Summary
Overview
Work History
Education
Skills
Certification
Timeline
Generic

JUAN MUNOZ

Falfurrias

Summary

Strategic Supervisor with expertise prioritizing projects, planning workflow and managing employees to achieve operational goals. Resourceful individual with 10 plus years of Industrial Refinery experience. Diplomatic individual with strong leadership and decision-making skills. Responsible Foreman /General Foreman with excellent project oversight, team management and blueprint interpretation skills coupled. Achieves project milestones and adheres to deadlines and quality standards.

Overview

10
10
years of professional experience
1
1
Certification

Work History

Heavy Lift Rigger

Bechtel Construction Company
11.2022 - Current

• Rigged up, flagged, and derigged 20 heavy hydrocarbon cold boxes - Job #26290 in Corpus Christi Liquification Stage 3 Project with use of 180 ft manlift. In this tandum lift (MLC 650 & MLC 300), a total of 11,880 lbs on main crane & 3,106 lbs on tail crane of rigging was used to trip including rolling blocks and spreader bar; total weight of cold box was 337,197 lbs.

• Rigged up, flagged, and derigged 4 compressor skids - Job #26290 in Corpus Christi Liquification Stage 3 Project, a total rigging weight of 22,208 lbs was used to rig up to compressor skid which was flown with MLC 650 with total weight of skid at 639,120 lbs.

•Set 6 radiant modules with a total rigging weight of 2,670 lbs - Job #00057 at Corpus Christi Liquification Stage 3 in Gregory, Tx (Trains 1-6) (MLC 300); a total weight 231,324 lbs.

• Rigged up, set & derigged 20 fin fans at Corpus Christi Liquification Project Stage 3 with use of 3,806 lbs of rigging, a total weight of (MLC 650)

• Rigged up, set, and derigged 5 mercury H2S absorbers (1101A & B) at Corpus Christi Liquification Stage 3 (Trains 1-5) (MLC 300 & Liebherr 1250) with a total weight of 182,000 lbs on main crane

• Rigged up, set, derigged with use of manlift 180, convention and transition combined a total weight of 126,096 lbs. Total weight of rigging of 1,930 lbs. MLC 300 was used to set transition


• Strengthened communication skills through regular interactions with others.

• Proven ability to learn quickly and adapt to new situations.

• Identified issues, analyzed information and provided solutions to problems

• Worked flexible hours across night, weekend and holiday shifts.

• Used critical thinking to break down problems, evaluate solutions and make decisions.

• Demonstrated respect, friendliness and willingness to help wherever needed.

• Skilled at working independently and collaboratively in a team environment.

• Passionate about learning and committed to continual improvement

Rigger

Kiewitt Offshore Services
09.2022 - 11.2022

• Secured safety equipment and always used gear according to requirements for the Sala Manca Phase.

• Worked at heights and in confined spaces without difficulty.

• Operated cranes, hoists and winches to lift, position and place heavy objects

• Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.

• Prepared steel components for assembled bent sections and connectors.

• Anchored pieces to fixed structures with bolts and clamps.

• Monitored pressure and maintained proper fluid and fuel balance.

• Maintained rig engines and motors.

• Communicated with equipment operators to accomplish smooth and efficient transports.

• Rigged for heavy lifts according to blueprint requirements.

• Rigged cables and pipes in configurations to support loads and maintain crew safety.

• Determined correct rigging requirements for equipment based on job specifications and environmental conditions.

• Assembled and installed rigging and lifting equipment to support lifting operations.

• Developed strong communication and organizational skills through working on group projects.

Owner

3MB Constructors Services
04.2021 - 09.2022

• Enhanced operational efficiency and productivity by managing budgets, accounts, and costs while building Concrete slabs which contained rebars as reinforcements (8beams at 2 ft by ft thickness 34 ft long at 12 inch centers 1500 sq ft houses containing 50-60 yards of concrete

• Ordered materials and scheduled cement trucks.

• Devised and implemented safety protocols to reduce risks on construction and extraction sites.

• Directed projects according to schedule and quality demands.

• Adapted concrete pouring and mixing plans to daily weather and climate.

• Created specific finishes on poured concrete.

• Mixed, spread, and patched concrete to specifications.

• Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.• Oversaw daily operations at site, keeping team production moving at optimal pace.

• Trained workers in proper methods, equipment operation and safety procedures.

• Measured precise amounts of concrete and verified levelness to improve quality of finished product.

• Enhanced operational efficiency and productivity by managing budgets, accounts, and costs while building Concrete slabs which contained rebars as reinforcements (8beams at 2 ft by ft thickness 34 ft long at 12 inch centers 1500 sq ft houses containing 50-60 yards of concrete

• Ordered materials and scheduled cement trucks.

• Devised and implemented safety protocols to reduce risks on construction and extraction sites.

• Directed projects according to schedule and quality demands.

• Adapted concrete pouring and mixing plans to daily weather and climate.

• Created specific finishes on poured concrete.

• Mixed, spread, and patched concrete to specifications.

• Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

• Oversaw daily operations at site, keeping team production moving at optimal pace.

• Trained workers in proper methods, equipment operation and safety procedures

• Measured precise amounts of concrete and verified levelness to improve quality of finished product.

