2019 - 01.2020

Pipeline Foreman

CP Construction
01.2018 - 01.2019

Pipeline Foreman

SRD Engineering
01.2017 - 01.2018

Field Supervisor

Atkinson Walsh Joint Venture
01.2015 - 01.2017

Pipeline Foreman

Surina Construction Co.
01.2010 - 01.2015

Pipeline Foreman

Albert W. Davies
01.2003 - 01.2005

Pipeline Foreman

Bonadiman-McCain
01.2001 - 01.2006

Pipeline Foreman

Steve P. Rados
01.1998 - 05.2001

Sexual Harassment Prevention Training -

OHL Corp

OSHA 30 Hour Construction -

Click Safety

Confined space course -

Fall protection course -

First-aid CPR course -

UPR railroad course -

Pipe asbestos removal training -

Traffic control training -

Trench Shoring And Excavation Competence -

Moreno Valley Community Adult School

GED high school diploma -

Juan J. Reyes