Foreman

Agave Sales & Services, LLC
02.2020 - 04.2021

• Supported construction and extraction workers to facilitate timely completion of 1500 square ft living houses for FEMA from the rebar installed to the framing and roofing. foundations included 2 percent dropes from middle to outside and 2 ft by 2 ft beams (8 beams per house )

• Directed projects according to schedule and quality demands.

• Provided feedback to workers on job performance and safety procedures.

• Developed and implemented new procedures to increase productivity and constructiveness.

• Handled issues with relative ease by implementing best practices and applying critical thinking skills to find best solutions.• Addressed issues with employees and customers to manage healthy conflict resolutions.

• Monitored job progress and performance of employees or contractors to complete projects prior to deadlines.

• Reviewed project details to specify correct materials and equipment for job sites.

• Inspected completed work to verify quality standards and compliance with criteria.

• Oversaw daily operations at site, keeping team production moving at optimal pace.

• Collaborated with management and fellow supervisors to organize operations and achieve demanding schedule targets.

• Studied and interpreted blueprints to plan construction phases and team assignments.

• Reworked positions and workflow based on individual abilities and production targets

Rodbuster Foreman

Mesa Mechanical

• Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks during the process of finishing 85 pipe racks with contained 1 column of 5 ft tall 2 ft by 2 ft with a footing at 6 ft by 6 ft wide connected with a 4 foot long, 1 ft by 1 ft beam on 4 inches on center

• Determined size, shape, placement, and material of supports based on blueprints and structural standards.

• Determined quantities, sizes and locations of reinforcing rods from blueprints or oral instructions

• Defined placements of bars and necessary reinforcements by reading maps and blueprints.

• Inspected completed work for accuracy and adherence to building codes and safety standards.

• Reviewed work plans and blueprints to ascertain all requirements for project.

• Positioned and secured steel bars or mesh using fasteners or hand tools.

• Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.

• Moved steel reinforcements daily from various staging areas to desired reinforcement locations using proper safety procedures.

• Reinforced concrete slabs and pieces by placing and securing steel bars to enhance and extend life of structures.

• Positioned rebar and other iron reinforcement following pouring of concrete.

Rodbuster

Bechtel Construction Company
01.2018 - 02.2019

• Positioned and secured steel bars or mesh using fasteners or hand tools during the remaining of the OSBL area Paving on the trains and top of Tanks

• Moved 2 tons of steel reinforcements daily from various staging areas to desired reinforcement locations using proper safety procedures.

• Spaced and fastened rods using wire and pliers.

• Positioned rebar and other iron reinforcement following pouring of concrete.

• Determined size, shape, placement, and material of supports based on blueprints and structural standards.

• Studied blueprints to determine accurate lengths for reinforcement bars and cut pieces.

Foreman

Gman Construction, LLC
04.2014 - 03.2015

• Determined quantities, sizes and locations of reinforcing rods from blueprints or oral instructions, during the build of boiler maker for the Corpus Christi polyester project also known and the jumbo project.

• Defined placements of bars and necessary reinforcements by reading maps and blueprints. Which we built with 18 -25 foot columns and a 95 ft by 140 ft footing which was staggered at 8 inch ceners #8s rebar

• Placed and fastened iron rods and steel mesh together using wire and spot welds.

• Skilled in use of specialized metalworking and concrete manipulation tools to perform assigned tasks.

• Used appropriate safety measures and encouraged other team members to do same in effort to avoid job site injuries.

• Moved 1 ton of steel reinforcements daily from various staging areas to desired reinforcement locations using proper safety procedures.

• Studied blueprints to determine accurate lengths for reinforcement bars and cut pieces.

• Positioned and secured steel bars or mesh using fasteners or hand tools.

• Reinforced concrete slabs and pieces by placing and securing steel bars to enhance and extend life of structures

Education

Medical Assistant -

Kaplan College
TX

Falfurrias High School
TX

Skills

  • Heavy Machinery Operation
  • Critical Thinking Skills
  • Delegating Work Assignments
  • Operational Efficiency
  • Organizational Skills
  • Physical Strength and Stamina
  • Verify Work Quality
  • Health and Safety Compliance
  • Monitor Safety Procedures
  • Project Specifications
  • OSHA Safety Guidelines
  • Coordinate Team Operations

Certification

  • NCCER Advanced Rigger, #16558289
  • NCCER Signal Person, #16558289
  • NCCER Iron & Rebar Worker, #16558289

Timeline

Heavy Lift Rigger

Bechtel Construction Company
11.2022 - Current

Rigger

Kiewitt Offshore Services
09.2022 - 11.2022

Owner

3MB Constructors Services
04.2021 - 09.2022

Foreman

Agave Sales & Services, LLC
02.2020 - 04.2021

Rodbuster

Bechtel Construction Company
01.2018 - 02.2019

Foreman

Gman Construction, LLC
04.2014 - 03.2015

Rodbuster Foreman

Mesa Mechanical

Medical Assistant -

Kaplan College

Falfurrias High School
  • NCCER Advanced Rigger, #16558289
  • NCCER Signal Person, #16558289
  • NCCER Iron & Rebar Worker, #16558289
JUAN MUNOZ